C04b Attachment 2 Specifications 1160423.pdf
PDF 3 MB Posted
- Attached to
- Lighting Renovation for USDA ARS in Ames, IA (Amended) Federal contract opportunity
- Solicitation number
- 1232SA26Q0962
About this file
This is a specifications document for a lighting renovation project at the USDA Agricultural Research Service facility in Ames, Iowa. The project is solicited as a Total Small Business Set-Aside under RFQ 1232SA26Q0962, with an estimated construction value between $1.7 million and $2.3 million. The work involves comprehensive lighting system upgrades and renovations throughout the ARS facility, with specific technical requirements outlined in the attached specifications. Quotations must include a bid bond at submission, with performance and payment bonds required following award. A mandatory site visit is required, with RSVP information and additional submission requirements detailed in the SF1442 attachment.
The specifications document establishes detailed technical standards and performance criteria that all quotations must meet, covering lighting equipment, installation methodology, safety requirements, and quality assurance measures. Contractors must be capable of meeting the specified standards for commercial lighting systems and related construction activities. The acquisition falls under NAICS code 238210 with a $19.0 million small business size standard, ensuring competition is limited to qualifying small business concerns. All responsible sources, including small businesses, may submit quotations for consideration by the Department of Agriculture.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C05 SF30 1232SA26Q09620001.pdf | ||
| C05a Attachment 8 Specifications Addendum.pdf | ||
| C05b Attachment 9 Q and A.pdf | ||
| C04e Attachment 5 ARS_371_CONSTRUCTION PROGRESS.pdf | ||
| C04c Attachment 3 Drawings 1160423.pdf | ||
| C04g Attachment 7 SF1413 Subcontractor Acknowlegement.pdf | ||
| C04d Attachment 4 Wage Determination.pdf | ||
| C04 SF1442 RFQ 1232SA26Q0962.pdf | ||
| C04a Attachment 1 Statement of Work 1160423.pdf | ||
| C04f Attachment 6 ARS_372_REQUEST FOR PAYMENT TRANSMITTAL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Agricultural Research Service
100% Contract Documents Contract No. 12505B23F0175 Order Date. 9/25/2023 BED Project No. 023116
USDA National Center for Animal Health Building 7 Lighting Renovation 1920 Dayton Avenue Ames, IA 50010
Date:8/12/2025
Bailey Edward Design, Inc.
35 E Wacker Drive Suite 2800 Chicago, IL 60601 312-440-2300
USDA
United States Department of Agriculture Contract No: 12505B23D0008/1250B23F0175
Project No: NCAH-FEU #22005
USDA – NCAH Building 7 Lighting Renovation 1920 Dayton Avenue Ames, Iowa 50010
TOC - 1
TABLE OF CONTENTS
Division 01 – General Requirements
Section 01 01 00 General Requirements 01 01 00 – 08 Section 01 25 00 Substitution Procedures 01 25 00 – 03 Section 01 25 01 Substitution Request Form 01 25 01 – 02 Section 01 50 00 Temporary Facilities and Controls 01 50 00 – 06
Division 02 – Existing Conditions
Section 02 41 19 Selective Demolition 02 41 19 – 07
Division 26 – Electrical
Section 26 05 00 Basic Electrical Requirements 26 05 00 – 33 Section 26 05 03 Through Penetration Fire Stopping 26 05 03 – 07 Section 26 05 05 Electrical Demolition For Remodeling 26 05 05 – 04
Section 26 05 13 Wire and Cable 26 05 13 – 12 Section 26 05 33 Raceways and Boxes for Electrical Systems 26 05 33 – 09 Section 26 09 34 Lighting Control Systems 26 09 34 – 37 Section 26 27 26 Wiring Devices 26 27 26 – 35 Section 26 51 19 LED Lighting 26 51 19 – 12
END OF TOC
USDA NCAH Building 7 Lighting Renovation Ames, IA
GENERAL REQUIREMENTS 01 01 00 - 1
SECTION 01 01 00 – GENERAL REQUIREMENTS
1.1 Scope of Work
A. Project Title: Building 7 Lighting Renovation
B. Project Location: USDA – National Centers for Animal Health
1920 Dayton Avenue, Ames, IA 50010
C. Description of Work: The work is described in the Construction Documents and the major elements are:
1. Complete removal and upgrade of the existing lighting and lighting control systems.
2. The contractor shall commission the lighting control system.
3. The contractor shall phase the efforts to maintain partial operation of research during construction.
D. Construction Documents:
Technical Specifications & Drawings: Dated 10 11 2024 and prepared by Bailey Edward Design, 35 East Wacker Drive, Suite 2800, Chicago, IL 60601
1.2 Pre-Bid/Proposal Site Visit
A. Differing Site Conditions, and Site Investigations and Conditions Affecting the Work clauses are included in this solicitation. Accordingly, offerors or quoters are urged to inspect the site where the work will be performed.
