C04 Attachment 2 - SOI Tony Grove.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest
Solicitation number
1240BH27Q0002
Issued by

About this file

This is a Schedule of Items (SOI) pricing template for the Tony Grove Dam Spillway Capacity & Seismic Mitigation project under solicitation 1240BH27Q0002 issued by the Department of Agriculture Forest Service for the Logan Ranger District of the Uinta/Wasatch/Cache National Forest. The SOI provides a blank pricing template that contractors must complete by submitting unit prices for all line items, which are then auto-calculated to generate extended prices. The base item includes 25 line items covering site preparation, excavation, fill materials, concrete structures, piping, gates, slope protection, and quality control activities. Estimated quantities include 7,100 cubic yards of unclassified excavation, 9,450 cubic yards of earthfill, 1 acre of clearing and grubbing, 3,450 square yards of articulated concrete block slope protection, and various concrete structures and pipe installations. Two optional items are included: Option #1 for a precast concrete vault restroom and Option #2 for hot mix asphalt paving of 9,290 square feet.

Contractors must submit unit prices for all base and option items, with the understanding that unit prices will govern in case of calculation errors. The solicitation is a total small business set-aside with a small business size standard of $45 Million, issued under NAICS code 237990. Per the submission notes, contractors must verify all calculations and pricing data as the Government is not liable for errors, and submission of the SOI represents the contractor's commitment to the pricing provided. Payment for bond premiums may be included under Mobilization costs and shall not be in addition to the contract price. One award will be made from this solicitation, and the Government reserves the right to award for quantities less than stated in the SOI.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI Tony Grove

GAOA TONY GROVE DAM SPILLWAY CAPACITY & SEISMIC MITIGATION

LOGAN RANGER DISTRICT

UINTA/WASATCH/CACHE NATIONAL FOREST

1240BH27Q0002

SCHEDULE OF ITEMS
ITEM NUMBERBID ITEM NUMBERBASE ITEM 0001PAY UNITEST QTYPRICETOTAL
0001AA1Clearing, Grubbing, and StrippingAcre1$ - 0$ -
0001AB2Pollution ControlLump Sum1$ - 0$ -
0001AC3Construction SurveysLump Sum1$ - 0$ -
0001AD4Mobilization & DemobilizationLump Sum1$ - 0$ -
0001AE5Removal of WaterLump Sum1$ - 0$ -
0001AF6Unclassified ExcavationCu. Yd.7100$ - 0$ -
0001AG7EarthfillCu. Yd.9450$ - 0$ -
0001AH8RoadbaseCu. Yd.630$ - 0$ -
0001AI9Filtered SandCu. Yd.925$ - 0$ -
0001AJ10Gravel DrainCu. Yd.25$ - 0$ -
0001AK11Reinforced Concrete, Intake StructureLump Sum1$ - 0$ -
0001AL12Reinforced Concrete, Gate Hoist StructureLump Sum1$ - 0$ -
0001AM13Reinforced Concrete, Outlet StructureLump Sum1$ - 0$ -
0001AN14Reinforced Concrete, Pipe EncasementLump Sum1$ - 0$ -
0001AO15Reinforced Concrete, Water Level IndicatorLump Sum1$ - 0$ -
0001AP1630-inch HDPE Outlet PipeLin. Ft.138$ - 0$ -
0001AQ173-inch HDPE Vent PipeLin. Ft.70$ - 0$ -
0001AR186-inch HDPE Slotted Drain PipeLin. Ft.176$ - 0$ -
0001AS19Steel Pipe Elbow FittingLump Sum1$ - 0$ -
0001AT20Precast ManholeEach2$ - 0$ -
0001AU21Articulated Concrete Block Slope ProtectionSq. Yd.3450$ - 0$ -
0001AV2230-inch Slide GateEach1$ - 0$ -
0001AW23InstrumentationLump Sum1$ - 0$ -
0001AX24Quality ControlLump Sum1$ - 0$ -
0001AY25Field Office and LaboratoryLump Sum1$ - 0$ -
TOTAL BASE ITEM 0001$ -
ITEM NUMBERBID ITEM NUMBEROPTION #1 ITEM 0002PAY UNITEST QTYPRICETOTAL
0002AAA-1Precast Concrete Vault RestroomLump Sum1$ - 0$ -
TOTAL OPTION ITEM 0002$ -
ITEM NUMBERBID ITEM NUMBEROPTION #2 ITEM 0003PAY UNITEST QTYPRICETOTAL
0003AAA-2Hot Mix AsphaltSq. Ft.9290$ - 0$ -
TOTAL OPTION ITEM 0003$ -

TOTAL BASE + OPTION ITEMS $ -

NOTE 1: Contractor input Unit Prices
NOTE 2: Auto Calculated Values
NOTE 3: One award will be made from this solicitation. Contractor's must submit pricing for all items. In the event of an error in extending the proposed prices, unit prices will govern, unless otherwise determined by the Contracting Officer, in accordance with applicable regulations. The Government reserves the right to make award for quantities less than stated in the SOI. Option items may be awarded in any order. SOI is set up to round to the nearest dollar.
NOTE 4: Submission of the SOI represents the Contractors commitment to the data herein. It is the responsibility of the Contractor to verify that all values presented in the SOI, including auto-calculated cells, accurately represent the Contractor's intended price elements. The Government shall not be held liable for any errors in calculation or pricing data.
NOTE 5: Payment for bond premiums in accordance with AGAR Clause 452.232-71, Progress Payments for Commercial Construction Contracts, shall not be in addition to the contract price, but may be included under Mobilization.

CONTRACTOR NAME:

SAM UEI #:

DATE: