About this file

This is a Quality Assurance Surveillance Plan (QASP) template for the Zigzag Recreation Residence Road and Culvert Survey contract (Solicitation/Contract Number 1170048) under the USDA Forest Service. The QASP establishes procedures and guidelines for monitoring contractor performance against the requirements outlined in the associated Performance Work Statement (PWS). The document defines roles and responsibilities, with the Contracting Officer (CO) responsible for contract administration and cost control, while the Contracting Officer Representative (COR) executes day-to-day surveillance activities, monitors compliance, and prepares discrepancy reports. The contractor is responsible for delivering products and services in accordance with contract specifications and maintaining a Quality Control Plan (QCP) that complements the government's QASP.

Performance monitoring employs surveillance methods including random inspection and periodic monitoring to assess contractor compliance with established performance standards and Acceptable Quality Levels (AQLs). The COR evaluates contractor performance across four categories: Outstanding Performance (exceeds standards with no deficiencies), Satisfactory Performance (meets standards with no significant deficiencies), Marginal Performance (fails to meet some standards), and Unsatisfactory Performance (fails to meet most or all standards). Surveillance intensity may be adjusted based on performance trends—reduced for sustained excellent performance or increased for consistent deficiencies. The document includes example templates for Performance Requirement Summaries, Discrepancy Reports, Quality Assurance Monitoring forms, and Surveillance Activity Checklists that the CO must customize and attach to the final QASP for contract administration purposes.

View the file

Other files

File Type Posted
C02_Streamlined AP_ZZRR Survey.docx DOCX document
C05_SOI_ZZRR Survey.pdf PDF
C03_PWS-ZigzagRecSurvey.docx DOCX document
C08_WageDetermination1977-0079.pdf PDF
C06_VicinityMap_ZZRRSurvey-Culverts.pdf PDF
C01_LMIRBPACall_ZZRR Survey.pdf PDF
C01_LMIRBPACall_ZZRR Survey.doc DOC document
C07_EvaluationCritieria_ZZRRSurvey.docx DOCX document
C00_1240BG26Q0061.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Quality Assurance Surveillance Plan

Contents

Project Name3
Solicitation / Contract Number3
Section 1: Introduction3
1.1Purpose3
1.2QASP Relation to the Contract3
1.2.1QASP Revisions3
1.2.2Surveillance of Performance Progression3
1.3QASP Relation to the Quality Control Plan (QCP)3
Section 2: Performance Description3
2.1Performance Standards and Acceptable Quality Levels (AQLs)3
2.1.1Allowable Deviation4
2.1.2Substantially Complete4
2.2Non-Performance4
2.2.1Documentation4
2.2.2Remedial Actions4
Section 3: Contractor and Government Responsibilities4
3.1Contractor Responsibility4
3.2Government Responsibility5
3.2.1Contracting Officer (CO)5
3.2.2Contracting Officer Representative (COR)5
Section 4: Surveillance Methods to Perform Quality Assurance5
4.1Surveillance Methods5
4.2Analysis and Results5
Appendix A: Example Performance Requirement Summaries8
Appendix B: Example Discrepancy Report9
Appendix C: Example Quality Assurance Monitoring10
Appendix D: Example Surveillance Activity Checklist11

Project Name Zigzag Recreation Residence Road and Culvert Survey

Solicitation / Contract Number 1170048

Section 1: Introduction This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Zigzag Recreation Residence Road and Culvert Survey. This plan sets forth the procedures and guidelines that the USDA, Forest Service will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in the PWS. This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.

1.2 QASP Relation to the Contract

1.2.1 QASP Revisions

The Contracting Officer Representative (COR) may make revisions or changes to the QASP procedures and surveillance methods or increase or decrease the degree of surveillance methods at any time during the contract performance period. Changes to the Metric must be incorporated into the PWS, Performance Requirement Summary (PRS) and QASP by a bilateral modification to contract that is issued by the Contracting Officer (CO). A copy of the QASP is provided to the contractor to enable the contractor to enhance its Quality Control (QC) program to perform in accordance with its Quality Control Plan (QCP).

1.2.2 Surveillance of Performance Progression

As the performance period progresses, the levels of surveillance may be altered for service areas where performance is either consistently excellent or unsatisfactory. If consistently good performance, then the amount of surveillance may be reduced. If observations reveal consistent deficiencies, increased surveillance may be implemented.

1.3 QASP Relation to the Quality Control Plan (QCP)

The QCP is a required element of contract and the Contractor shall adhere to its established quality control processes and procedures in managing and performing work as described in the contract. While the QCP represents the way in which the Contractor will ensure its quality and timeliness of services, as defined in the PWS, the QASP represents the way in which the Government personnel specified in Section 3: Contractor and Government Responsibilities, Paragraph 3.2, Government Responsibilities will evaluate the contractor’s performance. The contractor’s QC program and the residual organization’s QASP should be complementary programs that ensure successful contractor performance.

