VEND OR COVERSHEET

FY 22 Mass Solicitation / WK Park Custodian

W912DQ-22 -R-1004

C.10 Timber and School Creeks, Milford

OFFEROR'S NAME:

OFFEROR'S ADDRESS:

OFFEROR'S PH ONE#:

OFFEROR'S EMAIL:

OFFEROR'S DUNS#:

OFFEROR'S CAGE CODE:

OFFEROR'S SIGNATURE:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Job Base

Park Custodian Services – Base Period FY 22

FFP

The Government's payment for Park Custodian services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.

FOB: Destination

PSC CD: M1PA

NET AMT BASE FY 22 ____________________

0002 Job

OPTION

Park Custodian Services – Option Period FY 23

FFP

The Government's payment for Park Custodian services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.

NET AMT OPTION FY 23 __________________

0003 Job

OPTION

Park Custodian Services – Option Period FY 24

FFP

The Government's payment for Park Custodian services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.

NET AMT OPTION FY 24 __________________

TOTAL AMOUNT ALL YEARS ___________________

SEE ADDENDUM

(No Collect Calls)

W912DQ22R1004 09-Nov-2021

b. TELEPHONE NUMBER

816-389-3850

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 14 Dec 2021

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912DQ9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

CHRISTOPHER W. ANDERSON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

USACE, KANSAS CITY +

FEDERAL BLDG CT-H 601 E 12TH ST RM 647

KANSAS CITY MO 64106-2896

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

816-389-2030FAX:

TEL: 816-389-3812 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$19,500,000

NAICS:

561720

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF33

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

RELATED EXPERIENCE FORM:

This form must be completed by all offerors in order to receive consideration for award. If additional space is needed, this form may be duplicated as necessary, no more than three submissions. Information describing the offeror’s complete contracting background and experience shall be provided. The contractor’s information should only describe experience that directly pertains to the type of work set forth in this in Section C of this solicitation. Include details of any training which would enable you to better perform the work outlined in the specifications. Reference information should include the names and current telephone numbers of all agencies/firms listed.

Experience

Contract Work/Type:

Agency/Firm for Whom the Work Was Performed:

Contact Person at the Site:

Telephone:

Month/Year Work Began:

Month/Year Work Ended:

Description of Duties/Work: (Please provide details)

Form PPQ-0 (9/30/11)

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information

Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)

Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information

Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK

TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY

ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE

SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT

RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an

Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the

Contractor successfully performed a significant event that was a benefit to the

Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the

Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff

(including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations

(including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor.

E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

THIS PAGE LEFT BLANK

PARK CUSTODIAN

TIMBER CREEK AND SCHOOL CREEK PUBLIC USE AREAS

MILFORD PROJECT

PERFORMANCE WORK STATEMENT

C.1 GENERAL INFORMATION

C.1.1 BACKGROUND. Milford Lake is the largest lake in Kansas with 163 miles of shoreline at Multipurpose pool. The lake was authorized by Congress in 1954 and constructed by the Corps of Engineers in the mid 1960’s. As a multipurpose project, the lake provides for flood damage reduction, navigation, water quality, water supply, recreation, plus fish and wildlife benefits. A map of Milford Lake can be found on the Internet at: www.nwk.usace.army.mil.

Recreational development is extensive. Eleven parks and access areas, managed by or leased from the U.S. Army Corps of Engineers, are conveniently located around the reservoir. Park areas at Milford offer a wide variety of recreation facilities including boat launching ramps, campgrounds, full service marinas, picnic areas, sand and swimming beaches.

The Kansas Department of Wildlife & Parks operates a fish hatchery and nature center in the Outlet area below the dam. Many routine maintenance items are contracted to the private sector. Mowing, refuse collection, and facility cleanup are just a few of the activities that are performed by private contractors for the Corps.

On average nearly one million visitors come to Milford Lake each year. 15,709 surface acres of water include some of the best Walleye, Wiper, White Bass, Catfish and Smallmouth Bass fishing in the state of Kansas. Over 23,000 acres are managed for public hunting opportunities.