B. An organized pre-bid site visit for this project will be scheduled for this project
1. The date and time set by the Contracting Officer, at the project location site:
USDA National Center for Animal Health 1920 Dayton Avenue Ames, IA 50010
2. The pre-bid site visit for this project is not mandatory for the Bidders. The Bidders are responsible for accounting for all existing conditions that may have been visible at the time of the bidding whether or not they attended the pre-bid conference. Failure of Bidders to attend the pre-bid conference does not relieve the Bidders of the responsibility of including existing conditions in their bids.
1.3 Pre-Construction Conference
A. The Contractor and major subcontractor representatives shall attend the virtual post-award/preconstruction meeting scheduled by the Contracting Officer (CO). The meeting topics will include submissions required prior to issuance of the Notice to Proceed (NTP), contract management, roles of the government’s representatives (COR, LC, and A-E), the project schedule, submittal procedures, payment application procedures, site access, contract close-out, and other issues as determined by the CO. Meeting notes will be distributed by the contractor.
1.4 Progress Meetings
GENERAL REQUIREMENTS 01 01 00 - 2
A. The Contractor, and subcontractors as appropriate for the current work activity, shall attend bi-weekly construction progress meetings on the site. The meeting will generally be held at a regular time each week.
The Contractor will report on current progress, short-term work plans, and will update the work schedule.
Meeting topics will also include government coordination, RFIs, unforeseen conditions, inspection reports & observations, potential changes, submittals, and payment applications. Meeting notes will be recorded and distributed by the contractor. The contractor shall manage the kick-off and progress meetings that are held every other week. Provide an agenda, submittal log, and three weeks look ahead no less than 24 hours prior to the meeting. Provide minutes for the meeting within 48 hours of the completion of the meeting. The A-E of record for the project will attend the meeting virtually once each month and at critical times during the construction period. During periods of minimal or no on-site activity, the COR may cancel the meeting.
1.5 Superintendence by the Contractor
A. At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite competent superintendent who is satisfactory to the Contracting Officer and the COR, and has authority to act for the Contractor.
1.6 Permits and Responsibilities
A. The contractor shall, without additional expense to the government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The contractor shall also be responsible for all damages to persons or property that occur as a result of the contractor's fault or negligence. The contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.
B. No City or County building permits are required for execution of this project on the USDA site.
C. The contractor shall be responsible for coordinating deliveries with the USDA and the delivery personnel to ensure that deliveries are made to the jobsite at building 7. Deliveries shall not be made to a USDA warehouse or other facility other than the building 7 project site.
1.7 Differing Site Conditions
A. The contractor shall promptly, and before the conditions are disturbed, give a written notice to the Contracting Officer of (1) subsurface or latent physical conditions at the site which differ materially from those indicated in this contract, or (2) unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inhering in work of the character provided for in the contract.
B. The Contracting Officer shall investigate the site conditions promptly after receiving the notice. If the conditions do materially so differ and cause an increase or decrease in the contractor's cost of, or the time required for, performing any part of the work under this contract, whether or not changed as a result of the conditions, an equitable adjustment shall be made under this clause and the contract modified in writing accordingly.
C. No request by the contractor for an equitable adjustment to the contract under this clause shall be allowed, unless the contractor has given the written notice required to the Contracting officer’s representative
D. .
GENERAL REQUIREMENTS 01 01 00 - 3
E. No request by the contractor for an equitable adjustment to the contract for differing site conditions shall be allowed if made after final payment under this contract.
1.8 Site Investigations & Conditions Affecting the Work
A. The contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to (1) conditions bearing upon transportation, disposal, handling, and storage of materials; (2) the availability of labor, water, electric power, and roads; (3) uncertainties of weather, river stages, tides, or similar physical conditions at the site; (4) the conformation and conditions of the ground; and (5) the character of equipment and facilities needed preliminary to and during work performance. The contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the government, as well as from the drawings and specifications made a part of this contract. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the government.
