SPECIFICATION SUMMARY

This is a specification document for a federal contract opportunity with the U.S. Department of Agriculture detailing requirements for replacement of a cooling tower structural steel frame at the U.S. Horticultural Research Laboratory (USHRL) in Fort Pierce, Florida.

The contractor shall provide all labor, materials, equipment, supervision, permitting, disposal, testing, startup, warranty, and documentation necessary to remove and replace one cooling tower base. The scope of work includes complete removal and replacement of the existing cooling tower structural steel frame. Eight deliverables are required with specified due dates: a project schedule (15 days after contract award), safety plan (prior to mobilization), submittals including steel specifications and coatings (prior to procurement), removal completion notice (after demolition), steel frame inspection report (post-installation), commissioning report (at project completion), as-built drawings (final acceptance), and warranty documents meeting FAR 52.246-1 requirements (prior to final invoice in IPP). The delivery location is 2001 S. Rock Road, Fort Pierce, Florida, 34945. The primary point of contact is Earl Taylor at earl.taylor@usda.gov or 772-462-5802.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

1.0 Specifications Description:

Replacement of Cooling Tower Base

Quantity: One (1)

Unit Type: Cooling Tower Base

Minimum Requirements:

The Contractor shall provide all labor, materials, equipment, supervision, permitting, disposal, testing, startup, warranty, and documentation necessary to remove and replace the cooling tower structural steel frame located at the U.S. Horticultural Research Laboratory (USHRL)

2.0 Place of Delivery

U.S. Horticultural Research Laboratory

2001 S. Rock Road, Fort Pierce, Florida, 34945

3.0 Delivery Schedule

Item No. Deliverable Objective Due 1 Project Schedule Establish milestones and sequencing 15 days after contract award

2 Safety Plan Compliance with OSHA and site requirements

Prior to mobilization

3 Submittals (Steel specs, coatings, etc.)

Ensure conformance with ARS standards

Prior to procurement

4 Removal Completion Notice

Confirm safe removal of existing steel frame

After demolition

5 Steel Frame Inspection Report

Document structural integrity Post-installation

6 Commissioning Report Verify system operational performance

At project completion

7 As-Built Drawings Accurate final documentation Final acceptance 8 Warranty Documents Meet FAR 52.246-1 requirements Prior to final invoice in IPP

4.0 Delivery Point of Contact

Earl Taylor: earl.taylor@usda.gov 772462-5802 mailto:earl.taylor@usda.gov