About this file

This is a Land Management Integrated Resources BPA Call Order (RFQ) for topographic and site surveying services. The USDA Forest Service is issuing a competitive call order against the LMIR BPA to secure surveying services for National Forest Service roads and culvert sites in the Zigzag Recreation Residence area of Mount Hood National Forest in Oregon. The call is restricted to current LMIR BPA award holders only, with an issue date of June 23, 2026, and a due date of July 13, 2026 at 12:00 PM PST. The period of performance extends from the date of award through November 30, 2026, with work to commence within seven calendar days of receiving the notice to proceed. This is designated as a single award call order; contractors must provide pricing for the complete scope of work listed as one line item: "Completed Site and Topographical Surveys" on a lump sum (LS) basis.

The scope requires contractors to perform record searches, locate utilities, and conduct topographic and site plan surveys for four National Forest Service roads (NFSR 2612000, 2620000, 2629905, and 2629909) and associated culvert sites. Deliverables include site survey data capturing traveled way boundaries, utilities, vegetation, structures, topographic features, and stream information, with electronic copies provided in AutoCAD Civil 3D format. A Professional Land Surveyor licensed in Oregon must lead the work and establish survey control, develop topographic base maps, and provide survey control drawings as part of the construction documents. The survey extents are 15 feet from the edge of the traveled way for most roads and 50 feet from the centerline of culverts extending 75 feet upstream and downstream. Evaluation criteria include a pass/fail technical capability statement addressing timeline, personnel, deliverables, and survey experience, followed by lowest price selection among acceptable quotes. The Contracting Officer's Representative is Justin Houck (971-469-5533), and a post-award conference will be scheduled within 14 days of award via Microsoft Teams.

View the file

Other files

File Type Posted
C02_Streamlined AP_ZZRR Survey.docx DOCX document
C05_SOI_ZZRR Survey.pdf PDF
C03_PWS-ZigzagRecSurvey.docx DOCX document
C04_QASP_ZZRRSurvey.docx DOCX document
C08_WageDetermination1977-0079.pdf PDF
C00_1240BG26Q0061.pdf PDF
C06_VicinityMap_ZZRRSurvey-Culverts.pdf PDF
C01_LMIRBPACall_ZZRR Survey.pdf PDF
C07_EvaluationCritieria_ZZRRSurvey.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Land Management Integrated Resources BPA Call

Issue Date:

06/23/2026 Due Date/Time:

07/13/2026 1200PM PST

Contractor:

BPA No.

12363N2__A4_____
Project Name
Zigzag Recreation Residence Road and Culvert Survey

BPA RFQ or

Call No.

1240BG26Q0061____
Location
Zigzag, OR
Set-Aside
Small Business____ Unrestricted_____

This will only be sent out to the current BPA Award Holders as of Issue Date.

Contractor:
Confirm business size by NAICS code below: Small___ Large___ Initial:______

NAICS Code Exception if Applicable:

Award Information
______This is a single award call order. Contractor must provide pricing for all items listed under Box 20.

______This is a multi-award call order. Contractor needs to only provide pricing for all items listed under the specific award(s) they are interested in.

Contractor:

UEI:

Email:

Issuing and Billing Office:

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

NAICS Code (per Scope of Work)
21.

ESTIMATED QUANTITY

22.

UNIT OF MEASURE

23.

UNIT PRICE

24.

AMOUNT

$
$
1
COMPLETED SITE AND TOPOGRAPHICAL SURVEYS
1
LS
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Remarks: All clauses and provisions in the base BPA award are applicable to call orders, however clauses and/or provisions in BPA Call Orders take precedence. See Attachments for additional terms and conditions. The Period of Performance for this Call Order is from the Date of Award through 11/30/2026. Specific item due dates or deliverable due dates are mandatory, not arbitrary, and must be met accordingly, regardless of the final period of performance date.
Total Price:

Contractor: (Name, Signature, and Date)

Date:

Requested By: (Name and Signature)

COR: Justin Houck

Ordered By: (Name and Signature)

Contracting Officer

1. DESCRIPTION/STATEMENT OF WORK

The scope of this project includes performing record search, locating utilities and performing a topographic and site plan survey for the project roads and culvert sites. Site survey work shall capture contextual information that is relevant to planning and design such as traveled way boundaries, overhead and underground utilities, adjacent trees and vegetation, adjacent man-made structures or improvements (driveways, culverts, bridges, signs, etc.), adjacent topographic features, upstream and downstream bank widths, existing inverts of culverts, centerline of stream flow and depth of streambed relative to the surrounding grade.

