This is a Request for Proposal (RFP) from the Bureau of Reclamation for elevator maintenance and inspection services at the Hungry Horse Dam in Montana. The contract covers three elevators located in different areas of the dam facility, including the Control Bay, Block 14, and Block 19 elevators. The solicitation is structured as a base year contract with four option years, running from September 1, 2025 through August 31, 2030, with a total potential duration of five years.

The contract includes firm fixed price line items for annual inspections (Category 1 and Category 5), monthly preventative maintenance, and time and materials line items for labor and repair materials. The work requires certified elevator technicians to perform comprehensive maintenance, including brake and motor inspections, safety system checks, and equipment testing. The solicitation is unrestricted and has a small business size standard of $12.5 million. Wage rates for elevator repairers are set at $67.61 per hour, with additional benefits including health and welfare, vacation pay, pension, and other supplemental payments. Contractors must comply with specific safety standards, including Reclamation Safety and Health Standards and OSHA regulations.

View the file

Other files for this federal contract opportunity

Other files attached to HH ELEVATOR MAINTENANCE AND REPAIRS, newest first.
File Type Posted
Sol_140R1725Q0033_Amd_0004.pdf PDF
Sol_140R1725Q0033_Amd_0003.pdf PDF
Q_and_A_For_Amendment_3_0003.docx DOCX document
Sol_140R1725Q0033_Amd_0002.pdf PDF
Q_and_A_For_Amendment_1_0001.docx DOCX document
Sol_140R1725Q0033_Amd_0001.pdf PDF
Control_Bay_Elevato_Photos_0001.pdf PDF
Block_14___19_Elevator_Photos_0001.pdf PDF
C06_01_Revised_PWS_8_14_25_0001.pdf PDF
C05_01_FIST_5-14.pdf PDF
C05_01_Pricing_Schedule_HH_Elevator_Revised.docx DOCX document
C05_01_FIST_1-1.pdf PDF
C05_01_FIST_2-10.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

R17

See Schedule

0011285572 CODE 16. ADMINISTERED BYCODE

X

X

811310

SIZE STANDARD:

% FOR:SET ASIDE:UNRESTRICTED ORR17

REQUEST FOR

PROPOSAL

(RFP)

INVITATION

FOR BID (IFB)

10. THIS ACQUISITION ISCODE

REQUEST FOR

QUOTE (RFQ)

14. METHOD OF SOLICITATION

13b. RATING

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SMALL BUSINESS

08/25/2025 1700 ED

08/11/2025

Jeri Wahl (No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

140R1725Q0033

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 68 OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

Hungry Horse MT 59919-0131 2501 Colorado Blvd Hungry Horse Field Office Bureau of Reclamation-PN-GCPO

15. DELIVER TO

Grand Coulee WA 99133 Hwy 155, PO Box 620 Grand Coulee Acquisition Group Pacific Northwest Region

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$12.5

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

11.

SEE SCHEDULE

12. DISCOUNT TERMS THIS CONTRACT IS A RATED

ORDER UNDER THE DEFENSE

PRIORITIES AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

8(A)

Bureau of Reclamation

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

ADMINISTERED BY:

Bureau of Reclamation Pacific Northwest Region Grand Coulee Acquisition Group Hwy 155, PO Box 620 Grand Coulee WA 99133 US All pricing shall be provided on the attached pricing schedules.

Wage Determination number 1985-1233, revision 51, is incorporated into this solicitation.

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED

Jeri L. Wahl

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Government Use Only)

OFFER

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT: REFERENCE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 11/2021) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Please refer to provision 52.212-1 for a list of items required to be submitted with your quote.

Failure to submit these items could result in rejection of quote.

Delivery: 08/31/2026

00010 Base Year

Category 1 Annual Inspections for 3 Elevators, Per attached PWS.

Note: Preventative Maintenance shall be conducted in concurrence with the Category 1 Inspections and billed separately against CLIN 20

Pricing Shall be Provided on Attached Pricing

Schedules.

This is a Firm Fixed Price Line Item

Product/Service Code: J036

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- SPECIAL INDUSTRY MACHINERY

Period of Performance: 09/01/2025 to 08/31/2026

Continued ...

