C05_Attachment 6- Revised NMR CG Recon Plans.pdf
PDF 19 MB Posted
- Attached to
- North Mills River Campground
- Solicitation number
- 12445226Q0042
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a comprehensive set of construction design plans and specifications for the North Mills River Campground Reconstruction Project in the Pisgah National Forest, Pisgah Ranger District, North Carolina (R-08 Southern Region).
The project encompasses reconstruction of a 27-campsite main loop, a 13-site roadside loop, day-use parking and picnic areas, and support facilities. Key infrastructure improvements include new paved camping loops (11 feet minimum width) with 13-foot parking spaces, concrete curbing, and accessible facilities complying with ADA standards. The project includes construction of new facilities such as a bathhouse with shower rooms, modular dump stations (#1 and #2), RV power pedestals, information kiosks, and drinking fountain/bottle filling stations. Significant demolition and removal work is specified, including existing amenities, split-rail fencing replacement, existing paved surfaces milling and resurfacing, and removal of deteriorated structures. Utility systems include new water supply lines with booster pump and pressure management, sanitary sewer infrastructure with duplex pump stations and gravity sewer lines, electrical distribution with new meter bases and pedestals, and stormwater management with siltation ponds and erosion control measures. The design incorporates environmental protections through temporary silt fencing, erosion control blankets, and sediment traps. Construction details specify NCDOT bituminous pavement (S9.5B), compacted ABC stone base, timber curbing with retaining walls, concrete walkways and accessibility features, metal roofing details, and miscellaneous repairs to existing structures including the bathhouse, treatment plant, and wellhouse. The specifications reference standard construction materials, finishes, and methodologies consistent with federal and state regulations, with design dated March 2026.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION MAP
United States Department of Agriculture Forest Service
INDEX OF SHEETS
SHEET # SHEET TITLE
COVER SHEET
N. MILLS RIVER CG
5289 N. MILLS RIVER RD.
MILLS RIVER, NC
28759
EXISTING SITE AND DEMOLITION PLAN
PARKING LOT AND P. AREA EXISTING SITE AND DEMOLITION PLAN
NEW CAMPSITES LAYOUT
MANAGER'S SITE #1 COORDINATES AND DIMENSIONS
NEW CAMPSITES LAYOUT AND COORDINATES
NEW CAMPSITE #25 LAYOUT AND PROFILE
CAMPSITES LIVING SPACE AND AMENITIES CONCEPTUAL
CAMPSITES AMENITIES DETAILS
3-PANEL INFORMATION KIOSK LAYOUT
3-PANEL INFORMATION KIOSK FOUNDATION SLAB LAYOUT
3-PANEL INFORMATION KIOSK CONSTRUCTION DETAILS
NEW RV DUMP STATION CONSTRUCTION DETAILS
NEW WASTEWATER PUMP STATION DETAILS
NEW MDP CONSTRUCTION DETAILS
EXISTING SITE AND DEMOLITION PLAN
(R-08) SOUTHERN REGION
NATIONAL FORESTS IN NORTH CAROLINA
PISGAH RANGER DISTRICT
NEW RV DUMP STATION LAYOUT AND COORDINATES
PICNIC AREA TRAIL RELOCATION AND AMENITIES LAYOUT
DAY USE PARKING LOT LAYOUT
DAY USE PARKING LOT COORDINATES AND GRADING PLAN
DAY USE PARKING LOT 2-PANEL KIOSK DETAILS
NEW CAMPSITES GRADING AND DIMENSIONS
FLOOR PLAN AND ELEVATIONS
GRADING PLAN
FOUNDATION DETAILS
BUILDING SECTIONS
MISCELLANEOUS BUILDING SECTIONS
ROOF FRAMING LAYOUT
PLUMBING SCHEMATICS
CONSTANT PRESSURE BOOSTER PUMP DETAIL
PLUMBING FIXTURES AND ACCESSORIES SCHEDULES
SHOWERS AND RESTROOMS SECTIONS
ELECTRICAL LAYOUT AND SCHEDULES
HEATING & VENTILATION DETAILS
DOOR AND FINISH SCHEDULES
MDP #1 AND #2 CONSTRUCTION DETAILS
RV POWER PEDESTALS SCHEMATICS
EXISTING BUILDINGS REPAIRS
MISCELLANEOUS REPAIRS DETAILS
SINGLE ROAD GATE DETAILS
PICNIC AREA FOOT BRIDGE REPAIRS
RIVER ACCESS STAIRWAY CONSTRUCTION DETAIL
NEW CAMPSITE #25 RETAINING WALL RAILING DETAILS
DRAINAGE PIPE CULVERTS SCHEDULE
PICNIC AREA AMENITIES DETAILS
TRASH RECEPTACLES AND FOOD LOCKERS DETAILS
FISHING LANDING LAYOUT
FISHING LANDING SECTIONS
FISHING LANDING SECTIONS
FISHING LANDING RAILINGS LAYOUT AND SECTIONS
EXISTING BUILDINGS REPAIRS
PICNIC AREA TRAIL RELOCATION AND AMENITIES LAYOUT
INDEX OF SHEETS
SHEET # SHEET TITLE
DOUBLE ROAD GATE DETAILS
CAMPSITES #2, #3, #4, #5, #6, #8, #9 COORDINATES AND DIMENSIONS
CAMPSITES #10, #11 COORDINATES AND DIMENSIONS
CAMPSITES #7, #12, #13 COORDINATES AND DIMENSIONS
METAL ROOFING TRIM DETAILS
60 ROAD BRIDGE RAILING REPAIRS
SIGNAGE LAYOUT AND SCHEDULE
REVIEWED BY:
FACILITIES PROGRAM MANAGER
RECOMMENDED BY:
PUBLIC SERVICES STAFF OFFICER
RECOMMENDED BY:
PISGAH DISTRICT RANGER
APPROVED BY:
FOREST SUPERVISOR
STORM SEWER AND SILT POND PROFILE64
EROSION AND SEDIMENTATION CONTROL
13A TRUSS BRIDGE ACCESS WALKWAY DETAILS
19A CAMPSITE #15 LAYOUT AND DETAILS
19B CAMPSITE #16 LAYOUT AND DETAILS
37B
3-PANEL INFORMATION KIOSK FOUNDATION SECTIONS33A
37A
BLOCK VENTS DETAILS43A
SIGN BASE DETAIL
CALEB DAVIS Digitally signed by CALEB DAVIS Date: 2026.07.11 14:52:29 -04'00'
JAMES JONES
Digitally signed by JAMES
JONES
Date: 2026.07.13 08:33:49 -04'00'
DAVID CASEY Digitally signed by DAVID CASEY Date: 2026.07.13 08:19:13 -04'00'
JAMES MELONAS
Digitally signed by JAMES
MELONAS
Date: 2026.07.13 13:17:45 -04'00'
Parking Area
N O
R
TH
M
ILLS R
IVER
Pipe Drain
12" C.M.P.
