C04_RFQ_1240BJ26Q0011.pdf
PDF 1 MB Posted
- Solicitation number
- 1240BJ26Q0011
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Request for Quotation (RFQ) for construction services related to Irving Peak Lodgepole and Ninemile Crossing Construction on the Wenatchee River Ranger District of the Okanogan-Wenatchee National Forest in Washington State.
The Forest Service seeks construction services to upgrade undersized culverts to road bridges over Lodgepole Creek and Ninemile Creek along Forest Road 6500. Work includes construction survey and staking, erosion control and dewatering plans with fish salvage, removal and disposal of existing culverts and footings, road and channel excavation, stream channel reconstruction, installation of prestressed concrete slab bridges and precast concrete abutments, installation of prestressed concrete bulb tee bridges with cast-in-place micropiles and pile caps, roadway reconstruction and repaving, permanent traffic control features, and site restoration. The contract incorporates USDOT Federal Highway Administration Standard Specifications for Construction (FP-14). Quotations are due by 1000 Pacific Daylight Time on July 23, 2026, submitted via email to eric.oldenkamp@usda.gov. A 20% bid bond is required for quotes exceeding $150,000. The contractor must begin performance within 10 calendar days of award and complete all work by October 31, 2029. Performance and payment bonds (100% each) are required of the successful awardee. The contract period spans September 1, 2026, to October 31, 2029. Work is subject to construction wage rate requirements, environmental restrictions including a restricted work season from August 1 to October 15 (due to Northern Spotted Owl restrictions and fish in-water windows), and normal fire season limitations from July 1 to October 15. Evaluation criteria include pricing, past experience with similar bridge construction projects, and past performance. The Government anticipates one award and requires responsive quoters to submit pricing for all line items. Progress payments will be authorized monthly as work proceeds, with liquidation by deducting unliquidated amounts from each item payment.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
1167199
USDA-FS CSA NORTHWEST 7
1220 SW 3RD AVE
STE 310
PORTLAND OR 97204-2829
40BJ
All quote documents must be emailed to eric.oldenkamp@usda.gov.
An email copy of the Bid Bond is acceptable for quotes valued at $150,000 or greater.
ERIC OLDENKAMP 541-225-6321
106/23/2026
1240BJ26Q0011
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Project Name: Irving Peak Lodgepole and Ninemile Crossing Construction
Wenatchee River Ranger District, Okanogan-Wenatchee National Forest
See the Statement of Work (SOW) for a description of the project.
Amended FAR provision 52.212-1 in this solicitation identifies what must be submitted in a quote.
Solicitation number 1240BJ26Q0011 is issued as a Request for Quotation (RFQ) for Irving Peak Lodgepole and Ninemile Crossing Construction. This RFQ is prepared in accordance with the format in FAR Part 12.
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 calendar days and complete it within ________________ 1156 ______,__________ calendar days after receiving
Period of Performance
07/23/2026
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA-FS CSA NORTHWEST 7
1220 SW 3RD AVE
STE 310
PORTLAND OR 97204-2829
40BJ
ERIC J. OLDENKAMP
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 39
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
1240BJ26Q0011
Delivery Location Code: 05GG
WENATCHEE NATIONAL FOREST
215 MELODY LANE
WENATCHEE WA 98801-5933 US
Period of Performance: 09/01/2026 to 10/31/2029
0001 Lodgepole Bridge 1 LS
Product/Service Code: Y1LB
Product/Service Description: CONSTRUCTION OF
HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
0002 Ninemile Bridge 1 LS
Product/Service Code: Y1LB
Product/Service Description: CONSTRUCTION OF
HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SCHEDULE OF PAY ITEMS/SERVICES
Item Sub-Item Description
Measurement
Quantity Unit Price Total
Method Unit
1 Lodgepole Bridge
1 15101 Mobilization LSQ LS ALL
1 15201 Construction Survey and Staking, Method 1, Tolerance A LSQ LS ALL
1 15401 Contractor Testing LSQ LS ALL
1 15713 Soil Erosion & Pollution Control LSQ LS ALL
1 20302 Removal Of Existing Culvert, Disposal Method A AQ EACH 1
1 20304 Removal Of Existing Asphalt Concrete Pavement, Disposal Method A CQ SY 560
1 20407 Road Excavation CQ CY 400
1 20701 Earthwork Geosynthetic, Type 4 Long- Term Erosion Control Blanket CQ SY 1371
1 20801A Structure Excavation CQ CY 130
1 20801B Channel Excavation CQ CY 2000
1 20801C Channel Excavation CQ CY 1510
1 20803 Structural Backfill CQ CY 70
1 25101 Placed Riprap, Class 4 CQ CY 130
1 30202 Aggregate Base, Method 2 CQ TON 115
1 30205 Subbase, Method 2 CQ TON 245
1 40304 Asphalt Concrete, WSDOT, Type II CQ TON 115
1 55201 Structural Concrete, Class A(AE), Pile Cap, End Diaphragm, & Wingwalls CQ CY 23