Section 2: Performance Description Performance of the contractor will be monitored through the surveillance methods described in Section 4: Surveillance Methods to Perform Quality Assurance to assess the Contractor’s performance against PWS requirements.

2.1 Performance Standards and Acceptable Quality Levels (AQLs) For selected activities in the PWS, the PRS provides a performance standard and an AQL. A performance standard is the expected level of contractor performance. An AQL defines the level of performance that is satisfactory. Depending on the service evaluated and the evaluation method selected, performance standards and AQLs may be stated as a number of occurrences or as a percentage. Performance standards and AQLs for random sampling and 100 percent inspection are generally stated as percentages. For periodic inspections, performance standards may be stated as either percentages or as absolute numbers.

The contract requires the Contractor to perform all work as specified. Any inaccuracies or omissions in services or products are referred to as “defects” on the part of the Contractor. The Contractor shall be responsible for all identified defects and may be required to perform the work at no cost to the government. The AQLs take into account that in some instances an allowable level of deficiencies (deviations) is possible while overall performance continues to meet the government’s desired level of service.

2.1.1 Allowable Deviation

The AQLs define the level or number of performance deficiencies the Contractor is permitted to reach under this contract. AQLs take into account the difference between an occasional defect and a gross number of defects. AQLs can be expressed as a percentage of or as an absolute number (e.g., three per month). There may be instances where 100 percent compliance is required, and no deviation is acceptable (e.g., where safety is involved).

2.1.2 Substantially Complete

In some cases, service outputs are evaluated using subjective values (e.g., excellent, satisfactory, unsatisfactory). The criteria for acceptable performance and for defects must be defined for these service outputs. The concept of “substantially complete” should be the basis for inspections based on subjective scales. Work is considered “substantially complete” where there has been no significant departure from the terms of the contract and no omission of essential work. In addition, the Contractor has performed the work required to the best of its ability and the only variance consists of minor omissions or deficiencies.

2.2 Non-Performance

Non-performance occurs when the contractor’s performance does not meet the AQL for a given requirement. Requirements may contain multiple performance elements, and therefore, deficiencies may occur in one or more aspects of performance (e.g., timeliness, accuracy, completeness, etc.) or subject areas of effort.

When surveillance indicates that the contractor's service output is not in compliance with the contract requirements, the Contracting Officer’s Representative (COR) must determine whether the Contractor or the Government caused the deficiency. If the cause of the defect rests with the Government, corrective action must be taken through Government channels. If the cause of the defect is due to action or inaction by the contractor, the contractor is responsible for correction of the problem at no additional expense to the Government.

2.2.1 Documentation

Documentation of work non-performed or unacceptable work is essential for tracking Contractor performance. The COR will document deficient work by compiling facts describing the inspection methods and results and to substantiate nonconformance with the contract. The documentation, with any recommendations, will be forwarded to the CO. In the case of the Contractor, the COR will decide whether to elevate the problem to the CO for corrective action.

2.2.2 Remedial Actions

The Federal Acquisition Regulation allows for penalties in the event that the Contractor fails to perform the required services. Penalties are defined as those actions taken under the direction of the CO against the contractor within the general provisions of the contract for nonconformance to the PWS and PRS.

Section 3: Contractor and Government Responsibilities

3.1 Contractor Responsibility

The Contractor is responsible for delivering products or services in accordance with the contract. Implementing its QCP, which describes the Contractor’s methods for ensuring all products and services under the contract meet established performance standards and AQLs. Maintaining, and providing for audit, quality control records and reports and all records associated with the investigation and complaint resolutions. Appointing a single quality control point-of-contact to act as a central recipient of communication from the COR or CO.

3.2 Government Responsibility

3.2.1 Contracting Officer (CO)

The CO is responsible for administering and monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by COR and the contractor’s performance. The CO may delegate various day-to-day contract administration duties to a Administering ACO (ACO) and/or the COR for performance management and administrative actions such as invoice approval and issuance of Contract Discrepancy Reports may be, and normally are, delegated by the CO to the COR. The CO shall approve any revisions to the QASP processes or standards.

3.2.2 Contracting Officer Representative (COR)

The COR, is designated in writing, by the CO. The COR will ensure that the QA function is properly executed, plays a key role in contract administration and performs the contract surveillance and monitoring. Some key contract administration duties include, but are not limited to, performs surveillance as required by this QASP; make recommendations to the CO for issuance of Contract Discrepancy Reports or letters of commendation and acceptance or rejection of completed work and for administrative actions based on unsatisfactory or non-performed work, and revisions or changes to the QASP; and assists the CO in identifying necessary contract modifications and preparing reports of Contractor performance and cost.

The COR may use the form(s) included in the Appendices to perform the inspection or other forms as approved by the CO. The Contractor overall guidance is also provided by FAR clause 52.246-4 in Section 52 of the contract.

