C04_Attachment 2 - Specifications 1232SA26Q0642.pdf
PDF 207 KB Posted
- Attached to
- Replacement of Cooling Tower Base Federal contract opportunity
- Solicitation number
- 1232SA26Q0642
About this file
SPECIFICATION SUMMARY
This is a specification document for a federal contract opportunity with the U.S. Department of Agriculture detailing requirements for replacement of a cooling tower structural steel frame at the U.S. Horticultural Research Laboratory (USHRL) in Fort Pierce, Florida.
The contractor shall provide all labor, materials, equipment, supervision, permitting, disposal, testing, startup, warranty, and documentation necessary to remove and replace one cooling tower base. The scope of work includes complete removal and replacement of the existing cooling tower structural steel frame. Eight deliverables are required with specified due dates: a project schedule (15 days after contract award), safety plan (prior to mobilization), submittals including steel specifications and coatings (prior to procurement), removal completion notice (after demolition), steel frame inspection report (post-installation), commissioning report (at project completion), as-built drawings (final acceptance), and warranty documents meeting FAR 52.246-1 requirements (prior to final invoice in IPP). The delivery location is 2001 S. Rock Road, Fort Pierce, Florida, 34945. The primary point of contact is Earl Taylor at earl.taylor@usda.gov or 772-462-5802.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C05_Sol_1232SA26Q0642_Amd_0001.pdf | ||
| C05_Attachment 4 - Consolidated RFI Questions and Answers 1232SA26Q0642.pdf | ||
| Site Visit Information 1232SA26Q0642.pdf | ||
| C04_Solicitation_1232SA26Q0642.pdf | ||
| C04_Attachment 1 - SOW 1232SA26Q0642.pdf | ||
| C04_Attachment 3 - Wage Determination FL20260228.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
1.0 Specifications Description:
Replacement of Cooling Tower Base
Quantity: One (1)
Unit Type: Cooling Tower Base
Minimum Requirements:
The Contractor shall provide all labor, materials, equipment, supervision, permitting, disposal, testing, startup, warranty, and documentation necessary to remove and replace the cooling tower structural steel frame located at the U.S. Horticultural Research Laboratory (USHRL)
2.0 Place of Delivery
U.S. Horticultural Research Laboratory
2001 S. Rock Road, Fort Pierce, Florida, 34945
3.0 Delivery Schedule
Item No. Deliverable Objective Due 1 Project Schedule Establish milestones and sequencing 15 days after contract award
2 Safety Plan Compliance with OSHA and site requirements
Prior to mobilization
3 Submittals (Steel specs, coatings, etc.)
Ensure conformance with ARS standards
Prior to procurement
4 Removal Completion Notice
Confirm safe removal of existing steel frame
After demolition
5 Steel Frame Inspection Report
Document structural integrity Post-installation
6 Commissioning Report Verify system operational performance
At project completion
7 As-Built Drawings Accurate final documentation Final acceptance 8 Warranty Documents Meet FAR 52.246-1 requirements Prior to final invoice in IPP
4.0 Delivery Point of Contact
Earl Taylor: earl.taylor@usda.gov 772462-5802 mailto:earl.taylor@usda.gov