C04h Attachment 8 Site Visit Document Bear River 1240LT26Q0001.pdf
PDF 625 KB Posted
- Solicitation number
- 1240LT26Q0001
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Site Visit Plan for the Bear River Well Development project issued by the U.S. Forest Service's Uinta-Wasatch-Cache National Forest Engineering division. The site visit is scheduled for Wednesday, July 8th at 10 AM at the Bear River Guard Station, located approximately 31.5 miles from Evanston, Wyoming, toward the end of Mirror Lake Highway (HW-150) on the Evanston side, approximately 2.3 miles past "The Cabins at Bear River Lodge." The document includes detailed directions and a map showing the route from Evanston, Wyoming via WY-150 S and UT-150, with an estimated travel time of 32 minutes covering 31.5 miles.
During the site visit, attendees will examine the already-drilled well, walk the proposed waterlines and distribution lines, and inspect all visible existing infrastructure while discussing project details. The document provides turn-by-turn directions from Evanston including landmarks such as Arby's restaurant and notes regarding potential closures on UT-150 and entry into Wyoming. This Site Visit Plan serves as a presolicitation informational meeting for the well development and associated water distribution infrastructure project on U.S. Forest Service property.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Forest Service Uinta-Wasatch-Cache National Forest Engineering
Site Visit Plan For
Bear River Well Development
A site visit for the Bear River Well Development project will be held on Wednesday July 8th at 10 AM. We will be meeting at the Bear River Guard Station site, located towards the end of the Mirror Lake Highway (HW-150) on the Evanston Side. It is approximately 2.3 miles past “The Cabins at Bear River Lodge”, and approximately 31.5 miles from Evanston, WY. During the site visit we will start at the well that has already been drilled and walk the proposed waterlines. We will examine all visible existing infrastructure, walk the proposed distribution lines, and discuss details of the project. Please see the screenshots below for directions from Evanston, Wyoming.
File details come from the government source that posted it. Updated .