Sign
Top of Bank
Dumpster
Old Rock Retaining Wall
Rhododendron, Hemlock, Poplar
Foot Bridge
Gravel Trail
Gravel Trail
Gravel Trail
Rhododendron
Rhododendron
Daytime Parking Area
B rid ge F.S. #1206
F .S
. #5
Gravel Trail
Asphalt Curb
(R08)
SOUTHERN REGION
NORTH MILLS RIVER
CAMPGROUND
RECONSTRUCTION
PISGAH NATIONAL
FOREST
PISGAH RANGER DISTRICT
MARCH 2026
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
DATE
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
DRAWN
DESIGNER
DRAWING SCALE
1" = 40'
DAY USE PARKING LOT
AND PICNIC AREA
EXISTING SITE AND
DEMOLITION PLAN
REMOVE EXIST.
DOUBLE GATE
OBLITERATE
EXISTING TRAIL
REMOVE DUMPSTER
PAD
REMOVE ALL EXISTING PICNIC TABLES
AND PED. GRILLS - SEE NOTES
REMOVE
PICNIC TABLES
GENERAL NOTES:
REMOVE DF
REPLACE HAND RAILINGS
SEE DETAIL
SHEET 9
REMOVE AND REPLACE EXISTING
SPLIT-RAIL FENCE TYP. ENTIRE
CAMPGROUND - SEE DETAIL SHEET 17
REMOVE EXIST. FLUSH TOILET
BUILDING AND RELATED
REMOVE EXIST. FISHING PIER
REMOVE EXIST. GATE
REMOVE EXISTING
DUMPSTER PAD
CONTRACTOR TO
STAKE SILT POND
PERIMETER - ADJUST
SHAPE AND LOCATION
TO MINIMIZE TREE
CLEARING
REMOVE ALL TREES BETWEEN RIVER'S EDGE AND PARKING LOT
Feet 0 40 8020
1"=40'
NORTH M
ILLS RIVER
(R08)
SOUTHERN REGION
NORTH MILLS RIVER
CAMPGROUND
RECONSTRUCTION
PISGAH NATIONAL
FOREST
PISGAH RANGER DISTRICT
MARCH 2026
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
DATE
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
DRAWN
DESIGNER
DRAWING SCALE
1" = 20'
DAY USE
PARKING LOT
LAYOUT
EXCAVATE
NEW DITCHLINE
ROUND POST FENCE (TYP.)
SEE DETAIL SHEET 18
CONSTRUCT CONCRETE
TRAIL WALKWAY
PARTIAL LAYOUT DIMENSIONS
SECTION A - SIDEWALK DETAIL
NEW TOP OF
BANK
4" WIDE
BLUE STRIPES
4" WIDE
WHITE STRIPES
6" WIDE
CONCRETE CURB AT 1% GRADE
A
INTERNATIONAL SYMBOL
OF ACCESS - BLUE SQUARE
OVERLAID IN WHITE
B
SECTION B - CURBING DETAIL
COIR EROSION CONTROL
BLANKETS (TYP.)
12" DIA. COCONUT
COIR LOGS (TYP.)