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

68 2 of

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 68

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1725Q0033

00020 Base Year

Monthly Preventative Maintenance for 3 Elevators, Per Attached PWS

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Firm Fixed Price Line Item

Product/Service Code: J036

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- SPECIAL INDUSTRY MACHINERY

Period of Performance: 09/01/2025 to 08/31/2026

00030 Base Year

Labor for 3 Elevators per attached PWS

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Time and Materials line item

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Period of Performance: 09/01/2025 to 08/31/2026

00040 Base Year

Materials for Repairs of 3 Elevators, Per attached PWS

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Time and Materials Line Item

Product/Service Code: J036

Product/Service Description: MAINT/REPAIR/REBUILD

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

4 68

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1725Q0033

OF EQUIPMENT- SPECIAL INDUSTRY MACHINERY

Period of Performance: 09/01/2025 to 08/31/2026

00050 Option Year 1

Category 1 Annual Inspections for 3 Elevators, Per attached PWS.

Note: Preventative Maintenance shall be conducted in concurrence with the Category 1 Inspections and billed separately against CLIN 60

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Firm Fixed Price Line Item

(Option Line Item)

Anticipated Exercise Date 08/01/2026

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Period of Performance: 09/01/2026 to 08/31/2027

00060 Option Year 1

Monthly Preventative Maintenance for 3 Elevators, Per Attached PWS

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Firm Fixed Price Line Item

(Option Line Item)

Anticipated Exercise Date 08/01/2026

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Period of Performance: 09/01/2026 to 08/31/2027

00070 Option Year 1

Labor for 3 Elevators per attached PWS

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

5 68

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1725Q0033

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Time and Materials line item

(Option Line Item)

Anticipated Exercise Date 08/01/2026

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Period of Performance: 09/01/2026 to 08/31/2027

00080 Option Year 1

Materials for Repairs of 3 Elevators, Per attached PWS

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Time and Materials Line Item

(Option Line Item)

Anticipated Exercise Date 08/01/2026

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Period of Performance: 09/01/2026 to 08/31/2027

00090 Option Year 2

Category 5 Inspections for 3 Elevators, Per attached PWS.

Note: Preventative Maintenance shall be conducted in concurrence with the Category 5 Inspections and billed separately against CLIN 100

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Firm Fixed Price Line Item

(Option Line Item)

Anticipated Exercise Date 08/01/2027

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Period of Performance: 09/01/2027 to 08/31/2028

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

6 68

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1725Q0033

00100 Option Year 2

Monthly Preventative Maintenance for 3 Elevators, Per Attached PWS

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Firm Fixed Price Line Item

(Option Line Item)

Anticipated Exercise Date 08/01/2027

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Period of Performance: 09/01/2027 to 08/31/2028

00110 Option Year 2

Labor for 3 Elevators per attached PWS

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Time and Materials line item

(Option Line Item)

Anticipated Exercise Date 08/01/2027

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Period of Performance: 09/01/2027 to 08/31/2028

00120 Option Year 2

Materials for Repairs of 3 Elevators, Per attached PWS

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Time and Materials Line Item

(Option Line Item)

Anticipated Exercise Date 08/01/2027

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

7 68

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1725Q0033

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Period of Performance: 09/01/2027 to 08/31/2028

00130 Option Year 3

Category 1 Annual Inspections for 3 Elevators, Per attached PWS.

Note: Preventative Maintenance shall be conducted in concurrence with the Category 1 Inspections and billed separately against CLIN 140

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Firm Fixed Price Line Item

(Option Line Item)

Anticipated Exercise Date 08/01/2028

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Period of Performance: 09/01/2028 to 08/31/2029

00140 Option Year 3

Monthly Preventative Maintenance for 3 Elevators, Per Attached PWS

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Firm Fixed Price Line Item

(Option Line Item)

Anticipated Exercise Date 08/01/2028

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Period of Performance: 09/01/2028 to 08/31/2029

00150 Option Year 3

Labor for 3 Elevators per attached PWS

Pricing Shall be Provided on Attached Pricing

Schedules

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

8 68

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1725Q0033

This is a Time and Materials line item

(Option Line Item)

Anticipated Exercise Date 08/01/2028

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Period of Performance: 09/01/2028 to 08/31/2029

00160 Option Year 3

Materials for Repairs of 3 Elevators, Per attached PWS

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Time and Materials Line Item

(Option Line Item)

Anticipated Exercise Date 08/01/2028

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Period of Performance: 09/01/2028 to 08/31/2029

00170 Option Year 4

Category 1 Annual Inspections for 3 Elevators, Per attached PWS.

