C04a - Schedule of Items - 1240LT26Q0135.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Stockmore Admin Site Renovation
Solicitation number
1240LT26Q0135
Issued by

About this file

This is a Schedule of Items spreadsheet that details the line items and pricing structure for the Stockmore Admin Site Renovation project at the Forest Service Stockmore Building. The document is organized as an Excel file containing the base work and three optional work categories for the solicitation 1240LT26Q0135.

The base contract work includes window installations, exterior door installations, door hardware installations on two garage closet doors, demolition work, electrical work, and remodeling work in two restrooms. Option 1 encompasses preparation, priming, and painting of interior walls, ceilings, wood trim, and doors. Option 2 includes the installation of vinyl sheet flooring and rubber wall base in offices, halls, and restrooms over existing tile flooring. Option 3 consists of providing and installing a water fountain in the garage as a replacement for the original unit. The schedule of items format provides contractors with the specific line-item breakdown necessary for submitting pricing proposals for the base work and each optional work category, enabling the Department of Agriculture Forest Service to evaluate costs for each scope component independently and make informed decisions regarding option exercising.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

soi

USDA Forest Service
SCHEDULE OF ITEMS
STOCKMORE OFFICE RENOVATIONS
Prepared by: Cathleen Christensen, Engineering Staff Officer,June 15, 2026
ITEM NUMBERDESCRIPTIONMETHOD OF MEASUNITQUANTITYPRICETOTAL
BASE BID
011900MobilizationLSQLS1
017320-1Selective DemolitionLSQLS1
081110Steel Doors and Frames and HardwareAQEA2
085313Vinyl WindowsAQEA2
085313Vinyl Window Trim Installation around Existing Windows on BuildingAQEA10
087100-1Door Hardware - Key pad with door handleAQEA1
087100-2Door Hardware - Garage Closet #2AQEA1
102800Men's and Women's Restroom Remodel WorkLSQLS1
220500Electrical WorkLSQLS1
BASE TOTAL
OPTION 1
099110-1Interior Preparation, Prime and PaintingLSQLS1
OPTION #1 SUBTOTAL
OPTION 2
096516Resilient Sheet Flooring with Rubber Wall BaseAQSF600
OPTION #2 SUBTOTAL
OPTION 3
096516Water Fountain InstallationAQEA1
OPTION #3 SUBTOTAL
BASE AND OPTIONS TOTAL

Note: Quoters must submit pricing for all line items including options. If funds allow, options will be awarded at time of intial award.

Keep at 90% of 3.05M $ 2,745,000