Electronic copies of the base mapping shall be provided to the Government in the current Forest Service version of AutoCAD Civil 3D format with supporting base files. The Contractor shall perform their due diligence in reviewing existing record drawings and other sources in determining locations of existing features, as well as underground utilities. The Contractor shall investigate the information shown on any Government furnished drawings, record drawings and other planning documents which are part of this contract. Surveys as outlined in the following sections will be completed by the Contractor.

The Contractor shall complete a site plan and topographical survey that identifies physical site features and existing site conditions for the National Forest Services Roads and culvert sites listed in Performance Work Statement (PWS) Sections 2.0 Purpose and 4.0 Place of Performance. Detailed technical requirements are stated in PWS Section 17.0 Specific Tasks.

The Contractor shall provide services in accordance with (IAW) and the PWS, and all applicable federal, state and local laws and regulations.

2. SPECIFICATIONS:

2.1 Key Personnel and Required Qualifications or Certifications The Contractor shall utilize a Professional Land Surveyor, licensed in the State of Oregon, to develop and provide topographical and site plan data. The Professional Land Surveyor is responsible for developing/establishing survey control (horizontal basis of bearing and vertical datum), completing the design survey, developing topographic base maps, and providing survey control drawings meeting Government requirements as part of the construction documents plan set, among other deliverables outlined in the following sections of this document.

3. PROJECT LOCATION AND DESCRIPTION

Work will take place on NFSR 2612000, 2620000, 2629905 and 2629909. Table 3.1 contains details pertaining to the National Forest Service Roads to be surveyed. See below for directions to the project roads.

· Directions from Zigzag Ranger Station to 2612000 – Turn right onto US-26 E. Continue for 1.3 miles, then turn right onto Still Creek Road (NFSR 2612000) and drive straight for 0.30 miles.

· Directions from Zigzag Ranger Station to 2620000 – Turn right onto US-26 E. Continue for 2.1 miles, then turn right onto Road 20 (NFSR 2620000).

· Directions from Zigzag Ranger Station to 2629909 – Turn right onto US-26 E. Continue for 5.7 miles, then turn left onto Road 35. At the intersection, turn left to continue on Road 35 and drive for 0.3 miles. At the intersection, NFSR 2629905 (Road 35B) begins on the right.

· Directions from Zigzag Ranger Station to 2629909 – Turn right onto US-26 E. Continue for 5.7 miles, then turn left onto Road 35. At the intersection, turn left to continue on Road 35 and drive for 0.3 miles. Turn right onto NFSR 2629905 (Road 35B) and continue for 500 feet. At the intersection, NFSR 2629909 (Road 35A) begins on the right.

Table 3.1 – National Forest Service Road Details

National Forest Service Road Number
National Forest Service Road Name
Begin Survey

(Milepost) End Survey

(Milepost)

2612000*
Still Creek Road*
0.83*
0.83*
2612000*
Still Creek Road*
2.39*
2.39*
2612000*
Still Creek Road*
2.71*
2.71*
2620000
Road 20
0.00
1.07
2629905
Road 35B
0.00
0.46
2629905*
Road 35B*
0.13*
0.13*
2629909
Road 35A
0.00
0.91

*Designates a culvert site to be surveyed.

Extents of the survey being performed on each NFSR described shall be 15’ from the edge of the traveled way for NFSR 262000, 2629905 and 2629909. Extents of the survey being performed at each culvert site shall be 50’ from the centerline of each culvert, and extend 75’ upstream from the inlet and 75’ downstream from the outlet.

4. INSPECTION AND ACCEPTANCE:

4.1

FAR 52.246-4: INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

a. Definition. “Services”, as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

b. The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

c. The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

d. If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

e. If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may—

1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

2) Reduce the contract price to reflect the reduced value of the services performed.

f. If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may—

1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or

2) Terminate the contract for default.

4.2

CONTRACTOR INSPECTION PROCEDURES

(A) General Instructions

1) The Contractor shall conduct inspections of i.e., treatment units and record the results using procedures described herein. Inspections shall be maintained concurrent with contract work. Completed inspection forms shall be made available to the Government within 24 hours of completion of each i.e., treatment unit and will remain part of the permanent contract file.

2) By submission of inspection forms to the Government, the Contractor is considered to be certifying that the unit is satisfactorily completed and that the inspection forms reflect the work accomplished.

3) The Contractor shall submit legible inspection forms. Illegible and incomplete forms shall be returned to the Contractor for correction and re-submission.

4) In the event the Contractor falsifies inspection results, as determined by the Contracting Officer, the Government may declare the Contractor to be in default of the contract. Additionally, the Government may refer such falsifications to the US Attorney’s Office for possible prosecution pursuant to 18 U.S.C. 1001 (Falsification of Government Documents) or 18 U.S.C. 287 (Fraud).