Note: Preventative Maintenance shall be conducted in concurrence with the Category 1 Inspections and billed separately against CLIN 180

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Firm Fixed Price Line Item

(Option Line Item)

Anticipated Exercise Date 08/01/2029

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Period of Performance: 09/01/2029 to 08/31/2030

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

9 68

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1725Q0033

00180 Option Year 4

Monthly Preventative Maintenance for 3 Elevators, Per Attached PWS

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Firm Fixed Price Line Item

(Option Line Item)

Anticipated Exercise Date 08/01/2029

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Period of Performance: 09/01/2029 to 08/31/2030

00190 Option Year 4

Labor for 3 Elevators per attached PWS

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Time and Materials line item

(Option Line Item)

Anticipated Exercise Date 08/01/2029

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Period of Performance: 09/01/2029 to 08/31/2030

00200 Option Year 4

Materials for Repairs of 3 Elevators, Per attached PWS

Pricing Shall be Provided on Attached Pricing

Schedules

This is a Time and Materials Line Item

(Option Line Item)

Anticipated Exercise Date 08/01/2029

Product/Service Code: J039

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

10 68

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1725Q0033

Period of Performance: 09/01/2029 to 08/31/2030

If FAR 52.217-8 is exercised, the prices for the

Option to Extend Service's term will be calculated based on the prorated term and prices that are in effect at the time the option is exercised.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Clauses Note: This solicitation contains both firm fixed price Contract Line Item Numbers (CLINS) as well as time and materials CLINS. The provisions and clauses in this document apply to all or some of the CLINS. The below letter designations will be used to identify the clause and/or provision that applies to each type of CLIN:

A: Applies to all CLINS T: Applies to Time and Materials CLINS F: Applies to Firm Fixed Price CLINS

A: 52.212-4 CONTRACT TERMS AND CONDITIONS –COMMERCIAL PRODUCTS AND COMMERCIAL

SERVICES (NOV 2023)

T: 52.212-4 CONTRACT TERMS AND CONDITIONS –COMMERCIAL PRODUCTS AND COMMERCIAL

SERVICES (NOV 2021) (Alternate 1)

(a) Inspection/Acceptance. (1) The Government has the right to inspect and test all materials furnished and services performed under this contract, to the extent practicable at all places and times, including the period of performance, and in any event before acceptance. The Government may also inspect the plant or plants of the Contractor or any subcontractor engaged in contract performance. The Government will perform inspections and tests in a manner that will not unduly delay the work.

(2) If the Government performs inspection or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish and shall require subcontractors to furnish all reasonable facilities and assistance for the safe and convenient performance of these duties.

(3) Unless otherwise specified in the contract, the Government will accept or reject services and materials at the place of delivery as promptly as practicable after delivery, and they will be presumed accepted 60 days after the date of delivery, unless accepted earlier.

(4) At any time during contract performance, but not later than 6 months (or such other time as may be specified in the contract) after acceptance of the services or materials last delivered under this contract, the Government may require the Contractor to replace or correct services or materials that at time of delivery failed to meet contract requirements. Except as otherwise specified in paragraph (a)(6) of this clause, the cost of replacement or correction shall be determined under paragraph (i) of this clause, but the "hourly rate" for labor hours incurred in the replacement or correction shall be reduced to exclude that portion of the rate attributable to profit. Unless otherwise specified below, the portion of the "hourly rate" attributable to profit shall be 10 percent. The Contractor shall not tender for acceptance materials and services required to be replaced or corrected without disclosing the former requirement for replacement or correction, and, when required, shall disclose the corrective action taken. [Insert portion of labor rate attributable to profit.]

(5)(i) If the Contractor fails to proceed with reasonable promptness to perform required replacement or correction, and if the replacement or correction can be performed within the ceiling price (or the ceiling price as increased by the Government), the Government may-

(A) By contract or otherwise, perform the replacement or correction, charge to the Contractor any increased cost, or deduct such increased cost from any amounts paid or due under this contract; or

(B) Terminate this contract for cause.

(ii) Failure to agree to the amount of increased cost to be charged to the Contractor shall be a dispute under the Disputes clause of the contract.

(6) Notwithstanding paragraphs (a)(4) and (5) above, the Government may at any time require the Contractor to remedy by correction or replacement, without cost to the Government, any failure by the Contractor to comply with the requirements of this contract, if the failure is due to-

(i) Fraud, lack of good faith, or willful misconduct on the part of the Contractor's managerial personnel; or

(ii) The conduct of one or more of the Contractor’s employees selected or retained by the Contractor after any of the Contractor’s managerial personnel has reasonable grounds to believe that the employee is habitually careless or unqualified.

