This is a Schedule of Items for a road surfacing and stabilization services contract with the Springerville Ranger District of Apache-Sitgreaves National Forests in Apache County, Arizona, under solicitation NFSR 249E.
The contract includes four base line items: (1) Mobilization and Bonding as a lump sum for one unit; (2) Roadway Aggregate 1" minus with an estimated quantity of 12,617 tons, including haul, placement, stabilization, and compaction using Method 2 per SOW C.5, Table 31-2, Gradation G; (3) Road Reconditioning for 5.29 miles; and (4) Dust Palliative Type 80/20 Lignin Sulfonate/Magnesium Chloride Blend at 1.0 gallon per yard for an estimated 68,276 gallons. Water is incidental to items 302.01, 303.01, and 312.01. The schedule also includes three optional line items that correspond to the base items with reduced quantities: 239 tons of roadway aggregate, 0.1 mile of road reconditioning, and 1,291 gallons of dust palliative. Option items will be awarded in 0.1-mile increments, as funding allows, and prior to issuance of the Notice to Proceed. Contractors are required to submit unit prices and total prices for each line item to calculate the Base Items Total and optional pricing.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C05 127EAX26Q0071 0001.pdf | ||
| C05 RFI Log 001-020 answered.docx | DOCX document | |
| C04 127EAX26Q0071.pdf | ||
| C04 Attachment 3 MAP.pdf | ||
| C04 Attachment 5 Aggregate Specifications.pdf | ||
| C04 Attachment 1 Statement of Work.docx | DOCX document | |
| C04 Attachment 8 BioPreferred.pdf | ||
| C04 Attachment 9 Wage Determination AZ20260023 Mod 1.pdf | ||
| C04 Attachment 4 Spec Aggregates for Earthwork.pdf | ||
| C04 Attachment 6 Specs FP-14.docx | DOCX document | |
| C04 Attachment 7 Fire Plan.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Items Section B - Services and Prices
NFSR 249E Road Surfacing and Stabilization
Springerville Ranger District
Apache-Sitgreaves National Forests
Apache County, Arizona
B-1 Schedule of items
Item No. Description Pay Unit Est.
Quantity Unit Price Total Price
151.01 Mobilization and Bonding
Lump
Sum 1 $ $
302.01 Roadway Aggregate 1" minus
(SOW C.5, Table 31-2, Gradation G).
Includes haul, placement, stabilization and compaction Method 2. Water is incidental to this line item
Ton 12617 $ $
303.01 Road Reconditioning. Water is incidental to this
line item
Mile 5.29 $ $
312.01 Dust Palliative, Type 80/20 Lignin
Sulfonate/Mag Chloride Blend, 1.0 gal/yd.
Water is incidental to this line item
Gallon 68276 $ $
Base Items Total $
Option Items
Item No. Description Pay Unit Est.
Quantity Unit Price Total Price
O302.01 Roadway Aggregate 1" minus
(SOW C.5, Table 31-2, Gradation G).
Includes haul, placement, stabilization and compaction Method 2. Water is incidental to this line item
Ton 239 $ $
O303.01 Road Reconditioning. Water is incidental to this line item Mile 0.1 $ $
O312.01 Dust Palliative, Type 80/20 Lignin
Sulfonate/Mag Chloride Blend, 1.0 gal/yd.
Water is incidental to this line item
Gallon 1291 $ $
Note: Option Items will be awarded in 0.1 mile $ increments, will be awarded as funding allows, and will be awarded prior to Notice to Proceed