C04e_Attachment 5 Building Floor Plan_12444326Q0021.pdf
PDF 556 KB Posted
- Attached to
- Marienville Ranger District Janitorial Services
- Solicitation number
- 12444326Q0021
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a List of Attachments showing J5 Building Floor Plans for the Marionville Ranger Station. The attachment includes three floor plan diagrams: the 1st Floor, 2nd Floor, and Warehouse layout of the J5 Building. Each floor plan contains a legend identifying various design elements including fire alarm control panels, fire alarm annunciator panels, addressable smoke detectors, addressable heat detectors, fire pull stations, smoke 2007 strobe/bells, strobe/bells, fire extinguishers, AEDs, first aid kits, and charts. The 1st Floor plan depicts multiple office spaces, rest rooms, equipment areas, and various labeled zones with red lines indicating evacuation routes or system pathways. The 2nd Floor plan shows similar office configurations with designated areas and emergency systems. The Warehouse section illustrates a simplified layout with restroom facilities and office space. These floor plans serve as reference materials for the J5 Building facility and its safety and emergency response infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SarahNeeds Highlight
SarahNeeds Highlight
SarahNeeds Highlight
SarahNeeds Highlight
File details come from the government source that posted it. Updated .