Summary: Schedule of Items - North Mills River Campground Reconstruction

This document is a Base Bid Schedule of Items for the North Mills River Campground Reconstruction project located in the Pisgah Ranger District, National Forests in North Carolina, Transylvania County. The schedule contains 13 line items, all priced on a Lump Sum (LSQ) basis, covering comprehensive reconstruction and improvement work at the campground facility.

The scope of work encompasses: (1) Mobilization and Bonding; (2) Removal and Disposal of Designated Trees; (3) Construction Survey and Staking by NC Licensed Surveyor; (4) Erosion and Sediment Control; (5) Day Use Parking Area Reconstruction including demolition, milling, pavement, drainage, curbing, kiosk, gates, and fishing landing with retaining walls and safety railings; (6) Day Use Picnic Area Reconstruction including demolition of existing facilities, installation of concrete walkways and picnic pads, pedestrian trail bridge repairs, and precast concrete amenities; (7) Main Camping Loop Reconstruction covering 14 tent and living space sites with new curbing, pavement, concrete V-ditch, retaining wall, river access stairway, and furnishings; (8) Roadside Camping Loop Reconstruction for 12 camping sites plus Campground Manager Site #1 with new information kiosk, fee station, and drinking fountain; (9) RV Dump Station Replacement; (10) Potable Water and Sewer System Improvements campground-wide including water mains, pump station, and sewer infrastructure; (11) Electrical System Modifications campground-wide with new main distribution panels and 13 power pedestals; (12) Construction of New 8-Unit Bathhouse with concrete foundations, CMU block walls, standing seam metal roofing, and full interior fixtures; and (13) Existing Building Repairs and Miscellaneous Items including re-roofing, CCTV sewer inspection, signage installation, and wooden fence installation. The document notes that any work indicated in plans or specifications but not specifically listed shall be considered incidental with no additional payment. Pricing for all items is to be provided by contractors on the blank PRICE column, with a total price calculated for all base bid items.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6/12/2026

PAY ITEM

NO.

DESCRIPTION

METHOD

OF

MEASURE

PRICE

1 Mobilization and Bonding LSQ

Removal and Disposal of Designated Trees

Includes all trees which may interfere with the installation of Utilities, Walkways, Pavements, Culverts and other Structures.

LSQ

3 Construction Survey and Staking by NC Licensed Surveyor LSQ

4 Erosion and Sediment Control LSQ

Day Use Parking Area Reconstruction

Includes demolition of existing parking lot including milling and re-use of existing pavement and demolition of existing gates and other appurtenances. Construction of new parking lot including fill, base course, and pavement, drainage structures, curbing, kiosk, road gates, and other appurtenances. Construction of fishing landing including retaining walls, concrete landings, ramps and stairway, stone veneer, and safety railings.

LSQ

Day Use Picnic Area Reconstruction

Includes demolition and disposal of existing flush toilet building, picnic tables, fire grills, concrete walkways and information kiosk, and installation of reinforced concrete walkways and picnic pads, repair of pedestrian trail bridge, installation of handrails, furnishing and installation of precast concrete tables, pedestal grills, and trash receptacles, and construction of pump station service drive.

LSQ

Main Camping Loop Reconstruction

Includes demolition and removal of existing camping site amenities, curbing, and pavement. Reconstruction of 14 tent and living space camping sites with PT timber curbing, compacted stone base, and rock dust. Placement of ABC stone base and bituminous pavement on loop road and parking areas. Construction of concrete V-ditch, retaining wall and stone veneer at Site #25, and river access stairway. Furnishing and installation of picnic tables, fire rings, lantern poles, food lockers, and trash receptacles. Replacement of road gates.

LSQ

BASE BID SCHEDULE

SCHEDULE OF ITEMS

North Mills River Campground Reconstruction

Pisgah Ranger District National Forests in North Carolina

Transylvania County

National Forests in North Carolina 6/17/2026 Page 1 of 2

Roadside Camping Loop Reconstruction

Includes demolition and removal of existing camping site amenities, curbing, pavement, and vault toilet building. Reconstruction of 12 tent and living space camping sites with PT timber curbing and walls, compacted stone base, and rock dust. Reconstruction of Campground Manager Site #1 including timber wall and concrete stairway. Placement of ABC stone base and bituminous pavement on loop road and parking areas.

Furnishing and installation of picnic tables, fire rings, lantern poles, food lockers, and trash receptacles. Construction of 3-panel information kiosk with LED lighting, fee station, and drinking fountain. Installation of road gates.

LSQ

RV Dump Station Replacement

Includes demolition and disposal of existing water towers, concrete basin, bar screen box, and DIP sewer line. Construction of new water towers on concrete slabs with double check valve and signage, new concrete catchbasin, and replacement pavement.

LSQ

Potable Water and Sewer System Improvements — Campground-Wide

Includes demolition of existing wastewater pump station, manholes, gravity sewer line, yard hydrants, and drinking fountains. Installation of HDPE water mains and service lines to new bathhouse and yard hydrants, frost-proof yard hydrants, drinking fountain and bottle filling station, and watermain insulation jacket replacement. System flushing, disinfection, and bacteriological testing. Installation of new precast concrete pump station with duplex grinder pumps, sewer manholes, and HDPE and SDR-35 sewer lines.

LSQ

Electrical System Modifications — Campground-Wide

Demolition of existing MDP at Main Loop. Construction of new MDP at Main Loop, MDP #1 at Campground Manager Site with new underground service to wellhouse, and MDP #2 at Roadside Loop. Installation of 13 power pedestals with underground electrical feeders in PVC conduit at Roadside Loop.

LSQ

Construction of New 8-Unit Bathhouse

Includes site grading, reinforced concrete building and porch foundations and floor slabs, access stairway, walkways, reinforced CMU block walls, exterior insulation, Tennessee field stone veneer, roof framing and standing seam metal roofing, polygon windows, finish carpentry, rough plumbing and fixtures including pressure booster pump, floor and wall tile, restroom and shower accessories, metal doors and hardware, building electrical, exhaust fans, and interior and exterior painting.

LSQ

Existing Building Repairs and Miscellaneous Items

Includes re-roofing and repairs to existing 8-unit bathhouse, storage building at sewage treatment plant, sewage treatment plant shelter, and wellhouse. CCTV inspection and cleaning of sewer lines. Installation of new signage per signage plan. Installation of wooden fence.

LSQ

Note: Any work indicated in the plans or specifications but not specifically listed or referenced herein shall be considered incidental to the above and no additional payment will be made.

TOTAL PRICE - ALL BASE BID ITEMS

National Forests in North Carolina 6/17/2026 Page 2 of 2