The Milford Lake dam is located about 5 miles northwest of Junction City in Geary County, Kansas, and at mile 7.7 on the Republic River.

C.1.2 SCOPE OF WORK. The Contractor shall furnish labor, equipment, and supplies to provide custodial services in the Timber Creek and School Creek Public Use Areas at Milford Project, near Junction City, Kansas as described in the attached performance work statement (PWS) and elsewhere in the contract.

C.1.3 PERIOD OF PERFORMANCE. The contract shall begin 15 April 2022 and continue through 30 September 2022 with a renewal option 15 April 2023 through 30 September 2023 and a renewal option 15 April 2024 through 30 September 2024. Work shall be performed on all Federal holidays and weekends during this period at no additional cost. Each individual work item shall be performed pursuant to the schedule for that work item set forth in Section C.5. Services rendered outside the time periods specified shall not be compensated unless specifically approved in writing by the Contracting Officer or authorized representative.

C.1.4 POST-AWARD (“PRE-WORK”) CONFERENCE. After award, but prior to start of services, the Project Office will arrange a Pre-Work Conference to be held at the Project. The purpose of the Conference is to discuss contract requirements and details of contract performance.

C.1.5 REQUIRED INSURANCE. Contractors shall obtain and maintain the following insurance policies* during the period of performance and shall provide proof of insurance to the Contracting Officer (or representative) prior to commencement of duties:

Workmen’s Compensation . . . . . Coverage complying with applicable State statute** Employer’s Liability . . . . . . . . . . Minimum $100,000 per occurrence (only IF you hire employees) Commercial General Liability. . . Minimum $100,000 per person (only CUSTODIANS need this) $300,000 per occurrence for bodily injury

$ 20,000 per accident for property damage Motor Vehicle Liability . . . . . . . . . . Minimum $300,000 per person $500,000 per occurrence for bodily injury $ 100,000 per accident for property damage

* Reference FAR 28.307-2 Liability, subparagraphs (a), (b), and (c).

** Kansas Division of Insurance, telephone (785) 296-3071 Division of Workers Compensation, telephone (800) 432-2484

C.1.6 BONDING. Not required for Park Custodians.

C.1.7 DOCUMENTS AND CORRESPONDENCE. After award all documents and related correspondence shall be routed through the Contracting Officer’s Representative (COR) or Authorized Representative (if designated) at the Project Office to the Contracting Officer. Day to day contact and telephone communication with Government personnel shall normally provide adequate information exchange. The Government reserves the right to schedule meetings at the Project Office as necessary to ensure strict compliance with the terms of this contract. Such meetings shall be scheduled, to the extent possible, at mutually convenient times. However, upon notification, the Contractor shall attend meetings regarding matters affecting this contract and the time spent in such meetings shall be at no additional charge to the Government.

C.1.8 CONTRACTOR PERSONNEL.

C.1.8.1 MANPOWER REQUIREMENT: The Contractor shall either personally perform or provide direct personal superintendence of employees engaged in the performance of duties under the contract. All employees working under this Contract shall be identified in the Contractor's proposal and shall be subject to approval of the Contracting Officer. All Contractor personnel shall be fully clothed at all times while performing these services. Clothing shall be clean and neat in appearance.

C.1.8.2 CONTRACTOR CONDUCT: Contractor personnel shall be fully clothed at all times while performing these services. Clothing shall be clean and neat in appearance. Contractor personnel shall utilize tact, diplomacy, and courtesy at all times during contact with the public. Any illegal or criminal activity may result in termination of the contract. No person performing this Contract shall consume any alcohol or drugs (except prescription drugs not affecting duty performance) during duty hours or within the eight (8) hour period next preceding duty hours.