B. The government assumes no responsibility for any conclusions or interpretations made by the contractor based on the information made available by the government. Nor does the government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.
1.9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
A. The contractor shall protect from damage all existing improvements and utilities (1) at or near the work site and (2) on adjacent property of a third party, the locations of which are made known to or should be known by the contractor. The contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the contractor.
1.10 Operations & Storage Areas
A. The contractor shall confine all operations (including storage of materials) on government premises to areas authorized or approved by the Contracting Officer. The contractor shall hold and save the government, its officers and agents, free and harmless from liability of any nature occasioned by the contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the contractor without expense to the government. The temporary buildings and utilities shall remain the property of the contractor and shall be removed by the contractor at its expense upon completion of the work.
C. The contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the contractor when and as authorized by the Contracting Officer. When materials are transported in executing the work, vehicles shall not be loaded
GENERAL REQUIREMENTS 01 01 00 - 4
beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the contractor shall protect them from damage. The contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
1.11 Use and Possession prior to Completion
A. The government shall have the right to take possession of or use any completed or partially completed part of the work. Before taking possession of or using any work, the Contracting Officer shall furnish the contractor a list of items of work remaining to be performed or corrected on those portions of the work that the government intends to take possession of or use. However, failure of the Contracting Officer to list any item of work shall not relieve the contractor of responsibility for complying with the terms of the contract.
The government's possession or use shall not be deemed an acceptance of any work under the contract.
B. While the government has such possession or use, the contractor shall be relieved of the responsibility for the loss of or damage to the work resulting from the government's possession or use, notwithstanding the terms of the clause in this contract entitled "Permits and Responsibilities." If prior possession or use by the government delays the progress of the work or causes additional expense to the contractor, an equitable adjustment shall be made in the contract price or the time of completion, and the contract shall be modified in writing accordingly.
1.12 Work-site Drawings & Specifications
A. The contractor shall keep on the work site a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto. During the entire construction period, the Contractor shall mark-up the Work-site Drawings and Specifications to keep the documents current with any corrections, RFI responses, changes/modifications, clarifications, and other field notes.
B. Anything mentioned in the specifications and not shown on the drawings or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawings and specifications, the specifications shall govern. In case of discrepancy in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the Contracting Officer, who shall promptly make a determination in writing. Any adjustment by the contractor without such a determination shall be at its own risk and expense. The Contracting Officer shall furnish from time to time such detailed drawings and other information as considered necessary, unless otherwise provided.
C. Wherever in the specifications or upon the drawings the words "directed," "required," "ordered,"
"designated," "prescribed," or words of like import are used, it shall be understood that the "direction," "requirement," "order," "designation," or "prescription," of the Contracting Officer is intended and similarly the words "approved," "acceptable," "satisfactory," or words of like import shall mean "approved by," or "acceptable to," or "satisfactory to" the Contracting Officer, unless otherwise expressly stated.
D. Where "as shown," "as indicated," "as detailed," or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise. The word "provided" as used herein shall be understood to mean "provide complete in place," that is "furnished and installed."
1.13 Cleaning Up
A. The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any
GENERAL REQUIREMENTS 01 01 00 - 5
rubbish, tools, scaffolding, equipment, and materials that are not the property of the government. Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer’s Representative.
1.14 Submittals & Shop Drawings
A. General:
1. Shop drawings means drawings, submitted to the government by the contractor, subcontractor, any lower tier subcontractor pursuant to a construction contract, showing in detail (1) the proposed fabrication and assembly of structural elements and (2) the installation (i.e., form, fit, and attachment details) of materials of equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the contractor to explain in detail specific portions of the work required by the contract.
2. The contractor shall coordinate all such drawings, and review them for accuracy, completeness, and compliance with contract requirements and shall indicate its approval thereon as evidence of such coordination and review. Shop drawings submitted without evidence of the contractor's approval may be returned for resubmission.
3. If shop drawings show variations from the contract requirements, the contractor shall describe such variations in writing, separate from the drawings, at the time of submission. If the Contracting Officer/Representative approves any such variation, the Contracting Officer shall issue an appropriate contract modification, except that, if the variation is minor or does not involve a change in price or in time of performance, a modification need not be issued.