Feet 0 20 4010
1"=20'
(R08)
SOUTHERN REGION
NORTH MILLS RIVER
CAMPGROUND
RECONSTRUCTION
PISGAH NATIONAL
FOREST
PISGAH RANGER DISTRICT
REV AUGUST 2026
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
DATE
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
DRAWN
DESIGNER: VELEZ
DRAWING SCALE
1" = 20'
DAY USE
PARKING LOT
GRADING PLAN
EXTEND AND RE-SHAPE
EXISTING DITCHLINE
NEW TOP
OF BANK
6" WIDE
CONCRETE CURB
TOP OF CURB 2215.38
PVMNT FIN. ELEV. 2214.88
TOP OF CURB 2217.23
FIN. PVMNT 2216.73
Northing Ground
ElevationPoint # Easting
2216.40 2214.60 2214.97 2217.00 2216.60 2216.60
Finished Elevation
2217.60 2217.23 2215.38
2216.80
Description /Remarks
13 2217.35 12 2216.35
BEGIN CONCRETE CURB
TOP CONC CURB CORNER
8 5598.80 4794.36 2217.72 TRAV I.P. & CAP
DRIVEWAY RADIUS POINT
FIN. ELEV. SIDEWALK CRNR
S.WALK/P.LOT CORNER
S.WALK CRNR/BEGIN RAMP
RET. WALL CORNER
FISHING LANDING CORNER
4802.31 4824.35 4973.20 4959.95 4989.78 4995.85 4951.97 4934.58 4770.74 4801.57 4797.23 4717.43 4842.29 4833.22
5535.30 5538.55 5429.33 5423.50 5411.23 5400.67 5406.45 5390.57 5510.79 5481.96 5476.04 5461.22 5442.98 5430.62
PARKING LOT LAYOUT COORDINATES AND FIN. ELEVATIONS
END TOP CONCRETE CURB
0+00 PVMNT
ELEV. 2217.36
3+38 PVMNT
ELEV. 2218.10
FIN. PVMNT/SIDEWALK
ELEV. 2217.00
3+38 EXIST. PVMNT
ELEV. 2218.10
FIN. PVMNT/SIDEWALK
ELEV. 2214.97
EXISTING PARKING LOT
OUTLINE
SILTATION POND
TOP OF CURB 2217.21
FIN. PVMNT 2216.71
0+00 EXIST. PVMNT
ELEV. 2217.36
SIDEWALK/P.LOT CORNER
FIN. ELEV. 2217.00
TOP OF CURB 2215.38
PVMNT FIN. ELEV. 2214.88
ENTRANCE / EXIT GRADING PLAN
0+00 0+26 0+74.6 0+86.6 2+00 2+40 2+67.63 3+07.78 3+38
4810.89 4794.43 4799.90 4809.56
5588.74 5568.68 5525.49 5518.39
4900.99 4933.24 4955.52 4993.68
5451.31 5427.64 5411.29 5406.26
5021.855417.21
2213.52 2214.48 2216.54 2218.10
2217.36 2217.00
2216.21 2214.22
EXIST. PVMNT EDGE
PVMNT CENTERLINE
CATCHBASIN CENTERLINE
EXIST. PVMNT EDGE
PVMNT CENTERLINE
PVMNT CENTERLINE
15 4874.075400.64 16 4889.825399.83 17 4898.105411.13
18 MANHOLE CENTERLINE4967.135390.88
19 SILTATION POND C.LINE4987.465368.82
20 CMP INLET4984.355422.02
DRIVEWAY RADIUS POINT
DRIVEWAY RADIUS POINT
SIDEWALK CORNER
SIDEWALK CORNER
FISHING LANDING CORNER
RET. WALL CORNER
RET. WALL CORNER
TOP CONC CURB CORNER
2215.18
A
SECTION A
Feet 0 20 4010
1"=20'
15 16
2215.44 2215.79 2214.28 2214.50 2213.51 2213.26 2214.55 2214.56 2215.34 2215.13 2215.20 2215.02 2214.79 2213.90 2212.59 2214.29 2214.50 2214.02 2212.41 2213.99
2217.20 2215.74 2215.41 2215.30
2214.24 2214.55 2213.59 2218.12
2214.56
GATE ELEVATION
GATE PLAN VIEW
DETAIL A
A
SECTION A
GENERAL NOTES:
GATE ELEVATION
GATE PLAN VIEW
A
DETAIL 1
SECTION A
DETAIL 2
GENERAL NOTES:
FRONT ELEVATION
CEILING JOIST PLAN
A B
DIRECTORY SPECIFICATIONS
ROOF RAFTERS PLAN
DAY USE KIOSK LAYOUT
NORTH MILLS RIVER
CAMPGROUND
RECONSTRUCTION
PISGAH NATIONAL
FOREST
PISGAH RANGER DISTRICT
MARCH 2026
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
DATE
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
DRAWN
DESIGNER
DRAWING SCALE
1" = 20'
PICNIC AREA TRAIL
RELOCATION AND
AMENITIES LAYOUT
B rid ge
PARTIAL PROFILE
GENERAL NOTES:
AMENITIES QUANTITIES
Northing Ground
ElevationStation Easting 0+00 0+12 0+31 0+43 0+75 1+20 2+00 2+40 2+75 3+45 3+71
Finished Elevation 2223.53 2223.63 2222.91 2222.69 2221.81
Description / Remarks
BEGIN PAVED TRAIL4791.75
4798.10 4782.11 4782.46 4779.28 4774.95 4770.74 4767.79 4775.70 4782.43 4785.38
5604.40 5589.31 5588.75 5578.76 5559.45 5549.05 5510.79 5506.76 5500.95 5489.77 5493.85
2223.53 2221.13 2221.11 2221.69 2221.31 2220.73 2219.23 2219.30 2218.54 2219.08 2219.30
NEW TRAIL COORDINATES AND GROUND ELEVATIONS
4+00 4782.435489.77 2218.54
Feet
NORTH MILLS RIVER
CAMPGROUND
RECONSTRUCTION
PISGAH NATIONAL
FOREST
PISGAH RANGER DISTRICT
MARCH 2026
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
DATE
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
DRAWN
DESIGNER
DRAWING SCALE
1" = 20'
Gate
Foot Bridge
F.S. #1206
F .S
. #5
PICNIC AREA TRAIL
RELOCATION AND
AMENITIES LAYOUT
Northing Ground
ElevationStation Easting 3+45 3+71
Finished Elevation
Description /Remarks
4782.43 4785.38
5489.77 5493.85
PICNIC AREA TRAIL COORDINATES AND GROUND ELEVATIONS
4+00 4+75
4782.43 4785.38
5489.77 5493.85
6+50 6+85
4782.43 4785.38
5489.77 5493.85
2215.65 2216.99
7+30 7+70
4782.43 4785.38
5489.77 5493.85
2216.79 2215.20
8+02 8+19
4782.435489.77 2215.74
8+34 END TRAIL
5+50 4785.385493.85 2217.17 5+90 4785.385493.85 2216.53
2219.08 2219.30 2218.54 2218.72
CP-17
2215.3
Feet
Foot Bridge
WALKWAY CROSS SECTION
STAIRWAY REINFORCEMENT DETAIL
WALKWAY EXP. JOINTS DETAIL
A
DOUBLE TABLE PAD LAYOUT
SECTION A
PEDESTAL GRILL DETAIL
TRAIL WALKWAY SECTIONPICNIC TABLES DETAIL
A
SINGLE TABLE PAD LAYOUT
A
ACC. DOUBLE TABLE PAD LAYOUT
ACC. SINGLE TABLE PAD LAYOUT
ACC. TRASH RECEPT. and PET WASTE COL. STA.
