C04_SOW _127EAV26Q0113.pdf
PDF 410 KB Posted
- Solicitation number
- 127EAV26Q0113
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work (SOW) for supply and installation of tiled carpet at the USDA-ARS facility located at 141 Experiment Station Road in Stoneville, Mississippi (Asset ID: 640200B001).
The contractor must supply and install approximately 2,500 square feet of carpet with approximately 720 linear feet of wall base in the Area Office, and approximately 1,970 square feet of carpet with approximately 200 linear feet of wall base in the Conference Room of Main Building #1. The specified carpet is Manufacturer J+J #3563 Essential Accent 24"x24" Tiles or approved equal, and the wall base is Flexco Wall Base #395 Storm Gray or approved equal, with installation and adhesives to be applied per manufacturer recommendations. Additionally, the contractor must provide 200 square feet of extra carpet tiles for USDA stock material and future use. For the Area Office, the vendor is responsible for moving existing furniture, removing existing carpet and wall base, and installing new materials; USDA will handle furniture disassembly and disconnecting computers and equipment. For the Conference Room, USDA will move furniture while the vendor handles carpet and wall base removal and installation. The contractor must submit a Site Safety Specific Plan/Accident Prevention Plan within 7 days of contract award, including emergency contact information. A mandatory site visit is required for all bidders prior to bid submission to confirm locations, dimensions, and existing conditions. Work hours are Monday through Friday, 7:00 A.M. to 4:00 P.M., excluding Government holidays, and the project completion deadline is not to exceed 60 days from the Notice to Proceed. The contractor must maintain a Foreman on-site at all times, keep the work area clean daily, schedule inspections a minimum of 3 days in advance in writing, and repair any damage to Government property caused by contractor activities. Prior to submitting a bid, the contractor must be registered in the System for Award Management (SAM) at www.sam.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C05_Questions_127EAV26Q0113_Carpet_Stoneville .docx | DOCX document | |
| C05_Photos_127EAV26Q0113.pdf | ||
| C05_Construction Wage Determination_127EAV26Q0113.pdf | ||
| C05_Construction Clauses and Provisions Word_127EAV26Q0113.pdf | ||
| C04_Schedule of Items_127EAV26Q0113.xlsx | XLSX spreadsheet | |
| C04_SF 1449_127EAV26Q0113.pdf | ||
| C04_Schedule of Items_127EAV26Q0113.xlsx | XLSX spreadsheet | |
| C04_Wage Determinations_127EAV26Q0113.pdf | ||
| C04_SOW _127EAV26Q0113.pdf | ||
| C04_SF 1449_127EAV26Q0113.pdf | ||
| C04_Schedule of Items_127EAV26Q0113.xlsx | XLSX spreadsheet | |
| C04_SF 1449_127EAV26Q0113.pdf | ||
| C04_Schedule of Items_127EAV26Q0113.xlsx | XLSX spreadsheet | |
| C04_Wage Determinations_127EAV26Q0113.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Supply and Install Tiled Carpet Asset ID: 640200B001
USDA-ARS
141 Experiment Station Road
Stoneville, Mississippi
Table of Contents
Location Map Page 3
Statement of Work Page 4
Contractor Responsibility Page 5
Project Schedule/Contacts Page 6
Location Map
Statement of Work: This requirement is a supply with Installation. The requirement is to remove existing and supply/install carpet in the Area Office and Conference Room in Main Building #1.
Project Objective: The objective of this project is to Supply and Install Carpet in the Area Office and Conference Room. This Project is located at USDA-ARS Main Building #1, 141 Experiment Station Road in Stoneville, MS.
Contractor must be registered in System for Award Management, (SAM), prior to submitting a bid. Registration can be obtained through: www.sam.gov
Site Visit: Bidders will attend the mandatory site visit and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing firsthand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable. This project is located at USDA-ARS in Stoneville, MS.