1 55301A Precast, Prestressed Structural Concrete Member, Decked Bulb-Tee AQ EACH 1
Measurement
Quantity Unit Price Total
Method Unit
1 55301B Precast, Prestressed Structural Concrete Member, Decked Bulb-Tee W/ Curb AQ EACH 2
1 55401 Reinforcing Steel, Grade 60, Pile Cap, End Diaphragm, & Wingwalls CQ LBS 3100
1 56702 Micropile AQ EACH 10
1 56703 Micropile Load Verification Test AQ EACH 1
1 56704 Micropile Proof Load Test AQ EACH 2
1 62552 Seeding & Mulching, Dry Method LSQ LS ALL
1 63304A Sign, One Lane Bridge Panel, TYPE III, IV, IX, XI, Retroreflective Sheeting AQ EACH 2
1 63304B Sign, Speed Hump Panel, Type Iii, Iv, Ix, Xi, Retroreflective Sheeting AQ EACH 2
1 63304C Sign, 25 Mph Advisory Speed Panel, Type III, IV, IX, XI, Retroreflective Sheeting AQ EACH 2
1 63307 Object Marker, Type 3 AQ EACH 4
1 64801 Placed Streambed Simulation Material, Bed Class 2, Method A CQ CY 20
1 64803 Placed Channel Rock for Bank Margins and Rock Structures, Class Cr-0, Method A
CQ CY 45
1 62201 Equipment Rental, Hydraulic Excavator with Thumb AQ HR 64
2 Ninemile Bridge
2 15101 Mobilization LSQ LS ALL
2 15201 Construction Survey and Staking, Method 1, Tolerance A LSQ LS ALL
2 15401 Contractor Testing LSQ LS ALL
2 15713 Soil Erosion & Pollution Control LSQ LS ALL
2 20302 Removal Of Existing Culvert, Disposal Method A AQ EACH 1
2 20304 Removal Of Existing Asphalt Concrete Pavement, Disposal Method A CQ SY 1230
Quantity Unit Price Total
Method Unit
2 20407 Road Excavation CQ CY 145
2 20801A Structure Excavation CQ CY 100
2 20801B Channel Excavation CQ CY 850
2 20803 Structural Backfill CQ CY 95
2 25101 Placed Riprap, Class 3 CQ CY 145
2 27201 Geocell Abutment Stabilization, 6" Depth CQ SY 35
2 30202 Aggregate Base, Method 2 CQ TON 225
2 30205 Subbase, Method 2 CQ TON 485
2 40304 Asphalt Concrete, WSDOT, Type II CQ TON 250
2 55220A Precast Concrete Member, Grade Beam AQ EACH 2
2 55220B Precast Concrete Member, Wingwall AQ EACH 4
2 55301A Precast, Prestressed Concrete Member, 30" Slab, 80' Long AQ EACH 3
2 55301B Precast, Prestressed Concrete Member, 30" Slab, 80' Long W/ Curb AQ EACH 2
2 60202 71 Inch Span, 47 Inch Rise, Pipe Culvert, CMP Galvanized Thickness 0.109 Inch Minimum
CQ LF 42
2 62552 Seeding & Mulching, Dry Method LSQ LS ALL
2 63304A Sign, 25 Mph Curve Warning Panel, Type III, IV, IX, XI, Retroreflective Sheeting AQ EACH 2
2 63304B Sign, One Lane Bridge Panel, Type III, IV, IX, XI, Retroreflective Sheeting AQ EACH 2
2 63307 Object Marker, Type 3 AQ EACH 4
2 64801 Placed Streambed Simulation Material, Bed Class 2, Method A CQ CY 50
2 64803 Placed Channel Rock for Bank Margins and Rock Structures, Class Cr-0 Method A CQ CY 95
Quantity Unit Price Total
Method Unit
2 62201 Equipment Rental, Hydraulic Excavator with Thumb AQ HR 16
Abbreviations LS = Lump Sum LSQ = Lump Sum Quantity CY = Cubic Yard AQ = Actual Quantity SY = Square Yard CQ = Contract Quantity LF = Linear Feet
Schedule Notes:
• All offerors/quoters will be required to provide a Bid Bond (20%) with their proposal submission. Performance and Payment Bonds (100% each) will be required of the successful awardee.
• Payment for bond premiums shall be in accordance with Clause 52.232-5, Payments under
Fixed-Price Construction Contracts, and shall not be in addition to the contract price. Include bond payments under 15101 Mobilization.
Considerations:
• Normal work season: June 1 – November 15
• Restricted work season: August 1st-October 15th. Wildlife restrictions prohibit onsite work prior to August 1st due to Northern Spotted Owl (NSO). The aquatic fisheries in-water window is from July 1-September 30 but cannot begin until August 1st due to the NSO restriction. The Forest Service will not issue a stop work order. The contractor shall stop services unless a written confirmation to proceed is received from the Contracting Officer Representative (COR).
• Normal fire season: July 1 – October 15
STATEMENT OF WORK (SOW)
Irving Peak Lodgepole and Ninemile Crossing Construction
Wenatchee River Ranger District, Okanogan-Wenatchee National Forest
Statement of Requirement
The Forest Service is seeking engineering services for construction work associated with upgrading undersized culverts to road bridges over Lodgepole Creek and Ninemile Creek along the Little Wenatchee Road (Forest Road 6500).
Work on this contract is anticipated to include, but is not limited to, construction survey and staking, developing and implementing an erosion control plan and a dewatering plan to include conducting fish salvage, removing and disposing of existing culvert and footings, road and channel excavation, reconstructing a steam channel, furnishing and installing a prestressed concrete slab bridge and precast concrete abutments, furnishing and installing a prestressed concrete bulb tee bridge and cast in place micro piles and pile cap, re-grading, reconstructing and repaving of roadway approaches, supplying and installing permanent traffic control features, and restoring and re-planting the site after construction is complete.
