C05_01_Pricing_Schedule_HH_Elevator_Revised.docx
DOCX document 28 KB Posted
- Attached to
- HH ELEVATOR MAINTENANCE AND REPAIRS Federal contract opportunity
- Solicitation number
- 140R1725Q0033
About this file
This document is a Pricing Schedule for an elevator maintenance and repair contract for the Department of the Interior Bureau of Reclamation. The contract covers maintenance and repair services for 3 elevators over a 5-year period from September 1, 2025, to August 31, 2030, consisting of a base year and four option years. The pricing structure includes firm fixed price line items for monthly inspections and preventative maintenance (CLINs 10, 20, 50, 60, 90, 100, 130, 140, 170, 180), and time and materials line items for labor and materials repairs. The labor repair line items have increasing ceiling prices each year, starting at $52,000 in the base year and rising to $55,826 in later option years, while the materials repair line item remains constant at $15,000 annually. The contract allows for potential extension of services based on FAR 52.217-8, with prorated pricing calculated at the time of option exercise.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R1725Q0033_Amd_0004.pdf | ||
| Sol_140R1725Q0033_Amd_0003.pdf | ||
| Q_and_A_For_Amendment_3_0003.docx | DOCX document | |
| Sol_140R1725Q0033_Amd_0002.pdf | ||
| Block_14___19_Elevator_Photos_0001.pdf | ||
| Sol_140R1725Q0033_Amd_0001.pdf | ||
| Control_Bay_Elevato_Photos_0001.pdf | ||
| C06_01_Revised_PWS_8_14_25_0001.pdf | ||
| Q_and_A_For_Amendment_1_0001.docx | DOCX document | |
| Sol_140R1725Q0033.pdf | ||
| C05_01_FIST_1-1.pdf | ||
| C05_01_FIST_2-10.pdf | ||
| C05_01_FIST_5-14.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule 1 – Base Year Estimated Period of Performance September 1, 2025 through August 31, 2026
| CLIN |
| Description |
| Quantity |
| Unit of Issue |
| Unit Cost |
| Total Cost |
| 10 |
| Conduct Category 1 Inspections For 3 Elevators Per PWS |
Preventative Maintenance shall be conducted in concurrence with the CAT 1 Inspections and billed separately against CLIN 20 (Firm Fixed Price Line Item)
| 1 |
| MONTH |
| $ |
| $ |
| 20 |
| Conduct Monthly, Quarterly, Semiannual Preventative Maintenance for 3 Elevators Per PWS. |
(Firm Fixed Price Line Item)
| 12 |
| MONTH |
| $ |
| $ |
| 30 |
| Labor for Repair of 3 Elevators as needed, Per PWS. |
Standard Shop Rate Rates shall include direct labor hours at fixed hourly rates, including wages, overhead general and administrative expenses and profit.
(Time & Materials Line Item) The ceiling price for this line item is $52,000.00 The contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| PER HOUR |
| $ |
| $ |
| 40 |
| Materials for Repair of 3 Elevators as needed, Per PWS. |
(Time & Materials Line Item) The ceiling price for this line item is $15,000.00 the contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| N/A |
| N/A |
| $15,000.00 |
TOTAL SCHEDULE 1
Schedule 2 – Option Year 1
September 1, 2026, through August 31, 2027
| CLIN |
| Description |
| Quantity |
| Unit of Issue |
| Unit Cost |
| Total Cost |
| 50 |
| Conduct Category 1 Inspections for 3 Elevators. Per PWS. |
Preventative Maintenance shall be conducted in concurrence with the CAT 1 Inspections and billed separately against CLIN 60 (Firm Fixed Price Line Item)
| 1 |
| MONTH |
| $ |
| $ |
| 60 |
| Conduct Monthly, Quarterly, Semiannual Preventative Maintenance for 3 Elevators Per PWS. |
(Firm Fixed Price Line Item)
| 12 |
| MONTH |
| $ |
| $ |
| 70 |
| Labor for Repair of 3 Elevators as needed, Per PWS. |
Standard Shop Rate Rates shall include direct labor hours at fixed hourly rates, including wages, overhead general and administrative expenses and profit.