ACCESSIBLE TRASH RECEPTACLE SECTION
PLAN VIEW
FOOT BRIDGE REPAIR SECTION
A
BOLLARD DETAIL
Sewer Tap
Breaker Box
Faucet
Fountain
G ravel Trail
Daytime Parking Area
C.M.P.
R.C.P.
= Water Valve
= Rock Wall
= Power Pole
= Corrugated Metal Pipe
= Reinforced Concrete Pipe
= Drainage or Ditch Line
= Control Point
= Sanitary Sewer Manhole
LEGEND
C.P.P. = Corrugated Plastic Pipe
= Grill
REMOVE TENT PADS
CONCRETE
CURBING (TYP.)
REMOVE ALL AMENITIES INCL.
PICNIC TABLES, FIRE RINGS
AND LANTERN POSTS (TYP.)
REMOVE ALL
AMENITIES THIS SITE
(R08)
SOUTHERN REGION
NORTH MILLS RIVER
CAMPGROUND
RECONSTRUCTION
PISGAH NATIONAL
FOREST
PISGAH RANGER DISTRICT
REV AUG 2026
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
DATE
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
DRAWN
DESIGNER
DRAWING SCALE
1" = 30'
MAIN LOOP
EXISTING SITE
AND
DEMOLITION PLAN
REMOVE EXIST.
TREE
EXIST.
BATH-HOUSE
SEE SHEET 57
FOR REPAIRS
REMOVE EXIST.
SPLIT-RAIL FENCE (TYP.)
REPLACE EXIST.
YARD HYDRANT
REPLACE EXISTING
18" DIA. RCP
REPLACE EXIST.
CULVERT
NO WORK THIS AREA
REMOVE EXISTING PAVED DITCHES
AND REPLACE W/ CONCRETE V-DITCHES
SEE DETAIL
REMOVE ASPHALT PAVEMENT BY MILLING. SCARIFY THE
EXISTING BASE AND MIX WITH THE MILLED MATERIAL.
PLACE A 4" MIN. LOOSE DEPTH LAYER OF ABC STONE OVER
MIXED MATERIAL AND COMPACT TO 90% OF THE MATERIAL'S
MOST RECENT AASHTO T-180 TEST RESULTS. FIELD TEST THE
STONE BASE COMPACTION BY THE CONVENTIONAL METHOD OR
THE NUCLEAR GAUGE METHOD. (REF. SECTION 520 OF NCDOT SPECS)
EXIST. MDP TO BE
REMOVED & REPL.
Feet 0 30 6015
1"=30'
Top of Bank
B A
B
Sewer Tap
Breaker Box
Faucet
Fountain
G ravel Trail
Daytime Parking Area
CONTROL POINT COORDINATES
Northing ElevationPoint # Easting Description
5592.5524 4020.9913 2225.04 trav nail
5541.7126 3541.7162 2233.69 trav I. P.& Cap
5352.3197 3812.2922 2238.82 trav nail
5209.1872 3852.3212 2246.44 trav Magnail
5228.8009 4067.0365 2249.59 trav nail
5465.6558 4060.4353 2235.64 trav I. P.& Cap
REPAIR STONE
STAIRWAY
(R08)
SOUTHERN REGION
United States Department of Agriculture Forest Service
NORTH MILLS RIVER
CAMPGROUND
RECONSTRUCTION
PISGAH NATIONAL
FOREST
PISGAH RANGER DISTRICT
MARCH 2026
PROJECT NAME
DRAWING TITLE
DATE
DRAWING SHEET NO.
DRAWN
DESIGNER
DRAWING SCALE
1" = 40'
MAIN LOOP
CAMPING SITES
LAYOUT AND
COORDINATES
STAMPS, LOGOS, AND SEALS
DATENO.