The contractor shall furnish all labor, materials, equipment, tools, transportation, and incidental supplies necessary to perform all work described in accordance with drawings and specifications of the contract.
Project Location
The project sites are located on the Wenatchee River Ranger District of the Okanogan-Wenatchee National Forest.
To access the project area from Leavenworth, Washington, head west on US Highway 2 for approximately 15.1 miles then run north (right) on Washington State Highway 207. Follow State Highway 207 for approximately 4.4 miles then continue straight on to Lake Wenatchee Highway.
After approximately 5.3 miles, Lake Wenatchee Highway turns into White River Road. Follow White River Road for 0.8 miles then continue straight on Little Wenatchee Road. Follow Little Wenatchee Road for approximately 2.15 miles where it ends at the Forest Service Gate then the road from the gate on becomes Little Wenatchee River Road (Forest Road 6500). Follow Forest Road 6500 for approximately 6.1 miles to the junction of the 6500 and 6700 roads then continue straight on Forest Road 6500 for 1.2 miles to the junction of Forest Road 6500 and 6503.
Ninemile Creek Crossing - From the junction of the 6500 and 6503 road, continue straight on the 6500 road for approximately 0.7 miles to the Lower Ninemile Creek Crossing located around 2,280 ft in elevation in Township 27 N Range 15 E Section 4 at 47°51'46.5"N 120°58'30.5"W (47.862927, -120.975139).
Lodgepole Creek Crossing - From the junction of the 6500 and 6503 road, continue straight on the 6500 road for approximately 2.6 miles to the Lodgepole Creek Crossing located around 2,300 ft in elevation in Township 28 N Range 15 E Section 32 at 47°52'33.0"N 121°00'30.3"W (47.875845, - 121.008414).
The 6500 road is seasonally closed during the winter months with the crossings typically snow free in late May/early June. There are no known utilities within the areas, but utility line-locates are still required to verify none exist for geotechnical subsurface investigations and the final design.
Technical Specifications
The contract incorporates the USDOT, Federal Highway Administration’s Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14). The standard specifications (FP-14) are available online at: http://flh.fhwa.dot.gov/resources/specs/.
Existing Conditions
The Contractor shall verify all existing dimensions and conditions before proceeding with all work.
All dimensions shall be verified and/or determined in the field. The Contractor shall protect all improvements including existing culverts and roadway from damage during construction.
Project Control
Onsite work can begin as soon as weather permits (sites typically accessible around June 1 through October 31) but the government anticipates that field work will not begin until summer of 2027 based on lead time for materials procurement. All work must be completed no later than October 31, 2029.
Contractor is responsible for protecting workers from injury (refer to FAR 52.236-13, Accident Prevention, for full text).
The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer Representative (COR). The Government is not responsible for loss of or damage to materials or supplies stored on-site during performance of this contract.
The Forest Service is intending to award and administer a construction contract for various road repairs and road maintenance along the 6500 Road and several spur roads that originate from the 6500 road. Repairs and maintenance segments are located before, between and after the two sites associated with this contract (Lodgepole and Ninemile) and have no alternate egress options. Work at both Ninemile and Lodgepole crossings, and their corresponding staging areas, that would prohibit or hinder repairs and maintenance on the 6500 road and forest roads that are solely accessed off the 6500 road, must be coordinated with the other contractors through the COR to minimize delays and allow work to proceed. The Contractor may need to adjust work accordingly to accommodate road repairs and maintenance (ideally work on Lodgepole the same year the road repair and maintenance contract are working to avoid full closure of the 6500 and 6504 roads as there is a detour around the Lodgepole site). The Contractor should anticipate some level of minor delays for importing materials while the road repairs and road maintenance contract is in progress, or plan on some level of mitigation, such as onsite stockpiling of material.
http://flh.fhwa.dot.gov/resources/specs/
Landscape Preservation and Hazardous Materials
All heavy equipment shall be cleaned and thoroughly inspected prior to mobilization to the work site. Once on site all equipment shall be inspected daily and all visible oil, grease, and hydraulic fluid will be removed. Needed repairs will be implemented immediately before resuming work.
All machinery shall be refueled outside of riparian reserve areas or within 150 feet of the Fish Bearing Streams or any of their tributaries. If refueling does occur within riparian reserve areas, spill control measures shall be installed around the machinery prior to refueling operations.
Unless otherwise agreed, to prevent the introduction of seeds of noxious weeds onto National Forest land, Contractor shall ensure all equipment moved onto National Forest land is free of soil, seeds, vegetative matter or other debris that could contain or hold seeds. The Contractor shall employ whatever cleaning methods that are necessary to ensure compliance with this provision and shall notify the Forest Service prior to moving each piece of equipment onto National Forest land. Upon request of Forest Service, arrangements will be made for Forest Service to inspect each piece of equipment prior to being moved onto National Forest land.
The contractor shall confine operations to within the clearing limits or other areas designated in the contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the contracting officer. The contractor shall make all reasonable attempts to preserve the scenic and natural environment within and adjacent to this construction project.
Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, lakes, reservoirs, and other surface waters.
Wash water or waste from concrete, aggregate or other operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
Mechanized equipment shall not be operated in live streams without written approval by the contracting officer.