B. Submittal Register:
1. At the beginning of the project, the Contractor will provide a Submittal Register identifying all the items called out in the Specifications for submittal to the COR for approval (in consultation with the project AE if applicable). The Contractor will update and maintain the Submittal Register to show the current status of all required submittals for all construction project meetings and when requested by the CO or
COR.
C. Submittal Requirements
1. Format: There is no formal submittal transmittal or format for this project other than the documents shall be submitted as PDF files, scanned or created in documents that can be easily read when printed on 8- 1/2 x 11 or 11x17 sheets. Exceptions for larger sheet sizes will be considered by the COR. Failure of the Contractor to provide legible submittals will be adequate grounds for rejection.
2. Identification: Submittals shall be labeled and marked for this project. The submittal identification shall include: Contractor/subcontractor’s name, date of submittal, description of item, specification section, and details on product data that are marked clearly for this project.
D. Substitutions
1. Equal or equivalent substitutions for Basis of Design products specified may be approved. Proposed substitutions will be determined to be equivalent if the product/item will provide the same or better performance, functions, capabilities, service life, maintenance and operating costs, and warranty. Any additional costs to install or adjust the project design to accommodate the substitution will be paid by the Contractor. The Contractor has responsibility to demonstrate equivalence of the proposed substitution. All substitutions are required to be approved by the COR in advance of installation and approval will follow the Shop Drawing approval submission procedure.
GENERAL REQUIREMENTS 01 01 00 - 6
a. Reference specification sections 01 25 00 “Substitution Procedures” and 01 25 01 “Substitution Request Form”.
E. Submittal Procedures
1. All submittals will be email transmitted in PDF by the Contractor to the COR and A-E contact for this project. This same submittal process will be used for RFIs, Change Bulletins, samples, etc.
2. The CO/Submittal Reviewing Authority/A-E will indicate an approval or disapproval of the shop drawings and if not approved as submitted shall indicate the reasons for disapproval.
F. Approved Submittals
1. Approved copies will be in PDF format and will be returned and distributed to the contractor via email.
2. Any work done before such approval shall be at the contractor's risk.
3. Approval by the Contracting Officer shall not relieve the contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with the requirements of this contract.
4. Approved submittals must also be kept at the jobsite similar to plans and specifications.
1.15 Construction Invoice Preparation and Submission
A. Schedule of Values: Prior to submission of the first progress payment application/invoice, the Contractor shall have submitted and received approval from the Contracting Officer (CO) of a Schedule of Values for the project on ARS Form 371. The schedule shall break the project scope into sub-units such that the government representatives reviewing payment requests may fairly judge progress and completion on each line item. No payments will be processed prior to approval of the Schedule of Values.
B. Invoice Processing Platform: Progress payment applications/invoices for this project will be electronically processed through the US Treasury Invoice Processing Platform (IPP) system and the Contractor will submit invoices directly into IPP. Prior to electronic submission, a draft invoice review process will be established by the CO for COR/government representative review of draft payment applications; which will include submission of completed ARS Forms 371 & 372 and contractor’s certification of payments to subcontractors and suppliers.
1.16 Other Contracts
A. The government may undertake or award other contracts for additional work at or near the site of the work under this contract. The contractor shall fully cooperate with the other contractors and with government employees and shall carefully adapt scheduling and performing the work under this contract to accommodate the additional work, heeding any direction that may be provided by the Contracting Officer.
The contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or by government employees.
1.17 Contractor Close-out
A. Training
1. Where called out in the technical specifications, the contractor shall provide training to operate and maintain the equipment provided under this contract. The contents of the training materials shall be reviewed with the COR and accepted as adequate.
2. Documentation of training shall at a minimum include:
a. Copy of materials (PDF) used to provide the training.
GENERAL REQUIREMENTS 01 01 00 - 7
b. Date & location the training was completed.
c. Names and positions of the Owner’s staff completing the training.
d. Provide a flash drive with a file containing recording of training. The recording shall be made by a professional videographer.
B. Final Inspection
1. . A final inspection shall be performed at the end of each phase. The contractor shall complete final inspection punch list efforts prior to turning the phase over to the USDA.
2. A final inspection shall be made only when all the materials have been furnished, all the work has been performed, and all the construction provided for by the contract in accordance with the terms has been completed. If, upon examination by the Contracting Officer and/or government inspection personnel, the project is determined not sufficiently completed to have warranted a final inspection, the contractor may be charged with any additional cost of re-inspection when material and workmanship are not ready at the time specified by the Contractor for its inspection.