(7) This clause applies in the same manner and to the same extent to corrected or replacement materials or services as to materials and services originally delivered under this contract.

(8) The Contractor has no obligation or liability under this contract to correct or replace materials and services that at time of delivery do not meet contract requirements, except as provided in this clause or as may be otherwise specified in the contract.

(9) Unless otherwise specified in the contract, the Contractor's obligation to correct or replace Government-furnished property shall be governed by the clause pertaining to Government property.

(e) Definitions. (1) The clause at FAR 52.202-1, Definitions, is incorporated herein by reference. As used in this clause-

(i) "Direct materials" means those materials that enter directly into the end product, or that are used or consumed directly in connection with the furnishing of the end product or service.

(ii) "Hourly rate" means the rate(s) prescribed in the contract for payment for labor that meets the labor category qualifications of a labor category specified in the contract that are-

(A) Performed by the contractor;

(B) Performed by the subcontractors; or

(C) Transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.

(iii) "Materials" means-

(A) Direct materials, including supplies transferred between divisions, subsidiaries, or affiliates of the contractor under a common control;

(B) Subcontracts for supplies and incidental services for which there is not a labor category specified in the contract;

(C) Other direct costs (e.g., incidental services for which there is not a labor category specified in the contract, travel, computer usage charges, etc.);

(D) The following subcontracts for services which are specifically excluded from the hourly rate: [Insert any subcontracts for services to be excluded from the hourly rates prescribed in the schedule.]; and

(E) Indirect costs specifically provided for in this clause.

https://www.acquisition.gov/far/52.202-1#FAR_52_202_1

(iv) "Subcontract" means any contract, as defined in FAR subpart 2.1, entered into with a subcontractor to furnish supplies or services for performance of the prime contract or a subcontract including transfers between divisions, subsidiaries, or affiliates of a contractor or subcontractor. It includes, but is not limited to, purchase orders, and changes and modifications to purchase orders.

(i) Payments. (1) Work performed. The Government will pay the Contractor as follows upon the submission of commercial invoices approved by the Contracting Officer:

(i) Hourly rate.

(A) The amounts shall be computed by multiplying the appropriate hourly rates prescribed in the contract by the number of direct labor hours performed. Fractional parts of an hour shall be payable on a prorated basis.

(B) The rates shall be paid for all labor performed on the contract that meets the labor qualifications specified in the contract. Labor hours incurred to perform tasks for which labor qualifications were specified in the contract will not be paid to the extent the work is performed by individuals that do not meet the qualifications specified in the contract, unless specifically authorized by the Contracting Officer.

(C) Invoices may be submitted once each month (or at more frequent intervals, if approved by the Contracting Officer) to the Contracting Officer or the authorized representative.

(D) When requested by the Contracting Officer or the authorized representative, the Contractor shall substantiate invoices (including any subcontractor hours reimbursed at the hourly rate in the schedule) by evidence of actual payment, individual daily job timecards, records that verify the employees meet the qualifications for the labor categories specified in the contract, or other substantiation specified in the contract.

(E) Unless the Schedule prescribes otherwise, the hourly rates in the Schedule shall not be varied by virtue of the Contractor having performed work on an overtime basis.

(1) If no overtime rates are provided in the Schedule and the Contracting Officer approves overtime work in advance, overtime rates shall be negotiated.

(2) Failure to agree upon these overtime rates shall be treated as a dispute under the Disputes clause of this

(3) If the Schedule provides rates for overtime, the premium portion of those rates will be reimbursable only to the extent the overtime is approved by the Contracting Officer.

(ii) Materials.

(A) If the Contractor furnishes materials that meet the definition of a commercial product at FAR 2.101, the price to be paid for such materials shall not exceed the Contractor’s established catalog or market price, adjusted to reflect the-

(1) Quantities being acquired; and

(2) Any modifications necessary because of contract requirements.

(B) Except as provided for in paragraph (i)(1)(ii)(A) and (D)(2) of this clause, the Government will reimburse the Contractor the actual cost of materials (less any rebates, refunds, or discounts received by the contractor that are identifiable to the contract) provided the Contractor-https://www.acquisition.gov/far/subpart-2.1#FAR_Subpart_2_1 https://www.acquisition.gov/far/2.101#FAR_2_101

(1) Has made payments for materials in accordance with the terms and conditions of the agreement or invoice;

or

(2) Makes these payments within 30 days of the submission of the Contractor’s payment request to the Government and such payment is in accordance with the terms and conditions of the agreement or invoice.

