This document consists of construction and electrical design specifications and site plans for a new awning structure installation at a USDA ARS Pecan Breeding/Genetics facility. The project encompasses a 125-foot by 36-foot awning to be constructed on the south side of an existing 40-foot by 100-foot building, with an additional 36-foot depth extension area for the new awning footprint.
The concrete foundation requirements include round piers extending 48 inches below grade with bell bottoms and #4 reinforcing bar, utilizing 3,000-pound concrete with top pads extending minimum 2 inches below grade. Vertical support columns are spaced every 4 inches apart, and base anchors must meet metal building structure requirements with rebar extending into top pads and fully encased after pouring. The site plan indicates five existing column supports within the building footprint, receptacle and lighting locations, and a 100-ampere electrical panel. The electrical layout specifications show required loads (LP#10, LP#2, LP#1, LP#3) distributed across the awning structure, with provisions for new lighting circuits, existing light removal, and transformer connections. Site preparation includes extending concrete and caliche 4 feet past the new awning with a 4-inch slab base 12 inches wide perimeter, installation of a sliding gate on the north side, and replacement or stretching of existing perimeter fencing as necessary. No response dates, award information, or pricing terms are specified in these technical specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C05_Sol_1232SA26Q0981_Amd_0001.pdf | ||
| C04_Attachment 4 - RFI Questions and Answers.pdf | ||
| C04_Solicitation_1232SA26Q0981.pdf | ||
| C04_Attachment 1 SOW 1232SA26Q0981.doc | DOC document | |
| C04_Site Visit Information 1232SA26Q0981.pdf | ||
| C04_Attachment 3 Wage Determination TX20260235.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1: Aerial view of site.
Location of new awning
Attachment 2: 3D image
Notes:
1. Round pier to be a depth of 48" from grade, belled at the bottom and reinforced with #4 Bar.
2. 3000# concrete
3. Top pad to extend a minimum of 2" below grade.
4. Finished surface elevation of top pad to be determined by framing dimensions as to allow the finished roof line to be a continuation of the existing roof line.
5. Where portal framing is used the top pad and pier should be configured to accommodate for the additional column and base plate.
6. Base Anchors to meet requirements of metal building structure
7. Extend pier rebar into top pad
8. Rebar to be installed and supported as to not make ground contact and be fully encased after pour
1'
3'-10"
Grade
2'-6"
1'-6"
1'
Attachment 3: Concrete footing
Verticals to be spaced every 4" apart
| attachment 1 aerial view |
| Attachment 2 3DBuild.DXF |
| Attachment 3 Concrete footing |
| Attachment 4 AwningGradeMeasurments |
| attachment 5 Electrical |
| Attachment 6 New layout |