4.3

GOVERNMENT INSPECTION PROCEDURES – COMPLIANCE INSPECTION:

Refer to the Quality Assurance Surveillance Plan (QASP) for Government inspection procedures and Contractor compliance requirements.

5. COMMENCEMENT PROSECUTION, AND COMPLETION OF WORK

The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 11/30/2026.

6. POST AWARD CONFERENCE

A post award conference with the successful offeror is required. It will be scheduled within 14 days after the date of contract award. The conference will be held via Microsoft Teams.

7.

EVALUATION CRITERIA:

Contractor must send a technical capability statement briefly explaining:

How they intend to complete this contract as far as time frame, personnel, and deliverables as well as explaining experience in survey work. Include relevant past performance information.

The Government will consider the relevance of past performance information obtained in relation to the scope of this procurement with respect to both similar efforts, and the length, scope, number, complexity, and diversity of contracts completed by the firm. Past performance, either positive or negative, which is considered by the Government to be more closely related to the scope of this effort will be given additional weight in the evaluation process.

Government evaluators may avail themselves of various federal, state, and local past performance databases. The Government may research offeror performance on any federal, state, local, and commercial contract performance of the offeror that is known to the Government, but not included on the submitted performance information. Additionally, the personal experience and evaluator knowledge of offeror performance may be utilized.

Quotes will be evaluated in two steps:

· Step 1: Quotes will be reviewed initially under a Pass/Fail evaluation to determine if the Technical Capability meets requirements of the call order. Quotes must be signed. Those that do not meet the requirements will be marked unresponsive. Acceptable quotes will then be evaluated under Step 2.

· Step 2: Lowest Price with an acceptable quote will receive the award 8.

CONTRACTING OFFICER’S REPRESENTATIVE:

Name:
Justin Houck
Address:
16400 Champion Way, Sandy, OR 97055
Telephone:
971-469-5533

9.

LIST OF ATTACHMENTS

The following attachments are made a part of this solicitation and any resultant contract.

Title
Pages
Performance Work Statement
13
Quality Assurance Surveillance Plan
11
Vicinity Map
1
Schedule of Items
1
Wage Determination
3

FAR Class Deviations and Updates (at end of this document)

Notice for Filing Agency Protests (at end of this document)

FAR Overhaul | FAR Companion Guide
1

March 2025 Class Deviation

This Call Order incorporates two FAR class deviations to ensure compliance with Executive Orders 14148, 14173, 14168, and 14208, issued since January 20, 2025. It also removes references to AGAR clauses and provisions that have been rescinded. These updates reflect recent policy changes and remove outdated requirements, as detailed below.

The following FAR provisions and clauses are hereby removed in their entirety from the LMIR BPA:

· 52.222-21 Prohibition of Segregated Facilities

· 52.222-26 Equal Opportunity

· 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026/1 1/This provision was removed to comply with the Executive Order 14236 titled "Additional Rescissions of Harmful Executive Orders and Actions," dated March 14, 2025.

The following FAR clauses now include deviations to align with recent Executive Orders:

· 52.212-3 Offeror Representations and Certifications—Commercial Products and Commercial Services (MAY 2024) (DEVIATION FEB 2025)

· 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services (JAN 2025) (DEVIATION FEB 2025)

· 52.223-1 Biobased Product Certification (MAY 2024) (DEVIATION FEB 2025)

· 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (MAY 2024) (DEVIATION FEB 2025)

Ther following references to AGAR Clauses and provisions are hereby removed to comply with AGAR Rule 2024-22463 (89 FR 81014):

· AGAR 452.211-74 Period of Performance (FEB 1988)/2

· AGAR 452.215-73 Post Award Conference (NOV 1996) /2

· AGAR 452.219-70 Size Standard and NAICS Code Information (SEP 2001) /2

· AGAR 452.236-72 Use of Premises (NOV 1996) /2

· AGAR 452.236-77 Emergency Response (NOV 1996)

· AGAR 452.236-78 Fire Suppression and Liability (MAY 2014)

· AGAR 452.237-74 Key Personnel (FEB 1988) /2 2/AGAR clauses and provisions that were included in full text have been retained, with only the AGAR reference removed.

The following AGAR clauses is hereby included:

· AGAR 452.236-70 Emergency Response, Fire Suppression and Liability (NOV 2024)

The following FAR and AGAR clauses have been added, effective April 2026:

· FAR 52.222-90, Addressing DEI Discrimination by Federal Contractors (APR 2026).

· AGAR Clause 452.203‑72 Unenforceable Supplier Terms (APR 2026) All call orders will incorporate these changes by reference at award.