(C) To the extent able, the Contractor shall-

(1) Obtain materials at the most advantageous prices available with due regard to securing prompt delivery of satisfactory materials; and

(2) Give credit to the Government for cash and trade discounts, rebates, scrap, commissions, and other amounts that are identifiable to the contract.

(D) Other Costs. Unless listed below, other direct and indirect costs will not be reimbursed.

(1) Other Direct Costs. The Government will reimburse the Contractor on the basis of actual cost for the following, provided such costs comply with the requirements in paragraph (i)(1)(ii)(B) of this clause: Travel, Per Diem, Freight, Incidental expenses for which there is not a labor category specified in this contract.

(2) Indirect Costs (Material Handling, Subcontract Administration, etc.). The Government will reimburse the Contractor for indirect costs on a pro-rata basis over the period of contract performance at the following fixed price: $0.00.

(2) Total cost. It is estimated that the total cost to the Government for the performance of this contract shall not exceed the ceiling price set forth in the Schedule and the Contractor agrees to use its best efforts to perform the work specified in the Schedule and all obligations under this contract within such ceiling price. If at any time the Contractor has reason to believe that the hourly rate payments and material costs that will accrue in performing this contract in the next succeeding 30 days, if added to all other payments and costs previously accrued, will exceed 85 percent of the ceiling price in the Schedule, the Contractor shall notify the Contracting Officer giving a revised estimate of the total price to the Government for performing this contract with supporting reasons and documentation. If at any time during the performance of this contract, the Contractor has reason to believe that the total price to the Government for performing this contract will be substantially greater or less than the then stated ceiling price, the Contractor shall so notify the Contracting Officer, giving a revised estimate of the total price for performing this contract, with supporting reasons and documentation. If at any time during performance of this contract, the Government has reason to believe that the work to be required in performing this contract will be substantially greater or less than the stated ceiling price, the Contracting Officer will so advise the Contractor, giving the then revised estimate of the total amount of effort to be required under the contract.

(3) Ceiling price. The Government will not be obligated to pay the Contractor any amount in excess of the ceiling price in the Schedule, and the Contractor shall not be obligated to continue performance if to do so would exceed the ceiling price set forth in the Schedule, unless and until the Contracting Officer notifies the Contractor in writing that the ceiling price has been increased and specifies in the notice a revised ceiling that shall constitute the ceiling price for performance under this contract. When and to the extent that the ceiling price set forth in the Schedule has been increased, any hours expended and material costs incurred by the Contractor in excess of the ceiling price before the increase shall be allowable to the same extent as if the hours expended and material costs had been incurred after the increase in the ceiling price.

(4) Access to records. At any time before final payment under this contract, the Contracting Officer (or authorized representative) will have access to the following (access shall be limited to the listing below unless otherwise agreed to by the Contractor and the Contracting Officer):

(i) Records that verify that the employees whose time has been included in any invoice meet the qualifications for the labor categories specified in the contract;

(ii) For labor hours (including any subcontractor hours reimbursed at the hourly rate in the schedule), when timecards are required as substantiation for payment-

(A) The original timecards (paper-based or electronic);

(B) The Contractor’s timekeeping procedures;

(C) Contractor records that show the distribution of labor between jobs or contracts; and

(D) Employees whose time has been included in any invoice for the purpose of verifying that these employees have worked the hours shown on the invoices.

(iii) For material and subcontract costs that are reimbursed on the basis of actual cost-

(A) Any invoices or subcontract agreements substantiating material costs; and

(B) Any documents supporting payment of those invoices.

(5) Overpayments/Underpayments. Each payment previously made shall be subject to reduction to the extent of amounts, on preceding invoices, that are found by the Contracting Officer not to have been properly payable and shall also be subject to reduction for overpayments or to increase for underpayments. The Contractor shall promptly pay any such reduction within 30 days unless the parties agree otherwise. The Government within 30 days will pay any such increases, unless the parties agree otherwise. The Contractor’s payment will be made by check. If the Contractor becomes aware of a duplicate invoice payment or that the Government has otherwise overpaid on an invoice payment, the Contractor shall-

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6)(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury, as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, and then at the rate applicable for each six month period as established by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the

(iii) Final Decisions. The Contracting Officer will issue a final decision as required by 33.211 if-

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt in a timely manner;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see FAR 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.