C.1.8.3 SECURITY REQUIREMENTS: Contractors shall safeguard all Government property. Contractors shall establish and implement methods of making sure all keys issued by the Government for Contractor’s use are not lost or misplaced, and are not used by unauthorized persons. Contractors shall immediately report to the Contracting Officer or the COR any occurrences of loss, unauthorized use, or unauthorized duplication of keys. In the event keys, other than master keys, are lost or duplicated Contractors may be required upon written direction of the Contracting Officer to rekey or replace the affected lock or locks without cost to the Government.

C.1.8.4 FOUND ITEMS: To assist the visiting public in reclaiming lost articles, all property left by visitors and found during the performance of duties shall be turned in to the Project Office. Contractors shall report any instance of vandalism, facilities not operating property, or facilities in need of repair to the Project Office.

C.1.9 COORDINATION WITH THE PROJECT OFFICE.

C.1.9.1 As each item of work is completed, the Contractor's representative at the job shall enter the time that the item of work was completed on a Contractor's Daily Worksheet. Completed and signed worksheets shall be delivered each day work is performed, as directed by the Contracting Officer's Representative. Contractor Daily Worksheet (See Section C.6) forms shall be furnished by the Government.

C.1.9.2 Day to day contact with Government personnel, and telephone communication shall normally provide adequate information exchange. The Government reserves the right to schedule meetings at the

Project Office as necessary to ensure strict compliance with the terms of this contract. Such meetings shall be scheduled, to the extent possible, at mutually convenient times. However, upon notice, the Contractor shall attend meetings regarding matters affecting this contract.

C.1.10 QUALITY CONTROL (CONTRACTOR’S RESPONSIBILITY). The Contractor shall develop a Quality Control Plan designed to demonstrate how the Contractor will meet the needs of the project. The Quality Control Plan shall document how the Contractor will identify and correct performance shortfalls.

Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance

C.1.11 QUALITY ASSURANCE (GOVERNMENT’S RESPONSIBILITY).

C.1.11.1 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). A Quality Assurance Surveillance Plan will be used during the life of each contract to ensure that the service provider is performing the services required by this PWS in an acceptable manner. The Government develops the QASP, and the Project Office administers the plan through Quality Assurance Evaluators (QAEs) which monitor Contractor performance using quality assurance procedures developed by the Government.

Typical procedures might include random sampling, checklists, and customer complaints. This should not be considered an exhaustive list. A primary objective of Government Quality Assurance will be to determine the effectiveness of the Contractor’s quality control system.

C.1.11.2 INSPECTIONS. According to the Inspection of Services clause (52.246-4 Inspection of Services- Fixed Price), the Government reserves the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government will perform inspections in a manner that will not unduly delay the work.

C.1.11.3 The Contractor understands that the QASP is solely for the benefit of the Government in ensuring the Contractor completes its required work in accordance with this contract. Government officers shall never exercise supervision over the Contractor’s employees, and any defects noted shall be brought to the attention of Contractor’s designated representative. Failure of the Government to identify a defect shall not constitute waiver of the Government’s rights concerning that defect.

C.1.11.4 UNSATISFACTORY PERFORMANCE. If any of the services do not conform to contract requirements, the Government may direct the Contractor to perform the unsatisfactory services at no additional cost to the Government. Re-performance as directed by the Government shall be completed within two (2) hours. Failure of the Contractor to perform the work as specified, or to re-perform work as directed within the allotted time, may result in reduction of the contract price in proportion to the portion(s) of the work not accomplished. Amounts to be withheld will be determined by prorating the amount of services satisfactorily performed against the amount of services required. When the defects in services cannot be corrected by re-performance, the Government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements, and (2) reduce the contract price to reflect the reduced value of the services performed. Payment will NOT be made for work not performed or not performed to standard.

C.1.11.5 If the Contractor fails to promptly re-perform the services or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may (1) by contract, or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service, or (2) terminate the contract in whole or in part.

C.1.11.6 PERFORMANCE REQUIREMENTS SUMMARY (PRS).

CUSTODIAL DUTIES

Refer to 5.3, 5.4, 5.5, & 5.6.