3. The contractor shall give the Contracting Officer ten (10) calendar days advance notice, in writing, of the date the work will be fully completed and ready for final inspection.
4. As soon as practicable, following final inspection, the Contracting Officer will inform the contractor, in writing, of any discrepancies and/or omissions noted at the final inspection. The Contracting Officer shall also state the time allowable for replacement of material and performance or re-performance of any unsatisfactory work necessary for final acceptance.
C. Final Acceptance
1. Upon written notification that all deficiencies identified during the final inspection have been corrected, the Contracting Officer will schedule a final acceptance inspection of the work. If all construction required by the contract is found completed and all contract requisites (i.e. payroll documents, final payment requests, release from claims, etc.) Submitted, the Contracting Officer shall notify the Contractor of such acceptance in writing. Written acceptance shall be final and conclusive except as regards latent defects, fraud, or such gross mistakes as may amount to fraud, or as regards the government’s right under any warranty or guarantee.
2. The Contractor’s request for final acceptance will not be approved unless documentation below, at a minimum, has been provided to the Contracting Officer, in addition to all other contract requirements:
a. Redline/As built drawings
b. Special equipment testing certifications
c. Record of or definite schedule for systems demonstrations.
d. Point to point checks demonstrating that the controls inputs and outputs have been tested.
e. Operating manuals and instructions for equipment items
f. Guarantees and warranty schedule and contacts
g. Certificates of required inspections
h. Training of Appropriate government personnel
i. Certified payroll records for all prime and subcontractor employees
D. Close-out Submittals
1. Warranty Documentation
GENERAL REQUIREMENTS 01 01 00 - 8
a. Warranty List: Provide a warranty summary sheet in spreadsheet format with all the warranties listed by section, description, supplier, warranty contact, start date, end date. Provide electronic copy to the CO and COR and place printed copy in the front of the Warranty Binder.
b. Warranty Copies in Binder: Provide one signed & dated copy of all warranties for products and equipment installed on the project. The Warranty binder shall be divided by Specification Section and shall be provided to the COR. An electronic (scanned) copy of the Warranty Binder in a PDF file shall be submitted with the final close-out documentation to both the CO & COR.
2. Operation & Maintenance Manuals:
a. Contractor shall provide a printed copy of all Operation & Maintenance documentation provided with equipment and systems installed in the project and place the manuals in an organized binder.
The O&M Manuals shall be organized by specification section and shall have an index at the front of the binder. The Contractor shall also provide a PDF version of the Manuals to be submitted with the close-out documentation.
3. Record Drawings
a. Redline Specifications: During the construction period the Contractor shall keep an updated & marked-up or “redline” copy of the project specifications on the jobsite. The redline set shall include notes on changes, RFI responses, and other field notes. At the end of the project the Contractor shall electronically scan the redline specifications and provide an electronic copy in PDF to the government along with the close-out documentation.
b. Redline Drawings: During the construction period the Contractor shall keep an updated “redline” or “conformed” copy of the project drawings on the jobsite. The redline set shall include notes on changes, RFI responses, and other field notes. At the end of the project the Contractor shall electronically scan the redline drawings at full-size and in color, and provide an electronic copy in PDF to the government along with the close-out documentation.
c. The COR will coordinate review of the Redline Documents with NCAH FEU staff for completeness.
If the documentation is not complete, the Contractor will be required to provide make corrections and provide complete redline documents before final payment/acceptance is recommended to the
CO.
END OF SECTION 01 01 00
USDA NCAH Building number 7 Lighting Renovation
SUBSTITUTION PROCEDURES 01 25 00 - 1
SECTION 01 25 00 – SUBSTITUTION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for substitutions.
B. Related Requirements:
1. Applicable sections of the technical Specifications.
1.2 DEFINITIONS
A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.
1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms.
2. Substitutions for Convenience: Changes proposed by Contractor or the government that are not required in order to meet other Project requirements but may offer advantage to Contractor or the government.
1.3 ACTION SUBMITTALS
A. Substitution Requests: Each Contractor to submit three copies of each request for consideration to Coordinating Contractor. Coordinating Contractor to verify information submitted by Each Contractor is correct and complies with the information below prior to submitting to Architect. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.