No petroleum products or other hazardous substances shall be released on or into land or rivers, streams, impoundments or other waters, or into natural or manmade channels leading thereto or therefrom. The servicing of all equipment shall be done only in the areas approved by the COR. The contractor shall transport off government lands all waste oil, vehicle oil filters (drained of free-flowing oil), and oily rags. The Contractor shall dispose of such materials in accordance with applicable State and Federal regulations.
If the total on-site oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the contractor shall prepare and implement a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer. This plan shall include notification of appropriate state and local officials, the contracting officer and other appropriate agencies.
At all on-site work areas (including contractor storage, transfer, fueling, mixing sites, etc., for oil, oil products or any hazardous materials), the contractor shall take appropriate preventive measures to insure that any release of hazardous products does not enter any stream or other waters of the United States or any of the individual States and shall conform to the federal, state and local regulations.
Planned spill containment locations in stream courses shall be established prior to commencement of work activities. These locations will be reviewed by the contracting officer or representative. When deemed appropriate, additional planned preventive measures shall be established for review by the contracting officer or representative.
The contractor, acting independently, shall immediately take action to notify the appropriate agencies including the contracting officer, and to contain and clean up, without expense to the government, all petroleum products or other hazardous substance releases which are on or in the vicinity of the project and which are caused by the contractor's employees, directly or indirectly.
The contractor shall have the necessary materials on site to contain a spill which may occur on land or within live streams as appropriate for any potential flow conditions likely to occur. This may require absorbent pads and/or booms or other containment devices. In the event the government determines that additional resources beyond those of the contractor is required, the contractor may be held liable for all damages and costs including, but not limited to additional labor, subsistence, equipment, supplies and transportation deemed necessary by the government for the containment and clean-up of petroleum products or other hazardous substance releases caused by contractor's employees or resulting from or related to construction operations.
The contractor shall notify the contracting officer of any hazardous materials to be used on the job and shall have Material Safety Data Sheets (MSDS) for those materials available on the job.
Packing and Marking
All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.
Post Award Conference
A post award conference with the awarded Contractor is required. It will be scheduled and held within 14 days after receiving acceptable performance and payment bonds. The conference will be held electronically via Microsoft Teams.
Invoice Processing Platform (IPP)
All invoices are to be submitted via the electronic Invoice Processing Platform (IPP), which can be found at https://www.ipp.gov/. The Contractor shall ensure that they have provided what is required in AGAR clause 452.232-71 paragraphs (c) and (d), which should be included as an attachment in
IPP.
Notification of Subcontracting
The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement. The Contractor and subcontractor shall fill out the SF 1413, Statement and Acknowledgement, and submit to the Contracting Officer. Subcontracting any portion of the contact shall not relieve the Prime Contractor of any responsibility under the contract.
https://www.ipp.gov/
Work Hour Limits
The contractor shall conduct activities so that interference with the public shall be kept at a minimum. Construction activity may be performed Monday through Friday and shall be limited to the hours between 7:00 a.m. and 6:00 p.m., unless other hours are approved in writing by the COR.
No work will be allowed on Federal Holidays unless approved by COR in writing. Any contractor activities requiring closure to the public shall be scheduled with the COR at least 30 calendar days prior to the closure.
Protection of Habitat of Endangered, Threatened and Sensitive Species
Location of areas needing special measures for protection of plants or animals listed as threatened or endangered under the Endangered Species Act of 1973, as amended, or as sensitive by the Regional Forester under authority of FSM 2670, are shown on the Plans and identified on the ground.
Measures that are needed to protect such areas have been included elsewhere in this contract or are as follows: In-water work is prohibited outside the in-water work window.
If protection measures prove inadequate, if other such areas are discovered, or if new species are listed as federally threatened or endangered, or as sensitive by the Regional Forester, Forest Service may either cancel or unilaterally modify this contract to provide additional protection regardless of when such facts become known. Discovery of such areas by either party shall be promptly reported to the other party.
Water Tubidity Monitoring
The contractor is responsible for water turbidity monitoring and must follow the Washington State Guidelines as listed in WA 173-201A-200. Turbidity monitoring is part of (and paid for under) the dewatering process as part of the Soil Erosion and Pollution Control. Monitoring shall take place at the start of the workday and will be conducted every 4 hours during active in-water work or downstream pumping of turbid water, project activities will be modified based on the table below.
Maximum Allowable Turbidity Levels, measured in “Nephelometric Turbidity Units” or “NTU’s are listed in Table 200 (1)(e) of that document and summarized in the Aquatic Life Turbidity Criteria in Fresh Water Table:
Actions required for Turbidity Level Measurements by NTU’s above background are listed in the table below:
Local Disposal Sites
Debris encountered in the construction (i.e., metals) and other waste materials generated in the construction (cartons, scrap, etc.) shall be removed and disposed of off National Forest Service Land, unless other disposal means are authorized in the plans or specifications.
Final Cleanup
The Contractor shall remove and dispose of all of its own trash and refuse from the contract area. Material to be removed includes, but is not limited to, camp refuse such as tin cans, aluminum foil, glass, paper, garbage, used engine oil, oil filters, oil cans, grease cartridges, etc. The Contractor shall also remove and dispose of upon completion of the road construction, all stakes, old culverts, flagging and similar debris within the project area. This cleanup is a subsidiary item for which no special payment will be made. All debris shall be disposed of off National Forest Land and in accordance with State and Local disposal requirements.