96% compliance (4% maximum defective allowed)

1) Random Sampling

2) Public Visitor

Complaint

C.1.12 OTHER CONTRACTS. The Government may undertake or award other contracts for additional work, and the Contractor shall fully cooperate with such other contractors and Government employees. All work must be carefully planned and fitted so as not to interfere with such other work. The Contractor shall not commit or permit any act that will interfere with the performance of work by other Contractors or Government staff.

C.1.13 VOLUNTEERS. Volunteers may be utilized in the parks. Volunteers receive and follow instructions from a Government representative.

C.1.14 CONTRACTOR PETS. Contractors shall be liable for any damages or injuries caused by their pets.

When outside, pets shall be on a leash at all times.

C.1.15 SMOKING POLICY. Smoking is not allowed in any Government buildings, including shower buildings, vault toilets, Park Attendant booths, etc. Smoking is also not allowed by Contractors or their employees while in direct contact with the public.

C.1.16 FIREARMS. Neither Contractors nor their employees shall possess, during the performance of this contract, any firearm or ammunition, whether the firearm is loaded or unloaded.

C.1.17 SAFETY.

C.1.17.1 Contractors shall immediately report to a Park Ranger or local law enforcement, as appropriate, any situation that could affect the health or safety of visitors. This includes accidents, violations of laws or regulations, maintenance needs, utility problems, etc.

Contractors shall also immediately report to a Park Ranger or local law enforcement, as appropriate, any disturbance(s) of the peace, but shall not personally intercede in any such disturbance.

C.1.17.2 All services shall be performed in accordance with applicable safety requirements set forth in

Corps of Engineers Manual EM-385-1-1, “Safety and Health Requirements Manual” and supplements thereto. The EM-385-1-1 is hereby incorporated by reference, and the Contractor is required to perform this contract in accordance with the standards set forth therein. Any equipment or materials not in conformity with this manual shall be removed from Government property immediately. The Contractor will be expected to take a vital interest in safety, hazards, and to educate their employees to work and plan their work safely.

C.1.17.3 Proper driving techniques and defensive driving will be practiced to prevent vehicle accidents and property damage. All vehicles will comply with all local, state, and federal laws, and be operated on roadways at all times.

C.1.17.4 Custodial Contractors shall display a sign reading “CLOSED FOR CLEANING” at the entrance of all facilities during cleaning operations. The Contractor shall also display “CAUTION” signs when cleaning floors in an area in which people other than contractor personnel are or will be present, until the floor is dry. Contractor shall not allow water or other liquids to contact hand dryers, electrical fixtures, or other electrical equipment and lines during cleaning. Contractor shall be liable for all damage resulting from failure to comply with this requirement.

C.1.18 PAYMENT. Payment will not be made for services not performed. Contractors shall provide the Project Office with an invoice at the end of each month, requesting payment for that month’s services (the Government will furnish blank invoices for Contractor use). Payment shall be made via Electronic Funds Transfer (EFT) into the Contractor’s banking account on file as registered with CCR. In accordance with the Prompt Payment Act, payment will be made approximately 30 days after the last day of services received for the billing period, or 30 days from receipt of the invoice, whichever is later. For example, services performed during April shall be billed at the end of April, and payment will be made at the end of May. Likewise services performed during May shall be billed at the end of May, and will be paid at the end of June. NOTE: Contractors may choose of their own will to offer a "discount" (for example, "½% discount if paid by 10 days") which the paying office may or may not choose to honor.

Historically the paying office has honored most discounts, meaning a Contractor might be paid in 10 days instead of 30, at the discounted rate offered on the Contractor’s invoice. However, this is not guaranteed, and payment may be made in 30 days as usual.

C.1.19 ENVIRONMENTAL CONTROLS.

C.1.19.1 PARK CUSTODIAN LIST OF CLEANING PRODUCTS. Contractors will use standard commercial cleaning products generally available in the local marketplace and shall use those products only in accordance with their labeled instructions and uses.

