C04_Attachment9_Fire Plan_R6-FS-6300-55.pdf
PDF 78 KB Posted
- Solicitation number
- 1240BJ26Q0011
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Fire Plan form (R6-FS-6300-55) used by the USDA Forest Service Region 6 in conjunction with related contracting forms (R6-FS-6300-52, R6-FS-6300-53, and R6-FS-6300-54) for federal forest service contracts.
The document establishes fire prevention and suppression responsibilities and procedures for contractors working in Forest Service project areas. The contractor is required to take all reasonable and practical action to prevent and suppress fires within the project area, with suppression action to commence immediately upon discovery of or awareness of any fire. The plan identifies key personnel including the contractor's fire matters representative, the Contracting Officer's Representative, and Forest Service inspector(s), along with their contact information. The contractor must designate one or more fireguards responsible for fire detection and suppression. The form specifies whether employees may smoke in the project area and whether open fires are permitted, both requiring written authorization from the Contracting Officer's Representative if allowed. Fire reporting procedures are documented with designated Forest Service employee contacts. The Forest Service retains the authority to counsel the contractor on suppression actions and may supplement contractor efforts or assume control of fire suppression operations if a fire is not suppressed by the contractor and requires appreciable reinforcements. The plan includes sections for identifying contractor employees with firefighting qualifications and special fire assignments, available equipment by description and type, and the total number of employees capable of performing firefighting duties. The document requires joint signature by both the contractor and Contracting Officer's Representative upon completion.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Contractor Number
Project Name Contract Performance Period
Contractor’s Representative for Fire Matters
Telephone Number Name Title Office Residence
Contracting Officer’s Representative
Telephone Number Name Title Office Residence
Forest Service Inspector(s)
Telephone Number Name Title Office Residence
Action by Contractor
The Contractor shall take all reasonable and practical action to prevent and suppress fires in the project area. The Contractor shall take suppression action immediately upon discovery of or becoming aware of such fires.
R6-FS-6300-55 (04/01)
USDA Forest Service – Region 6
FIRE PLAN
(For use with Forms R6-FS-6300-52) R6-FS-6300-53 and R6-FS-6300-54
Action by Forest Service
The Forest Service may counsel with the Contractor on suppression action and will, when necessary, supplement the Contractor’s efforts by furnishing personnel and equipment not available to the Contractor. In the event that a fire is not suppressed by the Contractor and will require appreciable reinforcements, the Forest Service may take over suppression of the fire and may employ the Contractor’s personnel and equipment.
Fire Prevention and Suppression
Predicted fire precautions class may be obtained from the following local sources:
The Contractor has employed or designated the following named individual(s) as fireguard, whose duty is the detection and suppression of fires.
Telephone Number Name Title Office Residence
Contractor will [ ], will not [ ], permit employees to smoke while in the project area. Open fires will [ ], will not [ ], be permitted by the Contractor. Although these activities may be permitted by the contractor, it is understood that neither shall be allowed without being authorized in writing by the Contracting Officer’s Representative.
Fires shall be reported to one of the following Forest Service employees:
Telephone Number Name Address or Location Office Residence
Contractor’s Employees Processing Special Fires Qualifications
Best Fire Other Name Assignment Qualifications
Total number of employees who could perform firefighting duties
Description, Type, Number Make, Model, Size
Joint Preparation of this fire plan is acknowledged:
Contractor or Designated Representative Contracting Officer’s Representative
Date Date
| Attachment 2 - Project Specifications.pdf |
| Preface |
| 101 - Terms¸ Format¸ and Definitions |
| 101.01 Meaning of Terms. |
| 101.03 Abbreviations. |
| 101.04 Definitions. |
| 102 - Bid¸ Award¸ and Execution of Contract |
| Delete Section 102. |
| 103 - Scope of Work |
| Delete Subsections 103.02, 103.03, 103.04, 103.05. |
| 104 - Control of Work |
| Delete Subsections 104.01, 104.02, 104.04. |
| 104.06 Use of Roads by Contractor. |
| 105 - Control of Material |
| 105.02(c) Contractor-located sources. |
| 106 - Acceptance of Work |
| 106.01 Conformity with Contract Requirements. |
| 106.02 Visual Inspection. |
| 107 - Legal Relations and Responsibility to the Public |
| 107.02 Protection and Restoration of Property and Landscape. |
| Delete Subsection 107.05. |
| 108 - Prosecution and Progress |
| Delete Section 108. |
| 109 - Measurement and Payment |
| Delete Subsections 109.06, 109.07, 109.08, 109.09. |
| 109.01 Measurement of Work. |
| 109.02 Measurement Terms and Definitions. |
| 152 - Construction Survey and Staking |
| 152.04 General. |
| 152.05 Survey and Staking Requirements. |
| Table 152-1 Construction Survey and Staking Tolerances |
| 155 - Schedules for Construction Contracts |
| Delete Section 155. |
| 156 - Public Traffic |
| Section 156. – PUBLIC TRAFFIC |
| 157 - Soil Erosion and Sediment Control |
| 157.04 General. |
| 201 - Clearing and Grubbing |
| Section 201. — CLEARING AND GRUBBING |
| 201.01 Description |
| 201.04 Clearing |
| 201.06 Disposal. |
| 202 - Additional Clearing and Grubbing |
| Section 202. — ADDITIONAL CLEARING AND GRUBBING |
| 203 - Removal of Structures and Obstructions |
| 203.05 Disposing of Material. |
| 204 - Excavation and Embankment |
| Section 204. — EXCAVATION AND EMBANKMENT |
| 301 - Untreated Aggregate Courses |
| 301.03 General. |
| 301.05 Compacting. |
| 633 - Permanent Traffic Control |
| 633.02 Material. |
| 633.03 General. |
| 633.05 (a) Fabrication. |
| 703 - Aggregate |
| 703.05 Subbase, Base, Surface Course, and Screened Aggregate. |
| 704 - Soil |
| 704.03 Backfill Material. |
| 6330-1000 – Precast Concrete Vaulted Toilet |
| 6330-1000.01 Work |
| 6330-1000.02 Materials |
| 6330-1000.03 Construction |
| 6330-1000.04 Existing Concrete Vault Toilets along Scenic Highway |
| 6330-1000.05 Measurement |
| 6330-1000.06 Payment |
| 64603-0800 – FIXTURE, KIOSK |
| 64603-0800.01 Work |
| 64603-0800.02 Materials |
| 64603-0800.03 Construction |
| 64603-0800.04 Measurement |
| 64603-0800.05 Payment |
File details come from the government source that posted it. Updated .