1. Substitution Request Form: Use the provided form in pdf format of form provided in Project Manual.
2. Documentation: Show compliance with requirements for substitutions and the following, as applicable:
a. Statement indicating why specified product or fabrication, or installation cannot be provided, if applicable.
b. Coordination information, including a list of changes or revisions needed to other parts of the Work and to construction performed by the government and separate contractors, that will be necessary to accommodate proposed substitution.
c. Detailed comparison of significant qualities of proposed substitution with those of the Work specified. Include annotated copy of applicable Specification Section. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.
d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.
SUBSTITUTION PROCEDURES 01 25 00 - 2
e. Samples, where applicable or requested.
f. Certificates and qualification data, where applicable or requested.
g. List of similar installations for completed projects with project names and addresses and names and addresses of architects and the Owners.
h. Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated.
i. Research reports evidencing compliance with building code in effect for Project, from ICC-
ES.
j. Detailed comparison of Contractor's construction schedule using proposed substitution with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.
k. Detailed cost information, including a proposal of change, if any, in the Contract Sum.
l. Contractor's certification that proposed substitution complies with requirements in the
Contract Documents except as indicated in substitution request, is compatible with related materials, and is appropriate for applications indicated.
m. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.
3. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within seven days of receipt of a request for substitution. Architect will notify Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later.
a. Forms of Acceptance: Change Order, Construction Change Directive, or Architect's Supplemental Instructions for minor changes in the Work.
b. Use product specified if Architect does not issue a decision on use of a proposed substitution within time allocated.
1.4 QUALITY ASSURANCE
A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.
1.5 PROCEDURES
A. Coordination: Revise or adjust affected work as necessary to integrate work of the approved substitutions.
PART 2 - PRODUCTS
2.1 SUBSTITUTIONS
A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than twenty (20) calendar days prior to time required for preparation and review of related submittals.
SUBSTITUTION PROCEDURES 01 25 00 - 3
1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements:
a. Requested substitution is consistent with the Contract Documents and will produce indicated results.
b. Substitution request is fully documented and properly submitted.
c. Requested substitution will not adversely affect Contractor's construction schedule.
d. Requested substitution is acceptable to the authorities having jurisdiction.
e. Requested substitution is compatible with other portions of the Work.
f. Requested substitution has been coordinated with other portions of the Work.
g. Requested substitution provides specified warranty.
h. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.
B. Substitutions for Convenience: Architect will consider requests for substitution if received within twenty (20) calendar days prior to bid opening. Requests received after that time will not be considered. When request is approved, Architect may issue an appropriate addendum within seven
(7) calendar days prior to bid opening dates.
1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements:
a. Requested substitution offers the government a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional responsibilities the government must assume. The government's additional responsibilities may include compensation to Architect for redesign and evaluation services, increased cost of other construction by the government, and similar considerations.
b. Requested substitution does not require extensive revisions to the Contract Documents.
c. Requested substitution is consistent with the Contract Documents and will produce indicated results.
d. Substitution request is fully documented and properly submitted.
e. Requested substitution will not adversely affect Contractor's construction schedule.
f. Requested substitution has received necessary approvals of authorities having jurisdiction.
g. Requested substitution is compatible with other portions of the Work.
h. Requested substitution has been coordinated with other portions of the Work.
i. Requested substitution provides specified warranty.
j. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.
PART 3 - EXECUTION (NOT USED)
END OF SECTION 01 25 00
SUBSTITUTION REQUEST FORM 01 25 01 - 1
01 25 01 – SUBSTITUTION REQUEST FORM
TO: USDA Contracting Officer
INSTALLER: _________________________________ PHONE: _______________
Name of Installer
ADDRESS: _________________________________
1. Specification Section: _____________________ Paragraph: __________________________
1. Reason for Substitution:
2. Proposed Substitute:
A. Name and Model No. ____________________________________________
B. Manufacturer: __________________________________________________
Address: ______________________________________________________
Phone Number and Person to Contact: ______________________________
B. Attach applicable performance and test data.
C. Numbers of applicable reference standards: _______________________
D. Attach a color chart, if applicable.
E. Attach installation instructions.
1. Manufacturer's Reputation: Attach evidence of manufacturer qualifications and reputation for prompt deliv-ery and efficiency in servicing products, as applicable.
2. Comparison: Attach an itemized comparison of the proposed substitution with product specified, including test performance data.
3. Changes in Work: Attach data relating to changes required in other work to permit use of proposed substi-tution and changes required in construction schedule.