Traffic Control, Barricades, Warning Signs, and Other Devices
The contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, flaggers, pilot cars and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Barricades and other obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
All operations shall conform to the current requirements and guidelines of the Occupational Safety and Health Administration (OSHA) and the Manual of Uniform Traffic Control Devices (MUTCD).
The contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points, where the new work crosses or coincides with an existing road or trail.
Hazardous Conditions Safety Plan
The following conditions have been identified as inherently hazardous to the degree that failure to take the proper precautions could lead to serious injury or loss of life. This listing shall not be construed as all inclusive. The contractor shall provide a written job-specific hazard analysis and safety plan that addresses and conforms to the requirements of 29 CFR 1910 and 1926 and the FAR clause 52.236-13 included herein. Appropriate actions shall be taken by the contractor to implement this plan during performance and to take all necessary steps to mitigate the dangers from hazards.
Tree felling Temporary excavation / deep trenching / slope stability Fall hazard from work heights exceeding six feet Traffic control on high-volume and/or high-speed and/or limited visibility roads Heavy equipment operation Tree climbing and/or tower climbing Fire hazards Hazardous materials handling Electrical hazard Hydraulic and/or pneumatic and/or other high pressure hazards Mechanical hazards such as pulleys, springs etc.
Flooding Debris Flows
Contractor's Use of Existing Roads
The contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. The authorization is limited to roads necessary for direct access between the construction area and storage sites, disposal areas, and other work areas designated in the contract.
The roads authorized for use will be subject to the following general conditions:
1. State laws governing traffic rules and equipment requirements on State and County Highways.
2. Federal Regulations contained in 36 CFR 261.12. These regulations prohibit use in excess of State Codes for weight and size, damaging a road while using it, and blocking a road open to use by others.
The contractor shall be responsible for and perform road maintenance that is commensurate with his use of Forest Service roads in the construction area.
Road Maintenance Requirements
In order to fulfill the obligation to protect existing facilities, material source, and disposal site access roads from seasonal weather damage to safeguard soil and water quality, and to repair damage commensurate with its use, the contractor shall perform road maintenance work on these roads in accordance with the following:
1. While performing ordinary road maintenance work, the contractor shall avoid permanent fouling of gravel or bituminous surfaces through covering them with earth or debris from side ditches, slides, or other sources. The contractor shall avoid blading surface material off the surface of roads.
2. While performing all phases of construction, the contractor shall minimize damage to ditches, slopes and road surfaces. Where damage does occur, the contractor shall restore the road to its prior condition within a reasonable period of time.
3. The contractor shall remove all excess materials and debris from asphalt roadways and trails immediately after backfilling has been completed. This may require brooming and hosing down with water.
Load Limits
All vehicles and equipment shall not exceed State legal highway loads and widths or posted limits without valid State and Forest Service overload, over width permits. Forest Service overload permit applications for this project may be obtained from the COR.
Special Equipment Cleaning Requirements
All earth moving equipment (loaders, excavators, dump trucks, etc.) moved to the job site shall be cleaned of weeds and their seeds prior to each entrance onto the National Forest lands. Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. This may require the use of a pressure hose.
Equipment shall be made available for visual inspection by the Forest Service prior to entering Forest Service lands. The contractor shall advise of a proposed date for mobilization. Inspections will take place at mutually agreeable enroute locations in advance of entry onto National Forest lands.
The contractor shall take special care under this contract to prevent contamination of water at the work sites with any petroleum residues from mechanical equipment operations. This shall include daily inspection and cleaning as appropriate.
Moisture Sensitive Soils
Contractors are cautioned that the roadway structure is designed so that the completed road will support highway legal loads during a limited use season. Construction equipment often subjects the uncompleted roadway structure to loadings it is not designed to support. This is especially critical during periods of excessive moisture and will require careful selection and scheduling to permit efficient operation. Any damage resulting from operations which renders the material unsuitable for use or results in potential siltation of streams will be corrected by the contractor at its expense.
Protection of Cultural Resources
Location of known historic or prehistoric sites, buildings, objects and properties related to American history, architecture, archaeology and culture, such as settler or Indian artifacts, protected by American Antiquities Act of 1906 (16 U.S.C. 431-433), National Historic Preservation Act of 1966 (16 U.S.C. 470) and the Archaeological Resources Protection Act of 1969 (PL 96-95 and 36 CFR 261.9(e)) shall be identified on the ground by the Forest Service. Forest Service may unilaterally modify, or cancel, this contract to protect an area, object of antiquity, artifact or similar object which is, or may be, entitled to protection under these Acts regardless of when the area, object or artifact is discovered or identified. Discovery of such areas or objects by either party shall be promptly reported to the other party.
Contractor shall protect all known and identified historic or prehistoric sites, buildings, objects and properties related to American history, architecture, archaeology and culture against destructions, obliteration, removal or damage during contractor’s operations. In accordance with 36 CFR 296.14(c), the contractor shall bear costs of restoration, provided that such payment shall not relieve the contractor from civil or criminal remedies otherwise provided by law.
Wheeled or track-laying equipment shall not be operated within such areas, except on roads. Unless agreed otherwise, trees will not be felled into such areas.
Definitization of Equitable Adjustments for Change Orders
Pursuant to FAR 36.101-4(b), information regarding USDA’s definitization of equitable adjustments for change orders under construction contracts may be found at Contracting with USDA under “Federal Acquisition Regulation 36.101-4”. USDA’s procedures that apply to the definitization of equitable adjustments for change orders under construction contracts may be found in AGAR
443.304 -70.