C.1.19.2 COMPLIANCE WITH LAWS AND REGULATIONS: Contractors shall be knowledgeable of, and shall comply with, all applicable Federal, State, and Local laws, environmental requirements, and instructions. Contractors shall ensure policies and procedures are established that protect the health and safety of employees and the community to minimize or eliminate the risk of environmental pollution.

C.1.19.3 HAZARDOUS MATERIALS: Contractors are responsible for advising his/her employees of all Environmental and Hazardous Materials Handling, and is also required to provide to the COR the Material Safety Data Sheets (MSDS) for all materials used by the Contractor in accordance with Federal and State laws and/or regulations.

C.1.19.4 NOTIFICATION OF ENVIRONMENTAL SPILLS: If the Contractor or employee(s) of the

Contractor spills or releases any substance into the environment, the Contractor shall immediately report the incident to the Environmental Compliance Coordinator (Mr. Ken Wenger, Park Manager) in accordance with local procedures, and shall also notify the Contracting Officer’s Representative (COR), or in his or her absence the Contracting Officer.

The Contractor shall be liable for containment and environmental cleanup of the spill or release of such substance.

C.2 DEFINITIONS AND ACRONYMS: The following definitions and descriptions apply wherever the word, phrase, or acronym is used in this performance work statement.

Acceptable Level of Performance (ALP): Maximum percent defective that can be considered satisfactory;

allowable leeway or variance from a standard before the Government will reject the service.

Clean: As used generally, means free of all foreign matter, film, spots, streaks, dirt or impurities. As used for acceptance of work means gleaming; free from dirt, contamination, or impurities; unsoiled, unstained, neat and tidy.

Contracting Officer’s Representative (COR): Individual designated and authorized in writing by the Contracting Officer to perform specific technical and/or administrative functions regarding the contract.

Contractor: Company structure, including partners, officers, and employees with interest in the contract.

Debris: Articles or parts thereof such as paper / gum / paper clips / candy / lint / litter / strings / cigarette butts / leaves / sand / excrement, etc.

Defect: A service output that does not meet the standard of performance specified in the contract.

Dirt: Particles of sand, soil, grit, or pebbles; mud, dust, fuzz, tar, liquid stains, vomit, ashes, etc.

Disinfect: To cleanse in order to destroy any harmful microorganisms, fungus, algae, and mold, by application of an approved chemical agent.

Foreign Matter: Any articles, or parts thereof, not belonging to the place found.

Fully-Clothed: Wearing a sleeved shirt (T-shirts are acceptable), trousers, and shoes. Clothing shall be clean and neat in appearance and shall not be ripped, torn, or excessively faded. Clothing shall also contain logos or badges that clearly identify the wearer as a Contractor employee. These requirements shall not be construed to replace or eliminate the necessity for the wearing of appropriate protective clothing or devices as may be required in performance of duties.

Glass: Exposed glass surfaces (Lucite, plastic, transparent materials, mirrors) that are not windows.

Neat/Clean: Orderly, tidy, free from dirt and debris.

Performance-Based Contract: (FAR 2.101) Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise.

Performance Requirement: A service output required by the contract.

Performance Requirements Summary (PRS): A listing of service outputs under the contract to be evaluated by the COR or Inspector on a regular basis; the surveillance methods to be used; and the ALP.

Performance Work Statement (PWS): Similar to a scope of work, this document sets forth required duties of the Contractor. It is called a “Performance” Work Statement as satisfaction with services is measured by end results, rather than methods of performance (i.e., a PWS might state “the floors should be clean after performance of services” rather than stating “the floors should be swept and mopped.”)

Quality Assurance (QA): A method used by the Government to monitor/provide some measure of control over the quality of purchased goods and services received.

Quality Assurance Surveillance Plan (QASP): An organized written document used by Government for quality assurance surveillance. Document contains sampling/evaluation guides, checklists, and the performance requirements summary (PRS).

Quality Control (QC): A method used by the Contractor to control the quality of goods and services provided.

Sanitary: Clean and free of bacteria that may endanger health; hygienic.