(viii) Upon receipt and approval of the invoice designated by the Contractor as the "completion invoice" and supporting documentation, and upon compliance by the Contractor with all terms of this contract, any outstanding balances will be paid within 30 days unless the parties agree otherwise. The completion invoice, and supporting documentation, shall be submitted by the Contractor as promptly as practicable following completion of the work under this contract, but in no event later than 1 year (or such longer period as the Contracting Officer may approve in writing) from the date of completion.

(7) Release of claims. The Contractor, and each assignee under an assignment entered into under this contract and in effect at the time of final payment under this contract, shall execute and deliver, at the time of and as a condition precedent to final payment under this contract, a release discharging the Government, its officers, agents, and employees of and from all liabilities, obligations, and claims arising out of or under this contract, subject only to the following exceptions.

(i) Specified claims in stated amounts, or in estimated amounts if the amounts are not susceptible to exact statement by the Contractor.

https://www.acquisition.gov/far/33.211#FAR_33_211 https://www.acquisition.gov/far/32.607-2#FAR_32_607_2 https://www.acquisition.gov/far/32.608-2#FAR_32_608_2

(ii) Claims, together with reasonable incidental expenses, based upon the liabilities of the Contractor to third parties arising out of performing this contract, that are not known to the Contractor on the date of the execution of the release, and of which the Contractor gives notice in writing to the Contracting Officer not more than 6 years after the date of the release or the date of any notice to the Contractor that the Government is prepared to make final payment, whichever is earlier.

(iii) Claims for reimbursement of costs (other than expenses of the Contractor by reason of its indemnification of the Government against patent liability), including reasonable incidental expenses, incurred by the Contractor under the terms of this contract relating to patents.

(8) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(9) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(10) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid an amount for direct labor hours (as defined in the Schedule of the contract) determined by multiplying the number of direct labor hours expended before the effective date of termination by the hourly rate(s) in the contract, less any hourly rate payments already made to the Contractor plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system that have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred that reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance.

In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

---Addendum to 52.212-4---

A: DIAR 1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

https://www.acquisition.gov/far/52.212-5#FAR_52_212_5

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of Clause)

A: 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation: https://www.acquisition.gov/far http://www.acquisition.gov/far

Department of the Interior Acquisition Regulation: https://www.acquisition.gov/diar

(End of clause)

A: DOI-AAAP-0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE PROCESSING

PLATFORM (IPP) (MAR 2023)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

'Payment request' means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:

https://www.ipp.gov.

Concurrent to submitting an invoice in IPP, the contractor may submit any supporting documentation to jwahl@usbr.gov and bor-sha-Invoices@usbr.gov. Contractors are cautioned that supporting documentation e-mailed to the contracting officer and contract specialist must not conflict with the IPP submission. Conflicts between the IPP submission and supporting documentation may result in a delay in approval and/or rejection of submitted invoices.

When e-mailing supporting documentation, the subject line of the email shall be formatted as follows:

Contract Number, Invoice Number, Contracting Officer's last name (e.g., 140R2018R00000_Invoice No.

1_Smith). The invoice shall be attached to the email and named using the following format: Contract Number, Contractor Name, Invoice Number, Invoice Amount (e.g., 140R2022R00000_World Test, Inc. - Inv. No. 1 - $5,678). Invoices shall not include information that would compromise Personally Identifiable Information, such as full social security numbers, dates of birth, etc. The final invoice shall be submitted and will be approved in accordance with payment terms and conditions contained in the contract, after all, if any, settlement actions are complete. The contractor must clearly identify the last payment as the ‘Final Invoice’.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone

(866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

A: DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (DEC 2015)

1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance http://www.acquisition.gov/diar https://www.ipp.gov/ mailto:jwahl@usbr.gov mailto:bor-sha-Invoices@usbr.gov mailto:IPPCustomerSupport@fiscal.treasury.gov evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report.

Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.

4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.

5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.

a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.

b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.

c) All information provided should be reviewed for accuracy prior to submission.

d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.

e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.

f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."

6) The following guidelines apply concerning your use of the past performance evaluation:

a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.

b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

http://www.cpars.gov/ http://www.cpars.gov/

c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.

8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

(End of Local Clause)

A: 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

A: 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

A: 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

A: 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)

A: 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 15 days of contract expiring.

A: 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 15 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years 6 months.

A: 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Department of the Interior Acquisition Regulation (48 CFR Chapter 14) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

A: WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES AND LIMITATIONS --

BUREAU OF RECLAMATION (MAY 2018)

a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term "technical direction" is defined to include, without limitation:

(1) Inspecting and accepting or rejecting work performed under the contract.

(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.

(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.

(b) The Contractor will receive a copy of…