Safety: The contractor will submit a Site Safety Specific Plan/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 7 days of contract award. The Plan shall include phone numbers and maps to the local Dr. Office and nearest Hospital.
Base Bid: Provide all equipment, labor, and materials necessary to:
Supply and install approximately 2500 SF with approximately 720 LF of Wall Base for the Area Office and approximately 1970 SF of carpet with approximately 200 LF of Wall Base for the Conference Room.
Area Office – Vendor will be responsible for moving existing furniture, existing carpet removal, existing wall base, with new carpet and new wall base installation. USDA will be responsible for disassembly of furniture and disconnecting all computers, printers, etc.
Vendor will remove all existing rolled carpet, approximately 2500 SF, and existing wall base, approximately 720 LF.
Vendor will install new carpet, Manufacturer J + J #3563 Essential Accent 24”x24” Tiles or approved equal. Vendor will install new Flexco Wall Base #395 Storm Gray or approved equal. Installation/Adhesives shall be per manufacturer recommendations.
Conference Room – USDA will be responsible for moving all tables and chairs from Conference Room. Vendor will be responsible for removing existing rolled carpet, approximately 1970 SF and approximately 200 LF existing wall base.
Vendor will install new carpet, Manufacturer J + J #3563 Essential Accent 24”x24” Tiles or approved equal. Vendor will install new Flexco Wall Base #395 Storm Gray or approved equal. Installation/Adhesives shall be per manufacturer recommendations.
Vendor will provide an additional 200 SF Manufacturer J + J #3563 24”x24” Tiles to USDA for stock material/future use.
http://www.sam.gov/
Contractor Responsibility:
1. Contractor will verify all dimensions and site conditions prior to beginning work.
2. Contactor will take measures to protect existing walls from damage during the work.
3. Contractor will perform the work as listed in the above outlined Base Bid.
4. Contractor shall keep work area clean daily and take measures to control debris while work is being performed onsite.
5. Contractor is required to manage the project and consult with the Government prior to beginning all work phases. And, to work in a manner that minimizes the impact of the work on Government operations, research, and functions.
6. All work must be performed in such a manner as to not adversely affect daily operations of the facility, its workers, and the onsite facility operations.
7. Contractor must always have a Foreman on the job while working onsite on this project.
Material / Submittals:
The Contractor shall supply all materials necessary to successfully complete the project and deliver a functioning system as required. Submittals on all material incorporated into the work, including shop drawings and specifications, used on this project shall be submitted to the EPM and Contracting Specialist as noted in this document. Electronic submittals are acceptable otherwise three written submittals are required.
Execution of Work:
Contractor will verify all dimensions and site conditions prior to beginning work. Contractor will schedule the work between working hours as listed below. Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor. The contractor shall always be responsible for protecting his work and ensuring the safety of his crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.
Damage to Property:
Any damage to the Government buildings, walls, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government.
Inspection and Acceptance:
A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 3 days in advance, in writing, to the Contracting Officer.
Project Schedule:
The completion of this project shall not exceed 60 days from date of Notice to Proceed. A request for time extension must be submitted to the Contracting Specialist in writing. Each request must include specific and detailed reasons in support of the schedule alteration.
Work Hours:
Contractor work hours shall be Monday through Friday, seven (7) A.M. to four (4) P.M. with the exception of Government holidays. Any changes to work schedule shall be submitted to Contacting Officer for written approval prior to schedule change.
mailto:darren.middleton@usda.gov mailto:dwayne.jordan@usda.gov mailto:kevin.magee@usda.gov
| Site Visit: Bidders will attend the mandatory site visit and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing f... |
| Material / Submittals: |
| Execution of Work: |
| Damage to Property: |
| Any damage to the Government buildings, walls, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government. |
| Inspection and Acceptance: |
| Project Schedule: |
| Work Hours: |
| Project Contacts: |
| Mr. Darren Middleton, Administrative Officer |
File details come from the government source that posted it. Updated .