REVISION / ISSUE
A
A
B
RIVER ACCESS
WALKWAY
AMENITIES QUANTITIES:
CAMPSITES POINT COORDINATES
Northing
Elevation Easting
RP 14A 5458.00 3979.88
5436.67 4053.44
5422.76 3979.30
3990.495461.16
Point #
RP 14B
D C
4127.47 4083.49
RP 16A 5244.45
5213.55 5254.16 5234.53
RP 16B
D C 4113.46
4127.25
RP 17A
RP 17B
D C
RP 18A
RP 18B
D C
4037.10 4028.53
RP 19A 5340.82
5328.03 5266.14
5324.61
RP 19B
D 4011.47C 4041.28
3976.26 3938.76
5290.29 5223.81 5302.27 5279.79D
C 3941.27 3981.40
Ground Elevation Finished
CAMPSITES POINT COORDINATES
Northing
Elevation EastingPoint #
RP 21A 5297.64 3851.45
5368.09 3814.03
5298.49 3844.21
5306.03 3858.34
RP 21B
D C
E 5325.75 3861.43
5589.42
5381.49 3775.34
5451.21 3681.71
5379.43 3736.24
5408.31 3757.75D
C
RP22A
RP22B
5521.16 3536.97
5510.97 3590.65
5529.96 3544.18
5510.31 3540.44D
C
RP23A
RP23B
Ground Elevation Finished
CAMPSITE 25
5498.67 3752.31
5563.87 3812.56
5514.89 3756.41
5493.17 3779.91D
C
5515.82 3909.55
5580.58 3947.44
5523.45 3907.57
5507.30 3935.22D
C
RP 24A
RP 24B
RP 26A
RP 26B
RP 20A
RP 20B
4167.81 4114.41
5173.22 5162.47 5191.70 5160.33
4153.23 4159.54
4176.92 4144.55
5094.41 5090.98 5086.19 5054.37
4175.23 4178.60
A 3845.07
5598.32 3858.37
5615.37 3856.38C
B
D E F
5620.23 3898.10
5603.18 3900.08
5597.57 3915.07
2234.44 2236.83 2236.37 2235.34
2250.85 2250.89 2250.24 2251.48
2260.34 2256.26 2257.93 2258.55
2263.73 2261.99 2264.01 2265.16
2240.53 2245.77 2241.31 2242.76
2243.41 2247.32
2237.61
2243.91 2244.58
2237.25
2238.02 2237.68
2237.31 2236.09
2235.14
2234.73 2238.55 2236.68
2233.84 2234.28 2233.66 2234.03
2231.98 2228.03 2232.00 2232.14
2226.21 2225.04 2224.30 2222.63 2224.18 2225.43
2230.59 2225.40 2230.26 2230.34
SEE SHEET 19
RP 27A 5458.41 3838.36
5442.26 3751.93
5474.10 3790.57
5480.10 3822.00
RP 27B
D C
2233.67
2232.65 2232.75
NEW
W.WAY
EXISTING
POWER POLE W/ TRANSF.
RE-SET
DUMPSTER
NEW 10 FT. WIDE X 12 FT. DEEP
CONCRETE DUMPSTER PAD
NO WORK THIS AREA
NEW MDP
BEGIN NEW
PAVEMENT
DUAL FLEX POST
USFS LOGO
CAMPING
INDIVIDUAL 3X4
LETTERS & NUMBERS
IN FIRE RINGS ONLY
RESERVED SIGN
ANCHOR
GRADE
54-IN. DUAL-FLEX FIBERGLASS
SITE MARKER W/ ONE POINTED
END, BROWN ONLY, ITEM NO. DF54-01
BY ROCKART SIGNS AND MARKERS
TEL. 480-854-3400
EXISTING
3/4" PVC
NEW ACC.
HYDRANT
TRASH
RECEPT.
R=50
R=46'
R=50'
EXISTING BRIDGE
BEGIN NEW PAVEMENT
2" THK. COMPACTED NCDOT
S9.5B BITUMINOUS PAVEMENT
PAVE SPUR DRIVE
10 FT. MIN. WIDTH
PAVE MAIN LOOP
11 FT. MIN. WIDTH
R=100'
R=145'
R=12
R =12'
R=6'
PAVE MAIN LOOP
11 FT. MIN. WIDTH
13'
PARKING SPACE
13 FT. MIN. WIDTH (TYP.)
CAMPING SITE PARKING 13 FT. MIN. WIDTH
16' WIDTH WHERE FEASIBLE
R=
R=50'
R=42'
R=24'
R=16'
NEW
24" CMP
R=57'
R =12'
R =5
7'
12'
NEW CONCRETE DITCH
SEE DETAIL SHEET 19
NEW
24" DIA. X 24' CMP
13'
WHEEL STOP
R =5
0'
R=50'
24'
R=45'
R=50'
R=61'
R=3 2'
R =6
1'
SEE SHEET 19A FOR
RECONSTRUCTION DETAILS
SEE SHEET 19
SEE SHEET 19B FOR
RECONSTRUCTION DETAILS
Feet 0 40 8020
1"=40'
B
HOST
A
B 23 A
B A
FILL W/ NCDOT
ABC STONE BASE (TYP.)
CURBING TO BE
LEVEL (TYP.)
LEVEL PARKING
SPACE (TYP.)
26 27
R=16'
LOOP ROAD AND V-DITCH CROSS SECTION TYPICAL
SEE RECONSTRUCTION
DETAILS SHEET 19A
SEE RECONSTRUCTION
DETAILS SHEET 19B
CONTROL POINTS COORDINATES
Northing
ElevationPoint #
Easting Description
18 5228.80 4067.03 2249.59 trav nail
CAMPSITES POINT COORDINATES
Northing GroundPoint # Easting
Description
C
5291.56 4098.67
5318.98 4115.16
5324.97 4130.01
Elevation
Finished
Elevation
A
B
Campsite
Number
4125.56
F
5331.80
5306.53 4135.69
5314.78 4121.98
D
E
BEGIN RET. WALL
RET. WALL CORNER
RECONSTRUCTION LAYOUT
2247.17
STAIRWAY SECTION
A
B
C
D
F
E
PAVEMENT CORNER
LIVING SPACE CRNR
2247.50
2247.50
2244.50
END RET. WALL
LIVING SPACE CRNR
CONTROL POINTS COORDINATES
Northing ElevationPoint # Easting Description
18 5228.80 4067.03 2249.59 trav nail
CAMPSITES POINT COORDINATES
Northing GroundPoint # Easting Description
C
5241.79 4083.20
5251.00 4096.28
5244.46 4100.88
Elevation Finished Elevation
A B
Campsite Number
4113.975253.65D
16 RET. WALL CORNER
RECONSTRUCTION LAYOUT
2252.50
A
RET. WALL CORNER
RET. WALL CORNER2252.50
SECTION A -TIMBER WALL
RETAINING WALL COORDINATES
Northing GroundPoint # Easting
A 5589.42 3845.07
5598.32 3858.37
5615.37 3856.38
Elevation Retaining Wall
Finished Elevation
B C D E F
5620.23 3898.10
5603.18 3900.08
5597.57 3915.07
2226.21 2225.04 2224.30 2222.63 2224.18 2225.43
2227.92
WIREWAY DETAIL
SAFETY RAILING X-SECTION
SAFETY RAILING LAYOUT
TIMBER CURBING SPLICING DETAIL
PICNIC TABLES DETAIL
BOXED STEPS ISOMETRIC
POLE FENCE DETAIL
STAIRWAY PROFILE
NEW MDP #3 FRONT VIEW
GABLE END DETAIL
ROOF TRUSSES SECTION
ROOF TRUSSES PLAN
A
A
SECTION A
A
MDP SCHEDULE
A
GENERAL NOTES:
M
B
M
A
NEW MDP #3 BACK VIEW
B
Repair Foot Bridge
Sign
HOST
Dumpster
24" C.M.P.