Submittals
Submittals shall include the following unless otherwise required in the specifications:
1. Date and revision dates.
2. Project name and contract number.
3. Names of contractor, subcontractor, supplier and manufacturer.
4. Specifications section number.
5. Field dimensions and relation to adjacent structures.
6. Applicable standards such as ASTM or Federal Specifications.
7. Contractor’s stamp, initial or signature, certifying the review of submittal, verification of field measurements and compliance with contract documents.
Provide all submittals within 14 calendar days of contract award unless otherwise required by the specification.
https://www.usda.gov/about-usda/general-information/staff-offices/departmental-administration/office-contracting-and-procurement-ocp/policies-regulations
Submittal Log for Lodgepole Bridge
Log No. Incidental to Pay Item(s) Description of Submittal Type of
Submittal
Requirement found in Specification No./Drawing
Additional Specification References
1-LP 151 Weed Free Material Source Certification
Material Certification FSSS 105.02(c)
2-LP 151 Spill Prevention, Control, and Countermeasure (SPCC) Plan Plan 107.1
3-LP 151 Contractor Quality Control Plan Plan 153.02
4-LP 151 Safety Plan, including Blasting Plan where applicable Plan Accident Prevention clause [FAR 52.236-13]
5-LP 151 Fire Plan R6-FS-6300-55 Plan R6-FS-6300-52 part 2
6-LP 151 Proposed Progress Schedule R6-FS- 6300-7
Construction Schedule
Schedules for Construction Contracts
[FAR 52.236-15]
7-LP 151 Designation of Representative R6- FS-6300-6 Completed Form
Superintendence by the Contractor [FAR
52.236-6]
8-LP 151 Drug Free Workplace Policy
Establish a program, take actions, notifications and reporting as required by policy
Drug-Free Workplace
[FAR 52.223-6]
9-LP 151
SF1413 - Statement and Acknowledgement for each
Subcontractor including Owner/Operators and other Sole
Proprietorship Subcontractors [not required for material suppliers]
Completed Form Subcontracts (Labor
Standards) [FAR 52.236-11]
10-LP 151 Payroll Record WH347 Certified Payrolls submitted weekly
Copy of Certification
Payrolls and Basic Records [FAR 52.222-
8]
11-LP 154 Material Moisture/Density Testing Test Results Table 208-1 106
12-LP 154 Culvert Backfill Compaction Testing Test Results 209.11, 209.12 106
13-LP 157 Dewatering and Soil Erosion and Pollution Control Plan Plan FSSS 157.04
14-LP 157 Fish Salvage Plan Plan FSSS Appendix A / Sheet 3 of Plans 157, 648
15-LP 157 Fish Salvage Personnel Qualifications Names & Resumes FSSS Appendix A
16-LP 207 Geosynthetics: Certification Material Certification FSSS 207.08 106, 714
17-LP 302 Subbase & Base Material Certification 703.05(b), Table 703.03 302
18-LP 403 Asphalt Concrete Mix Design 403.02
19-LP 552 Structural Concrete: Mix Design Mix Design 552.03 Drawings
20-LP 552 Structural Concrete: Testing Test Results 552.2 106, Drawings
21-LP 552 Reinforcing Steel Material Certification 709.01 Drawings
22-LP 552 Miscellaneous Material: Grout Material Certification FSSS 725.19 Drawings
23-LP 552 Miscellaneous Material: Grout Product Approval FSSS 725.19 Drawings
24-LP 552 Welder Certification Copy of Certification Sheet 2 of Plans
25-LP 552 Precast Concrete Structures Shop Drawing FSSS 552.11(b)(6) 104, 554
26-LP 552 Precast Concrete Structures:
Industry Certification
Fabrication Certification FSSS 552.11(b)(6)
27-LP 552 Precast Concrete Structures: Testing Test Results FSSS 552.11(b)(6) 106, 554, 562
28-LP 552 Reinforcing Steel Order List 554.03 554, 709, Drawings
29-LP 553 Prestressed Concrete Shop Drawing 104.03 553, Drawings
30-LP 553 Prestressed Concrete: PCI Certification
Fabrication Certification FSSS 553.03
31-LP 553 Prestressed Concrete: Prestressing Method Approval 553.04 Drawings
32-LP 553 Prestressed Concrete: Materials Material Certification 553 106, 552, 554, 709, Drawings
33-LP 553 Prestressed Concrete: Testing Test Results 553.06 106, 552, Drawings
34-LP 553 Reinforcing and Prestressing Steel Material Certification 709.01, 709.02 553, Drawings
35-LP 554 Reinforcing Steel Material Certification 554.1 554, Drawings
36-LP 567 Micropile Personnel Qualifications Names & Resumes 567.03
37-LP 567 Micropile Submittals Work Plan, Equipment, & Materials
567.04 104.03
38-LP 567 Micropile Load Testing Results Test Results 567.07
39-LP 635 Traffic Control Plan Plan FSSS 156.03 635
40-LP 648 Streambed Simulation Material and Channel Rock
Written notice 5 days prior to construction
705.08
Submittal Log for Ninemile Bridge
Log No. Incidental to Pay Item(s) Description of Submittal Type of