Section 4: Surveillance Methods to Perform Quality Assurance

4.1 Surveillance Methods

The surveillance methods used in the QA process are the Government’s tools to monitor the Contractor’s products and services. The best means of determining whether the Contractor has met all contract requirements is to inspect the Contractor’s service products and analyze the results. Further, documented inspection results are an effective tool in contract administration that can confirm the successful achievement of all performance requirements or highlight areas where defects exist and improvements are necessary.

The COR may request progress reports to monitor the Contractor’s performance and schedule.

4.1.1 Random Inspection

The Government may conduct random monitoring by reviewing information/reports required and submitted in accordance with the contract. The random monitoring shall be performed by the COR.

4.2 Analysis and Results

When the inspections and validations have been completed, the COR will perform an analysis of the Contractor’s performance. The purpose of the analysis is to ensure Government is receiving high-quality products and services from the Contractor. The COR will review the results, rate the Contractor’s compliance with the performance standards and AQLs, and characterize the Contractor’s overall performance. Analysis of all types of contract monitoring will result in one of the following outcomes:

4.2.1 Outstanding Performance

Outstanding performance is the result of the Contractor substantially exceeding the performance standards with significant achievements and no significant deficiencies. The Government may reduce its level of surveillance when the COR determines that the Contractor provides sustained performance that significantly exceeds the requirements with no significant deficiencies.

4.2.2 Satisfactory

Satisfactory performance is the result of the Contractor meeting the performance standards with no significant deficiencies. The Government may reduce its level of surveillance when the COR determines that the Contractor provides sustained performance that satisfies the requirements with no significant deficiencies.

4.2.3 Marginal

Marginal performance is the result of the Contractor failing to meet some of the performance standards. This may require Government intervention or corrective action to prevent further issues. The Government may increase its level of surveillance when the COR determines that the Contractor lacks sustained performance that satisfies the requirements.

4.2.4 Unsatisfactory

Unsatisfactory performance is the result of the Contractor failing to meet most or all of the performance standards. This may require Government intervention or corrective action to prevent further issues. The Government may increase its level of surveillance when the COR determines that the Contractor does not demonstrate performance that satisfies the requirements.

[THIS PAGE IS FOR INFORMATIONAL PURPOSES]

The Contacting Officer must include as attachments or exhibits the appropriate performance requirement summary, forms, checklists, etc. in the QASP that will be used during surveillance / monitoring for the applicable contract.

Appendix A: Example Performance Requirement Summaries

PERFORMANCE REQUIREMENT SUMMARY

Performance Task (PWS Reference)

Performance Indicator

Performance Standard

Acceptable Quality Level (AQL)

Method of Surveillance

1.1
Work shall be performed IAW the PWS, the terms of the contract, and all applicable federal, state, and local laws and regulations.
Delivery matches services and delivery description with no discrepancies.
No variances allowed. 100% services performed as required by the contract.
Periodic and/or random inspections by the COR or Government Technical Monitor (GTM). The Government has the right to change or modify inspection methods at its discretion

Appendix B: Example Discrepancy Report

DISCREPANCY REPORT
1. DISCREPENCY REPORT NO.
2. TO: (Contractor / Project Manager Name)
3. FROM: (Name of COR)

CONTRACT NUMBER: DATE:

PREPARED
ORAL NOTIFICATION
RETURNED BY CONTRACTOR
ACTION COMPLETE

4. DISCREPENCY OR PROBLEM (Describe in Detail. Include PWS references. Attach Continuation Sheet if Necessary)

5. SIGNATURE OF COR

6. TO: (Name of COR)
7. FROM: (Contractor / Project Manager)

8. CONTRACTOR RESPONSE AS TO CAUSE, EFFECT, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE (Attach Continuation Sheet if necessary. Cite applicable Contractor QC program procedures or new QC procedures)

9. SIGNATURE OF CONTRACTOR REPRESENTIVE
10. DATE

11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, or rejection. Attach Coordination Sheet if necessary)

12. GOVERNMENT ACTIONS (Cure notice, show cause, other)

CLOSE OUT

KTR NOTIFIED

NAME AND TITLE
SIGNATURE
DATE

COR

Appendix C: Example Quality Assurance Monitoring

CONTRACT NUMBER: ______________________________________

SERVICE or STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check the applicable item):

Random Sampling 100% Inspection Periodic Inspection Customer Complaint LEVEL OF SURVEILLANCE (Check the applicable item):

MonthlyQuarterlyAs needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD:______ %

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: ______% Service Provider’s Performance (Check the applicable item):

Meets Standards Does Not Meet Standards Narrative of Performance During Survey Period:

Prepared By: _______________________________ Date: ______________

Appendix D: Example Surveillance Activity Checklist The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.

Performance Requirement Performance Standard Method of Measurement

Performance Metrics Method of Surveillance Date Accomplished Compliance (Exceed, Met, Partial Met) image1.png