Gabion Retaining Wall
Fountain
FountainTop of Bank
Gate
Rail Fence
Rhododendron
Rhododendron
Wetlands Area
B rid ge
Gravel Trail
C.M.P.
R.C.P.
= Water Valve
= Rock Wall
= Power Pole
= Corrugated Metal Pipe
= Reinforced Concrete Pipe
= Drainage or Ditch Line
= Control Point
= Sanitary Sewer Manhole
LEGEND
C.P.P. = Corrugated Plastic Pipe
= Grill
ROADSIDE LOOP
SITE
REMOVE EXISTING
2-UNIT VAULT TOILET
Dump Station
REMOVE
R.ROOM BLDG.
WELLHOUSE
OBLITERATE
CAMPSITE #10
REMOVE
INFO. KIOSK
REMOVE BAR
SCREEN BOX
REMOVE DUMP STA.
TOWERS AND BASIN
REPLACE
ALL HYDRANTS
REMOVE P.POLE AND
SERVICE - COORD.
W/ DUKE ENERGY
REMOVE AND REPLACE
SPLIT-RAIL FENCE (TYP.)
REMOVE
SEWER MH
REMOVE
EXIST. PUMP STA.
REPLACE
HYDRANT
ALL CAMPSITES TO BE RECONSTRUCTED
REMOVE AMMENITIES, TIMBER CURBING,
RET. WALLS, STEPS AND SIGNAGE (TYP.)
REMOVE AND
REPLACE TOP 2
ROTTED TIMBER
WALL MEMBERS
REPLACE
(4) CULVERTS
(R08)
SOUTHERN REGION
NORTH MILLS RIVER
CAMPGROUND
RECONSTRUCTION
PISGAH NATIONAL
FOREST
PISGAH RANGER DISTRICT
MARCH 2026
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
DATE
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
DRAWN
DESIGNER
DRAWING SCALE
1" = 30'
ROADSIDE LOOP
EXISTING SITE
AND
DEMOLITION PLAN
EXIST. GRAVITY SEWER
TO BE REMOVED
REPLACE
ROOFING
REPLACE
EXIST. CULVERT
REMOVE D.I.P. SEWER AND
PIERS
REMOVE
EXISTING
GATES
REMOVE GRAVEL AND
RENATURALIZE
REMOVE ASPHALT PAVEMENT BY MILLING. SCARIFY THE
EXISTING BASE AND MIX WITH THE MILLED MATERIAL.
PLACE A 4" MIN. LOOSE DEPTH LAYER OF ABC STONE OVER
MIXED MATERIAL AND COMPACT TO 90% OF THE MATERIAL'S
MOST RECENT AASHTO T-180 TEST RESULTS. FIELD TEST
BASE COMPACTION BY THE CONVENTIONAL METHOD OR THE
NUCLEAR GAUGE METHOD. (REF. SECTION 520 OF NCDOT SPECS)
Feet
Foot Bridge
MA
NA
GE
R'S
Gabion Retaining Wall
Top of Bank
ROADSIDE LOOP
Rhododendron
Wetlands Area
B rid ge
SIT
E
WELLHOUSE
PLACE 2" DEPTH X 11 FT. WIDTH
COMPACTED NCDOT S9.5B BITUMINOUS
PAVEMENT SURFACING (TYP.)
NEW
HYDRANT
NEW ROUND-RAIL
FENCE (TYP.)
EXCAVATE V-SHAPED
DRAINAGE DITCH
NEW RV
DUMP STA.
SOUTHERN REGION
(R08)
PISGAH NATIONAL
FOREST
United States Department of Agriculture Forest Service
NORTH MILLS RIVER
CAMPGROUND
RECONSTRUCTION
PISGAH RANGER DISTRICT
MARCH 2026
PROJECT NAME
DRAWING TITLE
DATE
DRAWING SHEET NO.
DRAWN
DESIGNER
DRAWING SCALE
1" = 30'
ROADSIDE LOOP
NEW CAMPING SITES
AND UTILITIES
LAYOUT
STAMPS, LOGOS, AND SEALS
DATENO.
REVISION / ISSUE
REMOVE AND
REPLACE
ROTTED
TIMBERS
NEW
HYD.
CONNECT TO EXIST.
