This is a Schedule of Items for the Stockmore Admin Site Renovation project, prepared by the USDA Forest Service Engineering Staff Officer on June 15, 2026. The solicitation (1240LT26Q0135) encompasses renovation work at the Forest Service Stockmore Building with a total budget cap of $2,745,000 (90% of $3.05M). The base bid includes nine line items: mobilization, selective demolition, installation of two steel doors with frames and hardware, installation of two vinyl windows, vinyl window trim installation around ten existing windows, installation of one keypad door handle, installation of one garage closet door hardware, complete men's and women's restroom remodeling, and electrical work. All base items are priced as lump sum quantities except the vinyl window trim installation, which is measured in units of ten.

The solicitation includes three optional work items that contractors may bid on separately: Option #1 consists of interior preparation, priming, and painting work on interior walls, ceilings, wood trim, and doors (lump sum); Option #2 includes installation of 600 square feet of luxury vinyl plank waterproof flooring with rubber wall base in offices, halls, and restrooms over existing tile (measured in square feet); and Option #3 covers provision and installation of a water fountain in the garage to replace the original fixture (measured per unit). Contractors are required to provide unit pricing for each line item, with totals calculated for the base bid and each optional work item.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

soi

USDA Forest Service
SCHEDULE OF ITEMS
STOCKMORE OFFICE RENOVATIONS
Prepared by: Cathleen Christensen, Engineering Staff Officer,June 15, 2026
ITEM NUMBERDESCRIPTIONMETHOD OF MEASUNITQUANTITYPRICETOTAL
BASE BID
011900MobilizationLSQLS1
017320-1Selective DemolitionLSQLS1
081110Steel Doors and Frames and HardwareAQEA2
085313Vinyl WindowsAQEA2
085313Vinyl Window Trim Installation around Existing Windows on BuildingAQEA10
087100-1Door Hardware - Key pad with door handleAQEA1
087100-2Door Hardware - Garage Closet #2AQEA1
102800Men's and Women's Restroom Remodel WorkLSQLS1
220500Electrical WorkLSQLS1
BASE TOTAL
OPTION 1
099110-1Interior Preparation, Prime and PaintingLSQLS1
OPTION #1 SUBTOTAL
OPTION 2
096516LVP Waterproof Luxury Vinyl Plank FlooringAQSF600
OPTION #2 SUBTOTAL
OPTION 3
096516Water Fountain InstallationAQEA1
OPTION #3 SUBTOTAL
BASE AND OPTIONS TOTAL