SUBSTITUTION REQUEST FORM 01 25 01 - 2
4. Previous Installation: Attach list of not less than 5 similar projects on which proposed substitution was used.
List projects in the Ames Iowa area. List name and address of project, date of installation, and name, ad-dress, and phone number of Architect.
5. Cost Data: Attach accurate cost data on proposed substitution in comparison with product specified.
6. In making request for substitution, Contractor represents that:
a. It has examined the Drawings and Specifications and has determined that, to the best of its knowledge, the proposed substitution is appropriate for the use intended in the Drawings and Specifications and will perform as well as or better than the specified product.
b. It will provide the same warranties for substitution as for product specified.
c. It will coordinate installation of accepted substitution into Work, making such changes as may be required for Work to be complete in all respects.
d. It waives all claims for additional costs related to substitution which consequently become appar-ent.
e. Cost data is complete and includes all related costs under its Contract.
Name of Manufacturer, Signature of Manufacturer's Representative DATE
Name of Installer, Signature of Installer's Representative DATE
Name of Prime Contractor, Signature of Prime Contractor's Representative DATE
Name of Coordinating Contractor, Signature of Coordinating Contractor’s Representative DATE
END OF SUBSTITUTION REQUEST FORM
TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 1
SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.
B. Related Requirements:
1. Section 01 01 00 – General Requirements
1.3 USE CHARGES
A. Installation, removal, and use charges for temporary facilities shall be included in the Contract Sum unless otherwise indicated. Allow other entities engaged in the Project to use temporary services and facilities without cost, including, but not limited to, Architect, occupants of Project, testing agencies, and authorities having jurisdiction.
B. Electric Power Service from Existing System: Limited electric power from the government's existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.
1.4 INFORMATIONAL SUBMITTALS
A. Site Utilization Plan: Show temporary facilities, temporary utility lines and connections, staging areas, construction site entrances, vehicle circulation, and parking areas for construction personnel.
B. Fire-Safety Program: Show compliance with requirements of NFPA 241 and authorities having jurisdiction.
Indicate Contractor personnel responsible for management of fire-prevention program.
C. Noise and Vibration Control Plan: Identify construction activities that may impact the occupancy and use of existing spaces within the building or adjacent existing buildings, whether occupied by others, or occupied by the government. Include the following:
1. Methods used to meet the goals and requirements of the government.
2. Concrete cutting method(s) to be used.
3. Location of construction devices on the site.
4. Show compliance with the use and maintenance of quieted construction devices for the duration of the Project.
TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 2
5. Indicate activities that may disturb building occupants and that are planned to be performed during non-standard working hours as coordinated with the government.
6. Indicate locations of sensitive research and equipment areas or other areas requiring special attention as identified by the government. Indicate means for complying with the government's requirements.
D. Hot Work: Any work that uses an open flame, that produces heat or produces sparks shall be coordinated with the USDA. Obtain a hot work permit prior to commencing with the hot work.
1.5 QUALITY ASSURANCE
A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.
B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary utility before use. Obtain required certifications and permits.
1.6 PROJECT CONDITIONS
A. Temporary Use of Permanent Facilities: Engage Installer of each permanent service to assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before the government's acceptance, regardless of previously assigned responsibilities.
PART 2 - PRODUCTS
2.1 TEMPORARY FACILITIES
A. Storage facilities: Provide enclosed facilities sized, furnished, and equipped to accommodate materials and equipment for construction operations.
1. Store combustible materials apart from building.
2.2 EQUIPMENT
A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.
PART 3 - EXECUTION
3.1 TEMPORARY FACILITIES, GENERAL
A. Conservation: Coordinate construction and use of temporary facilities with consideration given to conservation of energy, water, and materials. Coordinate use of temporary utilities to minimize waste.
TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 3
3.2 INSTALLATION, GENERAL
A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.
1. Locate facilities to limit site disturbance. Location shall be approved by the contracting officers representative.
B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.
C. Isolation of Work Areas near Occupied Facilities: Prevent dust, fumes, and odors from entering occupied areas.
1. Perform daily construction cleanup.
3.3 TEMPORARY UTILITY INSTALLATION
A. General: Install temporary service or connect to existing service.
B. Sanitary Facilities: Provide temporary toilets, wash facilities, safety shower and eyewash facilities, and drinking water for use of construction personnel. Comply with requirements of authorities having jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities.
C. Electric Power Service: Connect to the government's existing electric power service. Maintain equipment in a condition acceptable to the government.