Submittal
Requirement found in Specification No./Drawing
Additional Specification References
1-NM 151 Weed Free Material Source Certification
Material Certification FSSS 105.02(c)
2-NM 151 Spill Prevention, Control, and Countermeasure (SPCC) Plan Plan 107.1
3-NM 151 Contractor Quality Control Plan Plan 153.02
4-NM 151 Traffic Control Plan Plan FSSS 156.03 635
5-NM 151 Safety Plan, including Blasting Plan where applicable Plan Accident Prevention clause [FAR 52.236-13]
6-NM 151 Fire Plan R6-FS-6300-55 Plan R6-FS-6300-52 part 2
7-NM 151 Proposed Progress Schedule R6-FS- 6300-7
Construction Schedule
Schedules for Construction Contracts
[FAR 52.236-15]
8-NM 151 Designation of Representative R6- FS-6300-6 Completed Form
Superintendence by the Contractor [FAR
52.236-6]
9-NM 151 Drug Free Workplace Policy
Establish a program, take actions, notifications and reporting as required by policy
Drug-Free Workplace
[FAR 52.223-6]
10-NM 151
SF1413 - Statement and Acknowledgement for each
Subcontractor including Owner/Operators and other Sole
Proprietorship Subcontractors [not required for material suppliers]
Completed Form Subcontracts (Labor
Standards) [FAR 52.236-11]
11-NM 151 Payroll Record WH347 Certified Payrolls submitted weekly
Copy of Certification
Payrolls and Basic Records [FAR 52.222-
8]
12-NM 154 Material Moisture/Density Testing Test Results Table 208-1 106
13-NM 154 Culvert Backfill Compaction Testing Test Results 209.11, 209.12 106
14-NM 157 Dewatering and Soil Erosion and Pollution Control Plan Plan FSSS 157.04
15-NM 157 Fish Salvage Plan Plan FSSS Appendix A / Sheet 3 of Plans 157, 648
16-NM 157 Fish Salvage Personnel Qualifications Names & Resumes FSSS Appendix A
17-NM 207 Geosynthetics: Certification Material Certification FSSS 207.08 106, 714
18-NM 272 Geocell Abutment Stabilization Material Certification 272.06
106, Supplemental Specifications 736, Drawings
19-NM 272 Geocell: Geotextile – Class 1 Type A
Material Certification 272.06 106, 714, Drawings
20-NM 272 Geocell Material Certification
Supplemental Specifications 736.02
106, 714, Drawings
21-NM 302 Subbase & Base Material Certification 703.05(b), Table 703.03 302
22-NM 403 Asphalt Concrete Mix Design 403.02
23-NM 552 Structural Concrete: Mix Design Mix Design 552.03 Drawings
24-NM 552 Structural Concrete: Testing Test Results 552.2 106, Drawings
25-NM 552 Reinforcing Steel Material Certification 709.01 Drawings
26-NM 552 Miscellaneous Material: Grout Material Certification FSSS 725.19 Drawings
27-NM 552 Miscellaneous Material: Grout Product Approval FSSS 725.19 Drawings
28-NM 552 Welder Certification Copy of Certification Sheet 2 of Plans
29-NM 552 Precast Concrete Structures Shop Drawing FSSS 552.11(b)(6) 104, 554
30-NM 552 Precast Concrete Structures:
Industry Certification
Fabrication Certification FSSS 552.11(b)(6)
31-NM 552 Precast Concrete Structures: Testing Test Results FSSS 552.11(b)(6) 106, 554, 562
32-NM 552 Reinforcing Steel Order List 554.03 554, 709, Drawings
33-NM 553 Prestressed Concrete Shop Drawing 104.03 553, Drawings
34-NM 553 Prestressed Concrete: PCI Certification
Fabrication Certification FSSS 553.03
35-NM 553 Prestressed Concrete: Prestressing Method Approval 553.04 Drawings
36-NM 553 Prestressed Concrete: Materials Material Certification 553 106, 552, 554, 709, Drawings
37-NM 553 Prestressed Concrete: Testing Test Results 553.06 106, 552, Drawings
38-NM 553 Reinforcing and Prestressing Steel Material Certification 709.01, 709.02 553, Drawings
39-NM 554 Reinforcing Steel Material Certification 554.1 554, Drawings
40-NM 648 Streambed Simulation Material and Channel Rock
Written notice 5 days prior to t ti 705.08
Attachments
Attachment No. Attachment Name
1 C04_Attachment1_Plans_NINEMILE_CREEK
2 C04_Attachment2_SpecsNinemileCreek_FSSS
3 C04_Attachment3_Plans_LODGEPOLE_CREEK
4 C04_Attachment4_SpecsLodgepoleCreek_FSSS
5 C04_Attachment5_USFS_Lodgepole&Ninemile_GeoRpt
6 C04_Attachment6_WageDetermination
7 C04_Attachment7_CampingPermit
8 C04_Attachment8_FireProtectionSuppression
9 C04_Attachment9_Fire Plan_R6-FS-6300-55
10 C04_Attachment10_OverviewMap
11 C04_Attachment11_VicinityMap
12 C04_Attachment12_Bid_Bond_SF24
13 C04_Attachment13_Quote
(End of SOW)
CONTRACT CLAUSES
Federal Acquisition Regulation (FAR) and United States Department of Agriculture Acquisition Regulation (AGAR) Clauses and Provisions
The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation. The terms and conditions set forth herein supersede all other terms and conditions.
Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.
