This is a Construction Specification document (SD-04 Stripping) issued by the Natural Resources Conservation Service (NRCS) for use in the Land Obstruction Removal and Disturbed Land Revegetation contract in South Dakota. The specification outlines requirements for stripping operations, which involve removing topsoil and undesirable materials from borrow areas, foundations, and earth fill areas to expose subsoil reasonably free of roots and organic materials. The excavated earth material suitable for fill shall be placed in designated fill areas, while stripped material appropriate for topsoil shall be stockpiled and placed over disturbed areas as shown on project drawings or as approved by the NRCS inspector. All waste materials must be disposed of according to drawings or NRCS inspector approval.
The document establishes specific technical requirements for foundation stripping and borrow area stripping. Foundation stripping requires removal of loose soil and extension to a reasonably smooth surface in consolidated subsoil, with foundation slopes excavated to a one-to-one gradient or flatter unless otherwise shown on drawings. Borrow area stripping must expose material suitable for earth fill. This specification serves as one of nine attachments to the broader IDIQ solicitation (12FPC126Q0009) for Easement Restoration and Emergency Watershed Protection services, and contractors responding to task orders under this contract must comply with these technical standards for all stripping work performed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C05 - Attachment 10 - Q and A - 12FPC126Q0009 - revision 1.pdf | ||
| C05 - 12FPC126Q0009.pdf | ||
| C05 - Attachment 10 - Q and As - 12FPC126Q0009.pdf | ||
| C04 Attachment 5 - SD_CS-02_Clearing_and_Grubbing_2022.docx | DOCX document | |
| C04 - Part 12 Combined Synopsis_Solicitation_4-30-2026.docx | DOCX document | |
| C04 - Attachment 8 - SD_CS-10_Salvaging_and_Spreading_Topsoil_2022.docx | DOCX document | |
| C04 - Attachemnt 4 - Border Mix.xlsx | XLSX spreadsheet | |
| C04 - Attachment 3 - WAGE DETERMINATION.pdf | ||
| C04 Attachement 2 - Pricing Schedule.xlsx | XLSX spreadsheet | |
| C04 - Attachment 9 - SD_CS-28_Seeding_2024.docx | DOCX document | |
| C04 - Attachment 7 - SD_CS-05_Excavation_2022.docx | DOCX document | |
| C04 - 12FPC126Q0009(1).pdf | ||
| C04 Attachment 1 - Performance Work Statement.DOCX | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Natural Resources Conservation Service
Construction Specification SD-04 Stripping
1. Scope The work shall consist of removing topsoil and other undesirable materials from borrow areas and foundations of structures and earth fill areas.
2. General Required stripping excavation depth will be the depth needed to expose subsoil reasonably free of roots and other perishable organic materials. Excavated earth material suitable for fill shall be placed in earth fill areas as appropriate. Stripped material suitable for topsoil shall be stockpiled and placed over disturbed areas as shown on the drawings or as approved by the Natural Resources Conservation Service (NRCS) inspector. All waste material shall be disposed of as shown on the drawings or as approved by the NRCS inspector.
3. Foundation Stripping Remove loose soil and extend stripping to a reasonably smooth surface in consolidated subsoil. Except as shown on the drawings, foundation slopes shall be excavated to one horizontal to one vertical, or flatter.
4. Borrow Area Stripping Borrow areas shall be stripped to expose material suitable for earth fill.
| NRCS, SD | CONSTRUCTION SPECIFICATION SD-04 – Page 2 of 2 | October 2022 |