C04c Attachment 3 Drawing Signed Coversheet 1240LT26Q0001.pdf

PDF 617 KB Posted

Attached to
Bear River Administrative Site Well Development UWCNF
Solicitation number
1240LT26Q0001
Issued by

About this file

This document is a cover sheet for a set of engineering design drawings for water system improvements at the Bear River Administrative Site in Utah.

The project is located at the Bear River Administrative Site and Guard Station on the east side of Highway 150, approximately 29.6 miles from the USDA Forest Service Office in Evanston, Wyoming (coordinates: 40.882717, -110.830471). The site is part of the Uinta-Wasatch-Cache National Forest in Summit County, Utah, under the Evanston-Mountain View Ranger District within the Intermountain Region (R-4). The design package consists of 13 sheets, including site plans, water line and drain line profiles, hydrant and valve details, submersible pump installation specifications, utility building drawings, electrical site plans, and related infrastructure details. The drawings were prepared by the Forest Engineer and approved by the District Ranger, Director of Engineering, and Forest Supervisor. The document was finalized on February 5, 2026, and includes digital signatures from the relevant approving authorities (Ryan Stone—Forest Engineer; Kelsha Anderson—District Ranger; and Kevin Bourne—Forest Supervisor).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION

VICINITY MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture

Forest Service

1 13

STARTING AT THE USDA FOREST SERVICE OFFICE AT 1565 WY-150 IN EVANSTON, WY 82930. TURN

LEFT ONTO WY-150 AND FOLLOW FOR 29.6. THE BEAR RIVER ADMINISTRATIVE SITE AND GUARD

STATION WILL BE ON THE EAST SIDE OF HWY 150. THE APPROXIMATE PROJECT COORDINATES ARE:

40.882717, -110.830471

RECOMMENDED BY:

APPROVED:

FOREST ENGINEER

DISTRICT RANGER DATE

DATE

DIRECTOR OF ENGINEERING DATE

FOREST SUPERVISOR DATE

2/5 /26

:1

0 E

LI

AS

PR

IM

ME

R C:

\U

SE

RS

\E

LI

AS

PR

IM

ME

R\

BO

X\

EN

GD

ES

IG

N\

UI

NT

AW

AS

AT

CH

CA

CH

E\

BE

AR

RI

VE

RA

DM

IN

SI

TE

.W

AT

ER

SY

ST

EM

.20

\D

RA

W

IN

GS

\B

EA

RR

IV

ER

_W

EL

L

DE

VE

LO

PM

EN

T.

.2.

DW

G;

UTAH

SUMMIT COUNTY

R - 4 INTERMOUNTAIN REGION

UINTA - WASATCH - CACHE NATIONAL FOREST

EVANSTON - MOUNTAIN VIEW RANGER DISTRICT

INDEX OF SHEETS

SHEET DWG SHEET TITLE

1 G-01 COVERSHEET

2 S1 EXISTING BEAR RIVER ADMIN SITE PLAN

3 S2 WATER LINE SITE PLAN

4 S3 WATER MAIN PROFILE

5 S4 DRAIN LINE PROFILE

6 S5 WATER HYDRANT SPUR PROFILE

7 W1 SUBMERSIBLE PUMP INSTALLATION DETAIL

8 W2 UTILITY BUILDING

9 W3 WATER LINE DETAILS

10 W4 WATER HYDRANT DETAIL

11 W5 WATER VALVE AND THRUST BLOCK DETAIL

12 W6 UTILITY BOX DETAIL

13 E1 ELECTRICAL SITE PLAN

BEAR RIVER ADMINISTRATIVE SITE

WATER SYSTEM IMPROVEMENTS

2026-04-28T11:43:05-0600
KEVIN BOURNE

File details come from the government source that posted it. Updated .