As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
52.252-2 Clauses Incorporated by Reference Feb 1998 This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Nov 2025) ☐ Alternate I (Nov 2025) of 52.212-4
This is a commercial construction acquisition. FAR 52.212-4 is amended as follows:
(b) Inspection/Acceptance. Inspection and Acceptance will be conducted in accordance with FAR 52.246-12, Inspection of Construction (Aug 1996).
(d) Changes. Changes will be handled in accordance with the following FAR clause(s):
☒ FAR 52.243-4, Changes (Nov 2025) ☒ FAR 52.243-5, Changes and Changed Conditions (Nov 2025)
52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.222-50 Combating Trafficking in Persons (Nov 2025)
☐ Alternate I (Nov 2025) of 52.222-50 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-3 Protest After Award (Sep 2025) 52.233-4 Applicable Law for Breach of Contract Claim (Sep 2025) 52.240-91 Security Prohibitions and Exclusions (Nov 2025)
☐ Alternate I (Nov 2025) of 52.240-91 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2025)
The following clauses are applicable if checked:
☒ 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) with Alternate I (Nov 2021) of 52.203-6 ☒ 52.204-9 Personal Identity Verification of Contractor Personnel Jan 2011 ☒ 52.204-13 System for Award Management—Maintenance (Nov 2025) ☒ 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2025) ☒ 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Sep 2025) ☒ 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Sep 2025) ☒ 52.219-6 Notice of Total Small Business Aside (Nov 2025) ☒ 52.219-8 Utilization of Small Business Concerns (Nov 2025) ☒ 52.219-14 Limitations on Subcontracting (Nov 2025) ☒ 52.222-3 Convict Labor (June 2003) ☒ 52.222-19 Child Labor—Cooperation with Authorities and Remedies (Nov 2025) ☒ 52.222-35 Equal Opportunity for Veterans (Nov 2025) ☒ 52.222-36 Equal Opportunity for Workers with Disabilities (Nov 2025) ☒ 52.222-37 Employment Reports on Veterans (Nov 2025) ☒ 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) ☒ 52.222-54 Employment Eligibility Verification (Nov 2025) ☒ 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) ☒ 52.222-90 Addressing DEI Discrimination by Federal Contractors (Apr 2026) ☒ 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (Nov 2025) ☒ 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) ☒ 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Nov 2025) ☒ 52.223-23 Sustainable Products and Services (Nov 2025) ☒ 52.232-33 Payment by Electronic Funds Transfer— System for Award Management (Oct 2018) ☒ 52.242-13 Bankruptcy (July 1995) ☒ 52.246-21 Warranty of Construction (Mar 1994)
The Contractor shall comply with the following FAR Clauses for Commercial Construction.
52.222-6 Construction Wage Rate Requirements 52.222-7 Withholding of Funds 52.222-8 Payrolls and Basic Records 52.222-9 Apprentices and Trainees 52.222-10 Compliance with Copeland Act Requirements
52.222-11 Subcontracts (Labor Standards) 52.222-12 Contract Termination-Debarment 52.222-14 Disputes Concerning Labor Standards 52.222-15 Certificate of Eligibility 52.236-5 Material and Workmanship
The following clauses are applicable when checked:
☒ 52.225-9 Buy American-Construction Materials (Nov 2025) ☒ 52.228-2 Additional Bond Security (Oct 1997) ☒ 52.228-5 Insurance-Work on Government Installation (Jan 1997) ☒ 52.228-11 Individual Surety-Pledge of Assets (Feb 2021) ☒ 52.228-14 Irrevocable Letter of Credit (Nov 2014) ☒ 52.228-15 Performance and Payment Bonds-Construction (Jun 2020) ☒ 52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee) (Feb 2021) ☒ 52.236-2 Differing Site Conditions (Jul 2025) ☒ 52.236-3 Site Investigation and Conditions Affecting the Work (Jul 2025) ☒ 52.236-6 Superintendent by the Contractor (Jul 2025) ☒ 52.236-7 Permits and Responsibilities (Jul 2025) ☒ 52.236-8 Other Contracts (Jul 2025) ☒ 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Jul 2025) ☒ 52.336-10 Operations and Storage Areas (Jul 2025) ☒ 52.236-11 Use and Possession Prior to Completion (Jul 2025) ☒ 52.236-12 Cleaning Up (Jul 2025) ☒ 52.236-13 Accident Prevention (Jul 2025) ☒ 52.236-15 Schedules for Construction Contracts (Jul 2025) ☒ 52.236-16 Quantity Surveys (Jul 2025) ☒ 52.236-17 Layout of Work (Jul 2025) ☒ 52.236-21 Specifications and Drawings for Construction (Jul 2025) ☐ Alternate I (Apr 1984) of 52.236-21 ☐ Alternate II (Apr 1984) of 52.236-21 ☒ 52.242-14 Suspension of Work (Apr 1984) ☒ 52.248-3 Value Engineering (Oct 2025) ☐ Alternate I (Apr 1984) of 52.248-3
AGAR Clauses
452.203-71 Anti-Discrimination and Diversity, Equity, and Inclusion (DEI) Compliance (Dec 2025)
(a) By entering into this contract, the contractor certifies that:
(1) It is compliant with all applicable Federal anti-discrimination laws and the Equal Protection principles of the U.S. Constitution, and it will remain compliant for the duration of the contract.
(2) Neither…
This is the start of the file's text. The full file is on GovTribe.