Service Contract: A contract that directly engages the time and effort of a Contractor whose primary purpose is to perform an identifiable task or tasks. May cover services performed by either professional or nonprofessional personnel, whether on an individual or organizational basis.

Shall: Means the imperative.

Trash: Any abandoned articles, or parts thereof, such as paper, gum, used cups, empty cans and bottles, food scraps, litter, strings, cigarette butts, leaves, or similar waste items, as well as dirt, debris, and foreign matter collected during cleaning, and unwanted residues and ashes.

Windows: The glass surfaces which are an integral part of the outer wall of a building.

C.3 GOVERNMENT-FURNISHED MATERIALS/SUPPLIES Government-Furnished materials and supplies are provided to the Contractor only for use in performing work specified in this Contract.

C.3.1 The Government will furnish to the Contractor the following identified property to be used in performing the contract. When the property is delivered, the Contractor shall verify its quantity and condition in writing to the Contracting Officer or his authorized representative on Memorandum Receipt, ENG Form 4866, (See Section C.6) ( within 24 hours of receipt) (immediately). Damages or loss while in the Contractor's possession shall be reported in writing, to the Contracting Officer or his authorized representative within 24 hours.

Item (Description)

(1) Keys

C.3.2 Government – Furnished Consumable Items - The following consumable items, will be furnished to the Contractor by the Government. The Government will retain control of expendables, to be dispensed on an as-needed basis for use in performance of the Contract.

(1) Water for cleaning

(2) Baseball caps and name tag identification

(3) Contractor daily worksheet forms

C.4 CONTRACTOR FURNISHED EQUIPMENT AND SUPPLIES:

C.4.1 Except for those items or services specifically stated in Section C-3 as Government-furnished, Contractors shall furnish everything needed to perform the contract according to all its terms. Contractor equipment shall be of quality, size, and type suitable to satisfactorily accomplish services. Contractor equipment shall be in good repair and shall operate efficiently and safely, and shall be maintained clean to present a neat, professional appearance. The Contracting Officer or his designated representative may inspect Contractor equipment and/or tools at any time, and may direct the removal of any improper or unsafe equipment/tools. Such items shall be removed from service by the Contractor, and shall be replaced with satisfactory equipment. The following mentioned requirements are not all-inclusive of the Contractor-furnished items and services required in the performance of this contract. NOTE: Equipment breakdown shall not relieve the Contractor of the responsibility to perform services as specified. The Contractor shall assure that he/she possesses (or can obtain on short notice) sufficient backup equipment to continue performance of services as specified without interruption in the event of mechanical failure of primary equipment

C.4.2 SUPPLIES/EQUIPMENT. The following list of items Contractors shall provide for this contract may not be all-inclusive:

Custodians:

Toilet Paper Trash bags Working vehicle, including all fuel and maintenance thereof All tools, supplies, & equipment necessary and proper to execute this contract in a professional manner.

Examples (not all-inclusive):

Water hoses Water Sprinkler Brooms Dust Pan Mops Buckets Brushes Rake Squeegee Sponges Rags Plunger Shovels Bleach Insect spray Cleaners Disinfectants High-pressure sprayer (capable of producing a minimum of 100 PSI)

Self-contained water system or tank (100-gallon) for sprayer (to allow cleaning of remote toilets) Sufficient length of high-pressure hose for sprayer(75 ft recommended) Equipment as needed to safely empty/transport/dispose of hot ashes and coals

C.4.3 VEHICLE(S). Transportation vehicle(s) for use in performing the requirements of this contract must be street legal, properly licensed, and the Contractor shall furnish proof of required insurance in the form of a copy of the insurance policy, or a binder issued by the insurer. Proof of proper insurance for each vehicle shall be delivered to the Contracting Officer or his designated representative at the Pre-Work meeting. The Contractor (each person) shall maintain a valid state driver’s license. A photocopy of licenses will be taken at the Pre-Work meeting. No all-terrain vehicles (ATVs) will be allowed.