FORCED MAIN
2" FORCED MAIN
(OPEN TRENCH)
JACK & BORE
6" DIA. BLACK
STEEL CASING
NEW
B.HOUSE
REPLACE
ROOFING
EXISTING PACKAGED
PUMP STATION TO REMAIN
6 FT. WIDE
CONCRETE WALKWAY
PEDESTRIAN
X-ING
ACCESSIBLE
PARKING SPACE
NEW
MDP #1
6" GRAVITY
SEWER
NEW MDP #2
SEWER
MH #2
POWER PEDESTAL
(TYP.)
SEWER
MH #1
6" SEWER
DIR. BORING
9 FT. WIDE PAVED
PUMP STA. ACCESS
NEW GATE
NEW CONC.
DUMPSTER PAD
3-PANEL
KIOSK SLAB
PLACE 2" DEPTH
COMPACTED NCDOT S9.5B
BITUMINOUS PAVEMENT SURFACING
(TYP. ALL CAMPSITES PARKING SPACES)
4SEE MANAGER'S SITE
RECONSTRUCTION DETAILS
SHEET 28
R=24'
R=24'
PAVED VISITOR'S
PARKING
Feet
CONTROL POINTS COORDINATES
Northing ElevationPoint # Easting Description
12 5919.9786 4058.2929 2229.74 trav nail
CAMPSITES POINT COORDINATES
Northing GroundPoint # Easting Description
C
5901.22 4025.73
5899.44 4013.24
5900.96 3988.74
Elevation Finished Elevation
A B
Campsite Number
3944.11
F
5873.26
5852.18 3955.58
5871.34 3990.82
D E
5882.00 4009.40H
G 5881.05 3997.66
BEGIN CURBING
CURBING EXT. CORNER
END CURBING
RECONSTRUCTION LAYOUT
STAIRWAY SECTION
STAIRWAY PLAN
TIMBER WALL SECTION
2233.50
CONTROL POINTS COORDINATES
Northing ElevationPoint # Easting Description
9 5780.0891 4613.8677 2220.41 trav I. P.& Cap 10 6076.5621 4468.9957 2232.19 trav nail 11 6100.1229 4244.4505 2236.77 trav Magnail 12 5919.9786 4058.2929 2229.74 trav nail
CAMPSITES POINT COORDINATES
Northing GroundPoint # Easting Description
C
5876.72 4077.00
5878.79 4108.94
5902.74 4107.39
Elevation Finished Elevation
A B
Campsite Number
C
5921.32 4040.41
5932.73 4029.19
5961.89 4058.87
A B3
C
5925.55 4132.89
5927.61 4164.83
5951.56 4163.28
A B4
C
6000.13 4090.69
6036.95 4105.78
6032.49 4116.65
A B5
6016.59 4114.85
C
5962.75 4184.00
5964.81 4215.93
5988.76 4214.38
A B6
C
6058.62 4351.24
6045.99 4361.06
6040.72 4380.35
A B8
6100.99 4454.88
6108.03 4450.75
A B9
D
6124.82 4450.65C
6125.04 4484.43D
6095.13 4484.63E
CONTROL POINTS COORDINATES
Northing ElevationPoint # Easting Description
53 5983.0831 4588.8902 2227.30 trav nail
CAMPSITES POINT COORDINATES
Northing GroundPoint # Easting Description
C
6051.96 4533.88
6073.89 4534.27
6078.75 4530.74
Elevation Finished Elevation
A B
Campsite Number
F
6099.82 4538.29
6094.97 4551.81
6082.67 4562.23
D E
6073.59 4551.60
6049.46 4551.18
H I
G 6073.46 4558.93
B
5994.67 4600.50
6016.25 4602.80
A
6035.50 4585.75
6031.96 4618.89
D E
C 6018.26 4583.91
5991.86 4614.62F
2228.50
2228.50
2232.00
2230.94 2229.78
2234.50 2233.00
2233.00
CONTROL POINTS COORDINATES
Northing ElevationPoint # Easting Description
CAMPSITES POINT COORDINATES
Northing GroundPoint # Easting Description
C
6076.47 4193.40
6099.77 4188.30
6105.01 4212.31
Elevation Finished Elevation
A B
Campsite Number
F
6096.04 4297.71
6086.16 4232.27
6086.79 4208.20
D E
5943.19 4626.93
C
5951.85 4643.40
5953.15 4658.60
5936.92 4666.24
A B
5927.79 4664.20 F 5931.66 4647.99
5925.27 44636.34
D E
5905.29 4601.86
C
5878.47 4584.40
5851.97 4595.77
5878.78 4613.24
A B
G
11 6100.1229 4244.4505 2236.77 trav nail
52 5886.5394 4651.3020 2223.24 trav nail
2238.50 2238.50
2236.50
2236.00 2236.00
2226.00
2225.00
2224.50
2225.14
D
2224.50
6 7
A
B
C
D
3-PANEL INFO. KIOSK
SLAB
VISITOR'S
PARKING
FOUNDATION SLAB LAYOUT
C
SECTION C SECTION ASECTION B
KIOSK AND PARKING PROFILE
FRONT ELEVATION
CEILING JOIST PLAN
A B
DIRECTORY SPECIFICATIONS
ROOF RAFTERS PLAN
SECTION B
ELECTRICAL SERVICE DETAIL
NEW MDP #2 FRONT VIEW
GABLE END DETAIL
ROOF TRUSSES SECTION
ROOF TRUSSES PLAN
SECTION A
A
GENERAL NOTES:
A
NEW MDP #1 FRONT VIEW
M
B
C M
C
VALVE BOX DETAIL
YARD HYDRANT DETAIL
BACKFLOW PREVENTER VALVE DETAIL
United States Department of Agriculture Forest Service
NORTH MILLS RIVER
CAMPGROUND
RECONSTRUCTION
PISGAH NATIONAL
FOREST
PISGAH RANGER DISTRICT
MARCH 2026
PROJECT NAME
DATE
DRAWING SHEET NO.