(Time & Materials Line Item) The ceiling price for this line item is $53,526.00. The contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| PER HOUR |
| $ |
| $ |
| 80 |
| Materials for Repair for 3 Elevators as needed, Per PWS. |
(Time & Materials Line Item) The ceiling price for this line item is $15,000.00 the contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| N/A |
| N/A |
| $15,000.00 |
TOTAL SCHEDULE 2
Schedule 3 – Option Year 2
September 1, 2027, through August 31, 2028
| CLIN |
| Description |
| Quantity |
| Unit of Issue |
| Unit Cost |
| Total Cost |
| 90 |
| Conduct Category 1 Inspections for 3 Elevators. Per PWS. |
Preventative Maintenance shall be conducted in concurrence with the CAT 5 Inspections and billed separately against CLIN 100 (Firm Fixed Price Line Item)
| 1 |
| MONTH |
| $ |
| $ |
| 100 |
| Monthly, Quarterly, Semiannual Requirements For 3 Elevators, Per PWS |
(Firm Fixed Price Line Item)
| 12 |
| MONTH |
| $ |
| $ |
| 110 |
| Labor for Repair of 3 Elevators as needed, Per PWS. |
Standard Shop Rate Rates shall include direct labor hours at fixed hourly rates, including wages, overhead general and administrative expenses and profit.
(Time & Materials Line Item) The ceiling price for this line item is $54,526.00 The contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| PER HOUR |
| $ |
| $ |
| 120 |
| Materials for Repair of 3 Elevators as needed, Per PWS. |
(Time & Materials Line Item) The ceiling price for this line item is $15,000.00 the contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| N/A |
| N/A |
| $15,000.00 |
TOTAL SCHEDULE 3
Schedule 4 – Option Year 3
September 1, 2028, through August 31, 2029
| CLIN |
| Description |
| Quantity |
| Unit of Issue |
| Unit Cost |
| Total Cost |
| 130 |
| Conduct Category 1 Inspections for 3 Elevators. Per PWS. |
Preventative Maintenance shall be conducted in concurrence with the CAT 1 Inspections and billed separately against CLIN 140 (Firm Fixed Price Line Item)
| 1 |
| MONTH |
| $ |
| $ |
| 140 |
| Monthly, Quarterly, Semiannual Requirements For 3 Elevators, Per PWS |
(Firm Fixed Price Line Item)
| 12 |
| MONTH |
| $ |
| $ |
| 150 |
| Labor for Repair of 3 Elevators as needed, Per PWS. |
Standard Shop Rate Rates shall include direct labor hours at fixed hourly rates, including wages, overhead general and administrative expenses and profit.
(Time & Materials Line Item) The ceiling price for this line item is $55,826.00. The contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| PER HOUR |
| $ |
| $ |
| 160 |
| Materials for Repair of 3 Elevators as needed, Per PWS. |
(Time & Materials Line Item) The ceiling price for this line item is $15,000.00 the contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| N/A |
| N/A |
| $15,000.00 |
TOTAL SCHEDULE 4
Schedule 5 – Option Year 4
September 1, 2029, through August 31, 2030
| CLIN |
| Description |
| Quantity |
| Unit of Issue |
| Unit Cost |
| Total Cost |
| 170 |
| Conduct Category 1 Inspections for 3 Elevators. Per PWS. |
Preventative Maintenance shall be conducted in concurrence with the CAT 1 Inspections and billed separately against CLIN 140 (Firm Fixed Price Line Item)
| 1 |
| MONTH |
| $ |
| $ |
| 180 |
| Monthly, Quarterly, Semiannual Requirements For 3 Elevators, Per PWS |
(Firm Fixed Price Line Item)
| 12 |
| MONTH |
| $ |
| $ |
| 190 |
| Labor for Repair of 3 Elevators as needed, Per PWS. |
Standard Shop Rate Rates shall include direct labor hours at fixed hourly rates, including wages, overhead general and administrative expenses and profit.
(Time & Materials Line Item) The ceiling price for this line item is $55,826.00. The contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| PER HOUR |
| $ |
| $ |
| 200 |
| Materials for Repair, of 3 Elevators as needed, Per PWS. |
(Time & Materials Line Item) The ceiling price for this line item is $15,000.00 the contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| N/A |
| N/A |
| $15,000.00 |
TOTAL SCHEDULE 5
Total for all Schedules
Total Base Year From: September 1, 2025, to August 31, 2026
Total Option Year 1 From: September 1, 2026, to August 31, 2027
Total Option Year 2 From: September 1, 2027, to August 31, 2028
Total Option Year 3 From: September 1, 2028, to August 31, 2029
Total Option Year 4 From: September 1, 2029, to August 31, 2030
If FAR 52.217-8 is exercised, the prices for the Option to Extend Service’s term will be calculated based on the prorated term and prices that are in effect at the time the option is exercised.
File details come from the government source that posted it. Updated .