3.4 SUPPORT FACILITIES INSTALLATION
A. Comply with the following:
1. Temporary construction within 30 feet of building lines shall be non-combustible. Comply with
NFPA 241.
2. Coordinate with the COR to obtains space within the existing building for temporary field offices.
3. Remove before Substantial Completion. Personnel remaining after Substantial Completion will be permitted to use permanent facilities, under conditions acceptable to the government.
B. Traffic Controls: Comply with requirements of authorities having jurisdiction.
1. Protect existing site improvements to remain, including curbs, pavement, and utilities.
2. Maintain access for fire-fighting equipment and access to fire hydrants.
C. Parking: On site parking is available for the contractor. Coordinate the locations with the COR to obtain parking locations.
D. Storage and Staging: Use designated storage area on Site Plan for storage and staging needs.
E. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of authorities having jurisdiction. Coordinate locations
TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 4
of trash containers with the COR. The contractor shall provide tickets or receipts to indicate the disposal facility, the disposal facility location, material disposed of, and the weight of the material.
F. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel.
1. Truck cranes and similar devices used for hoisting materials are considered "tools and equipment" and not temporary facilities.
G. Temporary Elevator Use: The building does not have an elevator.
H. Existing Stair Usage: The stairs are to be utilized to transport material into the attic and basement areas.
3.5 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Protection of Existing Facilities: Protect existing vegetation, equipment, structures, utilities, and other improvements at Project site and on adjacent properties, except those indicated to be removed or altered.
Repair damage to existing facilities.
B. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction as required to comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
1. Comply with work restrictions specified in Section 01 01 00 "General Requirements".
END OF SECTION 01 50 00
SELECTIVE DEMOLITION 02 41 19 - 1
SECTION 02 41 19 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Selective demolition of building elements indicated and specified, and as required for installation of new work required for the completion of the project.
B. REFERENCE STANDARDS
1. NFPA 241 - Standard for Safeguarding Construction, Alteration, and Demolition Operations; 2013.
1.2 DEFINITIONS
A. Remove and Salvage: Detach items from existing construction, where indicated, and deliver them to the government ready for reuse.
B. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated.
C. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
D. Remove and Recycle: Detach items from the existing construction and dispose of the items at an official recycling facility. Provide tickets or receipts that define the recycling facility, material type and the weight of the material.
E. Remove/Demolish: Detach the item and dispose of the item in a landfill facility. Provide receipts to define the material, weight of the material and the facility used to dispose of the items.
1.3 ADMINISTRATIVE REQUIREMENTS
A. Preinstallation Meeting: Conduct a preinstallation meeting at least one week prior to the start of the work of this section.
1. Ensure required submittals have been provided with sufficient time for review prior to scheduling the Preinstallation Meeting.
2. Review the detailed requirements for the work of this section and to review the drawings and specifications for this work
a. Require attendance by all affected installers including but not limited to
1) Contractor's Superintendent
2) Installer
3) Manufacturer/Fabricator Representative
4) Other affected Subcontractors
5) Architect/Engineer of Record
6) The contracting officer.
7) The contracting officer’s Representative
SELECTIVE DEMOLITION 02 41 19 - 2
3. Review the scope of work, inspect and discuss condition of construction areas to be selectively demolished.
4. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
5. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
6. Review areas where existing construction is to remain and requires protection.
7. Record minutes and distribute copies within 5 days after meeting to participants as well as
Architect/Engineer of Record, the government and those affected by decisions made.
1.4 SUBMITTALS
A. Schedule of Selective Demolition Activities: Indicate the following:
1. For purposes of the government’s information only, sequence of selective demolition and removal work, with starting and ending dates for each activity as well as shift starting and ending times.
Ensure the government's on-site operations are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Coordinate with the government regarding shutoff of coolers.
5. Use of elevator and stairs if acceptable to the Government.
6. Coordination of the government's continuing occupancy of portions of existing building and of the government's partial occupancy of completed Work.
7. Means of protection for items below the roof.
8. Path of waste removal from building and locations of waste containers.
B. Pre-demolition Documentation: Show existing conditions of adjoining construction and site improvements, that might be misconstrued as damage caused by building demolition operations. Submit before beginning work on this section. All photography of site conditions, buildings, equipment, people, animals, etc... must be approved by COR prior to any photography being taken. Provide digital images in PDF format.
C. Inventory: After demolition is complete,…
This is the start of the file's text. The full file is on GovTribe.