DRAWN
DESIGNER
3/4" = 1'-0"
UTILITIES TRENCHING
TYPICALS
STAMPS, LOGOS, AND SEALS
United States Department of Agriculture Forest Service
DRIVEWAY CENTERLINE COORDINATES & ELEVATIONS
Northing Exist. ElevationPoint # Easting Description
BEGIN DRIVEWAY CENTERLINE
DRIVEWAY CENTERLINE
END DRIVEWAY CENTERLINE
Fin. Elevation
NORTH MILLS RIVER
CAMPGROUND
RECONSTRUCTION
PISGAH NATIONAL
FOREST
PISGAH RANGER DISTRICT
MARCH 2026
PROJECT NAME
DRAWING TITLE
DATE
DRAWING SHEET NO.
DRAWN
DESIGNER
DRAWING SCALE
1" = 10'
RV DUMP STATION
LAYOUT
2+12.15
0+39.58 5879.19 4275.68
86.73 5899.85 4237.69
1+70.49 5881.87 4155.88
5852.67 4130.10
2+50.46 5814.52 4126.58
0+00 5850.85 4301.88
NEW RV DUMP STATION LAYOUT
1685 SMH #1
R=4 2'
R=4 2'
R=24'
R=24'
R=42'
AB
C
D
E
F
G
H
I
J
K
A B C D E F G H I J K L
5824.48 4173.77
5825.75 4160.65
5873.08 4157.81
5891.06 4239.62
5857.48 4266.52
5843.40 4259.96
5855.67 4330.49
5882.35 4284.10
5908.64 4235.76
5890.66 4453.94
5861.98 4122.81
5833.12 4113.95
L
RV DUMP STATION LAYOUT
NON-POTABLE TOWER SIGNAGE POTABLE TOWER SIGNAGE
RV DUMP STATION PLAN VIEW
SEWERLINE PROFILE - PUMP STA. TO SEWER MANHOLE #2
SEWERLINE PROFILE - PUMP STA. TO STA. 1+78
SEWERLINE PROFILE - SEWER MH #2 TO RV DUMP STA. BUILDING SEWER DETAIL
SEWERLINE CLEANOUT TYP. DETAILSEWER M.H. #1 ORIENTATION SEWER M.H. #2 ORIENTATION
STANDARD MANHOLE TYPICAL
DETAIL B
DETAIL A
DROP MANHOLE TYPICAL
- PLAN VIEW -
- SECTION -
WETWELL SECTION
PUMPS HOIST DETAIL
WARNING SIGN DETAIL
PUMPS CONTROL PANEL MTNG. BOARD
FLOOR PLAN
LEFT SIDE ELEVATION FRONT ELEVATION
RIGHT SIDE ELEVATION
BLOCK VENTS SECTION
STEEL LINTEL BOX DETAIL
BUILDING CROSS SECTION
STAIRWAY PLAN VIEW
STAIRWAY RAILING SECTION
FOUNDATION LAYOUT
SECTION C
EXT. WALL INSULATION / ROCK VENEER SECTION
BEAM TRIM DETAIL
PORCH CEILING & SOFFIT DETAIL
PICTURE WINDOWS R.O.
PICTURE WINDOWS DETAIL
CUSTOM COLUMNS TOP PLATE DETAIL
ROOF FRAMING PLAN
END TRUSS DETAIL
TRUSSES DETAIL
VENTED RIDGE DETAIL
FLOATING RAKE DETAILEAVE DETAIL
NON-VENTED RIDGE DETAIL
PIPE PENETRATION DETAIL
NORTH MILLS RIVER
CAMPGROUND
RECONSTRUCTION
PISGAH NATIONAL
FOREST
PISGAH RANGER DISTRICT
MARCH 2026
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
DATE
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
DRAWN
DESIGNER
DRAWING SCALE
1" = 60'
SIGNAGE LAYOUT
AND SCHEDULE
NORTH M
ILLS RIVER
ROADSIDE LOOP
3 12
B A
B
A
A
B
SIGNS INSTALLATION DETAIL
SIGNAGE SCHEDULE
8 9
SIGNAGE SCHEDULE
NOTES:
SEE SHEET 18 FOR CAMPING SITES
NUMBERING DETAILS
Feet 0 60 12030
1"=60'
United States Department of Agriculture Forest Service
NORTH MILLS RIVER
CAMPGROUND
RECONSTRUCTION
PISGAH NATIONAL
FOREST
PISGAH RANGER DISTRICT
MARCH 2026
PROJECT NAME
DATE
DRAWING SHEET NO.
DRAWN
DESIGNER
3/4" = 1'-0"
DRAINAGE CULVERTS
SCHEDULE
STD. TEMPORARY SILT FENCE INSTALLATION DETAIL
EROSION CONTROL NOTES:
(R08)
SOUTHERN REGION
United States Department of Agriculture Forest Service
NORTH MILLS RIVER
CAMPGROUND
RECONSTRUCTION
PISGAH NATIONAL
FOREST
PISGAH RANGER DISTRICT
MARCH 2026
PROJECT NAME
DATE
DRAWING SHEET NO.
DRAWN
DESIGNER
3/4" = 1'-0"
EROSION
AND
SEDIMENTATION
CONTROL
STRAW BALES SILT CHECKS DETAIL NOTES:
DAY USE PARKING LOT SLOPE PROTECTION DETAIL
File details come from the government source that posted it. Updated .