Disclaimer: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

In advancement of Section 2 of Executive Order 14208, the removal of requirements related to Executive Order 14057 eliminates all non-statutory sustainability requirements or preferences in purchases of food service wares, including paper straws. In addition to removing requirements related to Executive Order 14057, the attachment also reflects recent updates to Code of Federal Regulation citations for the U.S. Department of Agriculture’s BioPreferred® Program, a statutory purchasing preference program.

These class deviations will remain in effect until rescinded or incorporated into the FAR.

As prescribed in AGAR 433.104-4 (a)(5)(ii), the following Notice for Filing Agency Protests shall be included in every solicitation.

NOTICE FOR FILING AGENCY PROTESTS

United States Department of Agriculture (USDA) Ombudsman Program

The USDA is committed to issuing solicitations and awarding contracts in a fair and prompt manner. The Ombudsman Program for Agency Protests (OPAP) was established to address protest issues within the agency, providing an alternative to costly and time-consuming litigation. Operating independently, OPAP offers relief comparable to that granted by the Government Accountability Office (GAO). Interested parties are encouraged to resolve concerns through USDA’s internal Alternative Dispute Resolution (ADR) process before pursuing external forums such as the GAO. Concerns may be addressed informally or through a formal agency protest filed with either the Contracting Officer or the Ombudsman.

Informal Forum with the Ombudsman

1. Initial Point of Contact: Interested parties who believe a specific USDA procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer.

2. Escalation: If the Contracting Officer is unable to address their concerns, interested parties are encouraged to contact the USDA Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Utilization of the informal forum does not suspend any time requirement for filing a formal protest with the agency or other forums.

3. Required Information: To ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman

1. Effort to Resolve: Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions.

2. Independent Review: If the protester’s concerns remain unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest with either the Contracting Officer or, alternatively, with the Ombudsman under the OPAP program. Contract awards or performance will be suspended during the protest period unless justified in writing for urgent and compelling reasons or determined in writing to be in the best interest of the Government.

3. Resolution Timeline: The agency’s goal is to resolve protests within 35 calendar days from the date of filing.

4. Required Information: Protests shall include the information set forth in FAR 33.104(a)(3). Failure to submit the required information may result in a delay or dismissal of the protest.

5. Timeliness: Protests must be filed within the timeframes specified in FAR 33.104.

6. Submission: Formal protests under the OPAP program should be submitted electronically to SPE.inquiry@usda.gov and the Contracting Officer.

Election of Forum. By initiating a protest with the USDA, the protester agrees not to pursue the same matter with the Government Accountability Office (GAO) or any other external forum while the agency protest is pending. If a protest is filed externally, the agency protest will be dismissed.

Page last modified on October 15, 2025 FAR Overhaul | FAR Companion Guide

Oct 30, 2025

The Federal Acquisition Regulatory Council has released an update to the FAR Companion as part of the ongoing Revolutionary FAR Overhaul (RFO) Initiative, in accordance with Executive Order 14275 and OMB Memorandum M-25-26.

The following RFO update was posted on October 30, 2025:

· FAR Companion, Version 2.0, includes the initial release of FAR Companion (FC) parts 2, 3, 7, 13, 14, 15, 16, 17, 19, 20, 21, 22, 23, 24, 25, 27, 30, 32, 37, 41, 42, 44, 45, 47, 48, 52, and 53.

· Version 2.0 also includes updates to previously released content: update to FC 8.104 pertaining to “required use” contracts and providing more information and resources on Category Management, including beta version content of the Category Management Buying Guide; update to FC 8.401 pertaining to evaluation factors; updates to FC 8.401(b) and FC 12.301 removing references to debriefings; new annotation under FC 8.401(b) related to sole source justification content for FSS orders; new annotation under FC 12.001 related to contracting methods for commercial construction; update to FC 11.204 to clarify brand name or equal as distinct from brand name justifications under FAR 6.104; updates to thresholds referenced due to the October 1, 2025 inflation adjustment rule; various citation corrections throughout; and changed “Reserved” to “No additional guidance” when the FAR Companion does not provide any practice recommendations for that associated FAR part.

· FAR Companion, Version 2 is posted on www.acquisition.gov/far-overhaul.

To view the FAR Companion, Version 2.0. inclusive of all parts and updates, visit: https://www.acquisition.gov/sites/default/files/page_file_uploads/far-companion.pdf To view all available rewritten FAR Parts and agency deviations, visit: https://www.acquisition.gov/far-overhaul/far-part-deviation-guide.

Stay informed. View the latest FAR Overhaul news and announcements at: https://www.acquisition.gov/far-overhaul.

PAGE

Revised 04/27/2026

File details come from the government source that posted it. Updated .