C.4.4 TELEPHONE. The Contractor shall provide a telephone number to the Contracting Officer or his representative at the Pre-Work meeting where Contractor or Contractor's designated representative can be reached at any time while contract performance is underway. If Contractor is unable to receive a call during contract performance, Contractor shall return the call within 30 minutes after telephone service is available.

C.5 SPECIFIC TASKS

C.5.1 GENERAL INFORMATION

Cleanup of facilities is directly related to public health and sanitation; therefore, it is essential that all facilities be serviced as specified. In the event that an area or facilities within an area are missed, or are not properly cleaned, the Contractor shall reclean the area or affected facilities immediately upon receipt of such notice from the Contracting Officer or his Authorized Representative. Failure to correct noted deficiencies may result in withholding payment for the work not performed. Equipment breakdown shall not relieve the Contractor of the responsibility of performing the work as specified. The Contractor shall assure that he has, or can obtain on short notice, sufficient backup equipment to continue the services as specified without interruption in the event of mechanical failure of his primary equipment. Park Custodian duties include but are not limited to cleaning vault toilets, showers, fire rings, campsites, tables, as further specified herein.

C.5.2 SCHEDULED SERVICES

C.5.2.1 All scheduled services, shall begin on 15 April 2022 through 30 September 2022 and 15 April 2023 through 30 September 2023 and 15 April 2024 through 30 September 2024 if renewal option is exercised.

C.5.2.2 Schedule. Timber Creek and School Creek Custodian scheduled for MONDAYS AND FRIDAYS.

REGULAR FACILITIES CLEANUP SCHEDULE S M T W T F S

Vault Toilets, Refuse Collection, Sidewalks, ------------- 0 S 0 0 0 S 0 Litter Pickup------------------------------------------------- 0 S 0 0 0 S 0 Grills and Fire Rings --------------------------------------- 0 - 0 0 0 S 0 Picnic Tables ------------------------------------------------ 0 S 0 0 0 S 0

(0) – Normal day off except for Holiday Periods as noted above

(S) – Facilities to be serviced

C.5.2.3 All work shall be accomplished within the time frames specified above. Services rendered outside the time periods specified will not be compensated unless specifically approved in writing by the Contracting Office or his approved representative.

C.5.3 SCHEDULE OF DUTIES.

C.5.3.1 Daily (a)Perform cleanup each day services are required to include the vault toilets, refuse containers and litter pickup.

C.5.3.2 Weekly Provide services once weekly on Friday to clean the following areas: fire rings, picnic tables and courtesy dock.

C.5.3.3 All work shall be accomplished within the timeframes specified above. Services rendered outside the time periods specified shall not be compensated unless specifically approved in writing by the Contracting Officer or his authorized representative.

C.5.4 SERVICE FACILITIES/AREAS

SCHOOL TIMBER

CREEK CREEK

VAULT TOILETS(Sets) 5 2

CHARCOAL GRILLS 44 45

& FIRERINGS

COURTESY DOCK 1

LITTER PICKUP(acres) 13 11

SIDEWALKS(sq. ft.) 1212 468

* Total number of fire rings shall be subject to a variation of +/- 5 at no change in contract price.

*NOTE: All acreages and square footages are estimated. The Contractor shall be responsible for determining exact acreages and conditions affecting performance of this work.

C.5.4.1 CAMPSITES Picnic Tables – all picnic tables shall be cleaned to ensure that tops and seats are free of all foreign matter and trash. If soap solution or disinfectant is used, tables should be rinsed with clean water and wiped dry. After performance of services, tables will be clean and free of excess water.

C.5.4.2 COURTESY DOCK. The Contractor shall clean the deck of the courtesy dock (located at boat ramp) to remove all foreign matter and trash. If soap or disinfectant is used, dock must be free of soap residue and excess water after performance of custodial services.

