C05__ATTACHMENT_4_RSHS_APPENDIX_B_CONTRACTOR_SAFETY_PROGRAM.pdf
PDF 9 KB Posted
- Attached to
- NCAO Fire Alarm Maintenance Services Federal contract opportunity
- Solicitation number
- 140R2022Q0003
About this file
This document outlines a contractor safety program for a federal contract opportunity involving fire alarm maintenance services at ten Bureau of Reclamation locations. The safety program must address all contractual requirements and outline policies, responsibilities, compliance with regulations, inspection procedures, accident investigation and reporting, applicable emergency plans, confined space and lockout/tagout procedures, medical facilities and training, communications, occupational health hazards and protective equipment, machinery inspection and maintenance, excavation and demolition procedures, working surfaces, public protection measures, and electrical facilities. The related federal contract opportunity is solicitation number 140R2022Q0003 for fire alarm maintenance services involving inspection, testing, repair, and documentation activities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R2022Q0003_Amd_0001.pdf | ||
| C05__ATTACHMENT_3_INSPECTION-TESTING_LIST.PDF | ||
| C05__ATTACHMENT_2_MAJOR_FIRE_ALARM_SYSTEM_COMPONENTS.PDF | ||
| C05__ATTACHMENT_5_WAGE_DETERMINATION_2015-5627_REV_13_10-20-2021.pdf | ||
| Sol_140R2022Q0003.pdf | ||
| C05__ATTACHMENT_1_FIRE_ALARM_REPORTING_DIAGRAM.PDF |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
October 2009 B-1
Appendix B
Contractor Safety Program Unless waived by the Contracting Officer's Representative (COR), prime and supplementary safety program submittals must, as a minimum, address all appropriate contractual requirements shown under the program outline. Program items will be so detailed that reviewers can ascertain adequacy. The original program submittal can cover all work phases, or only address the initial work phase with timely supplementary submittals as major work phases occur.
Contractors desiring to follow this latter course of action will, in the initial submission, clearly define the original work covered and the work phases to be covered by supplements.
In no case will any phase of work commence until a program for that portion of the work has been accepted by the COR. Original and supplemental submissions covering hazardous operations and/or activities will include a standing operating procedure (SOP) and hazard analysis. The SOP will break down the operation or activity into specific basic steps. The hazard analysis will define the hazards associated with each basic step and proposed method(s) for eliminating or minimizing the hazard. Such methods will outline, as a minimum, employee training requirements, personal protective equipment requirements, procedural changes, methods for evaluating program effectiveness, etc.
All activities involving use of hazardous and/or toxic materials, work in confined spaces, work at heights over 6 feet, or underwater require an SOP and hazard analysis. Material Safety Data Sheets will be attached to all SOPs governing work that involves use of hazardous or toxic materials.
Program Outline
I. General Requirements A. Statement of Policy B. Statement of Safety and Health Responsibilities C. Statement of Compliance with Regulations, Standards, and Codes D. Statement of Subcontractor Compliance
E. Safety Inspection Procedures F. Accident Investigation and Reporting Procedures G. Applicable Emergency Plans H. Confined Space Procedures I. Lockout/Tagout Procedures J. Fire Protection Plans
1. Type and location of suppression equipment or systems
2. Offsite assistance agreement
3. Temporary heating devices
Reclamation Safety and Health Standards
B-2 October 2009
II. Medical A. Facilities
B. Training C. Certifications D. Physician E. Ambulance (Name, location, and telephone number) F. Physical Qualification of Employees G. Records III. Communications
A. Employee Training B. Safety Meetings C. Onsite Training D. Supervisor Training
IV. Occupational Health
A. Procedures and Equipment to Minimize Hazards B. Testing program for employees and work environments
C. Qualified personnel D. Personal protective equipment E. Ventilation plans
V. Machinery and Mechanical Equipment
A. Procedures and Equipment to Minimize Hazards
1. Testing program for employees and work environments
2. Mobile and stationary equipment B. Inspection Procedures
C. Maintenance Procedures D. Operating Personnel E. Protective Safety Devices and Certifications
F. Elevators and Aerial Lifts
VI. Excavation and Demolition
A. Tunnels and Shafts
1. Internal combustion engines
2. Ventilation plans
3. Transportation systems and equipment
4. Work environment testing
5. Ground support
B. Blasting
1. Blaster certification
2. Written procedures
3. Storage
4. Transportation
Appendix B—Contractor Safety Program
October 2009 B-3
C. Excavations Other Than Tunnels and Shafts
1. Slide protections
2. Support systems
3. Inspections
4. Access
D. High Scaling
1. Definition
2. Personal protective equipment
3. Standing operating procedure
E. Haulage
1. Haul roads
2. Equipment and Procedures
VII. Working Surfaces
A. Access
1. Ladders
2. Platforms, stairways, and ramps B. Personal Protective Equipment
C. Scaffolding D. Safety Nets
VIII. Protection of the Public
A. Signs and Barricades B. Flagging Procedures
C. Jurisdictional Approvals
IX. Marine and Diving Operations Detailed Plan and Written Procedures
X. Electrical Facilities
Substations
This outline provides guidance in preparing a safety program and does not cover all material that may be necessary. The contractor must review specifications and all safety and health regulations to ensure a comprehensive plan.
XI. Required Safety Program Coordination
1. Confined Space Program
2. Electrical and Lockout/Tagout Program
File details come from the government source that posted it. Updated .