This is a Schedule of Items for the Stockmore Admin Site Renovation project, prepared by the USDA Forest Service Engineering Staff Officer on June 15, 2026. The solicitation (1240LT26Q0135) encompasses renovation work at the Forest Service Stockmore Building with a total budget cap of $2,745,000 (90% of $3.05M). The base bid includes nine line items: mobilization, selective demolition, installation of two steel doors with frames and hardware, installation of two vinyl windows, vinyl window trim installation around ten existing windows, installation of one keypad door handle, installation of one garage closet door hardware, complete men's and women's restroom remodeling, and electrical work. All base items are priced as lump sum quantities except the vinyl window trim installation, which is measured in units of ten.
The solicitation includes three optional work items that contractors may bid on separately: Option #1 consists of interior preparation, priming, and painting work on interior walls, ceilings, wood trim, and doors (lump sum); Option #2 includes installation of 600 square feet of luxury vinyl plank waterproof flooring with rubber wall base in offices, halls, and restrooms over existing tile (measured in square feet); and Option #3 covers provision and installation of a water fountain in the garage to replace the original fixture (measured per unit). Contractors are required to provide unit pricing for each line item, with totals calculated for the base bid and each optional work item.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C04b - SOW - SPECS - 1240LT26Q0135.pdf | ||
| C04c - Drawings - 1240LT26Q0135.pdf | ||
| C05 SF30 - P0001 - 1240LT26Q0135.pdf | ||
| C04c - Drawings - 1240LT26Q0135.pdf | ||
| C04e Past Performance Data Sheet 1240LT26Q013.docx | DOCX document | |
| C04b - SOW - SPECS - 1240LT26Q0135.pdf | ||
| C04f - WD UT20260079 - 5-18-2026 1240LT26Q0135.txt | TXT text file | |
| C04 SF1442 - 1240LT26Q0135 - Final.pdf | ||
| C04d - Experience Questionnaire 1240LT26Q0135.docx | DOCX document | |
| C04a - Schedule of Items - 1240LT26Q0135.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
soi
| USDA Forest Service |
| SCHEDULE OF ITEMS |
| STOCKMORE OFFICE RENOVATIONS |
| Prepared by: Cathleen Christensen, Engineering Staff Officer,June 15, 2026 |
| ITEM NUMBER | DESCRIPTION | METHOD OF MEAS | UNIT | QUANTITY | PRICE | TOTAL |
| BASE BID | ||||||
| 011900 | Mobilization | LSQ | LS | 1 | ||
| 017320-1 | Selective Demolition | LSQ | LS | 1 | ||
| 081110 | Steel Doors and Frames and Hardware | AQ | EA | 2 | ||
| 085313 | Vinyl Windows | AQ | EA | 2 | ||
| 085313 | Vinyl Window Trim Installation around Existing Windows on Building | AQ | EA | 10 | ||
| 087100-1 | Door Hardware - Key pad with door handle | AQ | EA | 1 | ||
| 087100-2 | Door Hardware - Garage Closet #2 | AQ | EA | 1 | ||
| 102800 | Men's and Women's Restroom Remodel Work | LSQ | LS | 1 | ||
| 220500 | Electrical Work | LSQ | LS | 1 | ||
| BASE TOTAL | ||||||
| OPTION 1 | ||||||
| 099110-1 | Interior Preparation, Prime and Painting | LSQ | LS | 1 | ||
| OPTION #1 SUBTOTAL | ||||||
| OPTION 2 | ||||||
| 096516 | LVP Waterproof Luxury Vinyl Plank Flooring | AQ | SF | 600 | ||
| OPTION #2 SUBTOTAL | ||||||
| OPTION 3 | ||||||
| 096516 | Water Fountain Installation | AQ | EA | 1 | ||
| OPTION #3 SUBTOTAL | ||||||
| BASE AND OPTIONS TOTAL |
Keep at 90% of 3.05M $ 2,745,000