C.5.4.3 VAULT TOILET BUILDINGS. The Contractor shall clean and disinfect (using a commercial disinfectant such as Pine-Sol or bleach, and rinse with clean water) vault toilet buildings, including risers, inside and outside of seats, lids, walls, floors, ceilings and building exteriors. leaving facilities in a clean, sanitary condition, free of dirt, foreign material, residue, mold, mildew, trash, and excess water.

Toilet Paper – shall be replenished as needed to ensure ample supply until next cleaning.

Trash – cans (lined with trash bags provided by Contractor) shall be emptied, and bagged, tied full trash bags shall be deposited into the nearest dumpster. The Contractor shall leave trash cans in a clean, sanitary, odorless condition, lined with a clean trash bag, and disinfected if necessary. All loose trash within or immediately adjacent to any facility being serviced shall be removed. At no time shall trash be swept or washed out of a facility and left.

Sidewalks – shall be cleaned to remove all foreign matter and excess water.

C.5.4.4 LITTER PICKUP. All trash, litter, and debris including but not limited to cigarette butts, bottle caps, paper, etc. shall be picked up within one hundred (100) feet around each facility, including but not limited to the following:

parking lot parking area boat ramp courtesy dock vault toilets campsites on and alongside Corps roadways (extending 20 feet outward from each shoulder)

All trash, litter, debris, etc. collected shall be deposited in the dumpster provided by the

Corps. At no time shall the Contractor sweep, wash, or otherwise remove debris to leave it without disposing of it into the dumpster.

C.5.4.5 CAMP FIRE RINGS. As each campsite is vacated, all grills and fire rings, including cooking surfaces, shall be cleaned to remove debris, trash, ashes, and other foreign matter. Ashes (hot or cold) and coals (live or cold) shall be removed, transported, and disposed of in a SAFE MANNER AS APPROVED BY THE GOVERNMENT.

C.6 Contractor Daily Worksheet – Available at the Milford Project Office.

W912DQ22R1004

Section A - Solicitation/Contract Form

SYNOPSIS / SOLICITATION

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart

12.603 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation, proposals are being requested and a written solicitation will not be issued.

The solicitation number for this acquisition is W912DQ22R1004 and it is being issued as a Request for Proposals (RFP). This solicitation is intended to result in the award of four (4) contracts.

Offers are due ON THE DATED AND TIME SPECIFIED IN BOX 8. Offers shall be submitted in PDF via e-mail to seth.b.balsters@usace.army.mil. All offers must be good for at least 90 days from offer due date.

If you have any questions please contact Mr. Seth Balsters, seth.b.balsters@usace.army.mil , 816-389-3566.

The solicitation documents and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2005-84.

This synopsis/solicitation will be awarded as a 100% Small Business Set-aside and the associated North American Industry Classification system (NAICS) code is 561720 for “Janitorial Services”

Manufacturing and the business size standard is: $19,500,000.00.

Standard Industrial Classification (SIC) Code: 7349: Building Cleaning and Maintenance

Product/Service Code: S201 for “Housekeeping- Custodial Janitorial”

Description of Services Required: The U.S. Army Corps of Engineers Kansas City District has a need for Park Attendant, Park Attendant/Custodian, Custodian, and Janitor services to support several lakes in the Operations Division of the Kansas City District during the visiting season each year. The contractors shall perform all services in accordance with the Performance Work Statements. The Contractor shall comply with all Federal, state, and local laws, ordinances, statutes and regulations pertaining to the provided services.

Place of Contract Performance: Multiple Parks Located in Western Kansas.

Far 52.212-1, Instructions to Offerors - Commercial does apply to this acquisition with no addenda to the provision and is located in Section L of this combined synopsis/solicitation.

Far 52.212-2, Evaluation - Commercial Edited does apply to this acquisition with no addenda to the provision and is located in Section M of this combined synopsis/solicitation.

FAR 52.212-3, Offeror Representations and Certifications - Commercial Items, does apply to this acquisition with no addenda to the provision, and is located in Section K of this combined synopsis/solicitation.

FAR 52.212-4, Contract Terms and Conditions - Commercial Items, does apply to this acquisition with no addenda to the provision.