C04 - 8 - Special Project Specifications.pdf
PDF 140 KB Posted
- Solicitation number
- 127EAW26Q0043
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a specifications list for the Dillon Fire Baer and Suppression Road Repair project on the Six Rivers National Forest. The solicitation incorporates by reference the Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects issued in 2024 (FP-24), along with Forest Service Supplemental Specifications (FSSS).
The applicable FP-24 standard specifications cover 25 sections addressing general contract administration (terms, bid award, scope, control, acceptance, legal relations, prosecution and progress, measurement and payment), mobilization, construction survey and staking, contractor quality control and testing, construction schedules, traffic control (both permanent and temporary), and specific construction work including clearing and grubbing, excavation and embankment, riprap, aggregate courses, road reconditioning, culverts and drains, and existing drainage structure repairs. The FSSS supplements these standards with revisions dating from 2016 to 2020, providing Forest Service-specific requirements for terms and definitions, bid and award procedures, scope of work, control of work, acceptance of work, legal relations, prosecution and progress, measurement and payment, construction schedules, removal of structures and obstructions, minor crushed aggregate, asphalt tack coat, and aggregate specifications. These specifications become binding requirements of the resulting contract.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dillon Fire Baer and Suppression Road Repair Six Rivers NF
Special Project Specifications are physically incorporated within this solicitation, beginning after the list of applicable Standard Project Specifications.
The following Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects issued in 2024 (FP-24) are applicable to this contract:
APPLICABLE FP-24 STANDARD SPECIFICATIONS
DAT
E Section 101. — TERMS, FORMAT, AND DEFINITIONS 2024 Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT 2024 Section 103. — SCOPE OF WORK 2024 Section 104. — CONTROL OF WORK 2024 Section 106. — ACCEPTANCE OF WORK 2024 Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC 2024 Section 108. — PROSECUTION AND PROGRESS 2024 Section 109. — MEASUREMENT AND PAYMENT 2024 Section 151. — MOBILIZATION 2024 Section 152. — CONSTRUCTION SURVEY AND STAKING 2024 Section 153. — CONTRACTOR QUALITY CONTROL 2024 Section 154. — CONTRACTOR SAMPLING AND TESTING 2024 Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS 2024 Section 156. — PUBLIC TRAFFIC 2024 Section 201. — CLEARING AND GRUBBING 2024 Section 204. — EXCAVATION AND EMBANKMENT 2024 Section 251. — RIPRAP 2024 Section 301. — UNTREATED AGGREGATE COURSES 2024 Section 303. — ROAD RECONDITIONING 2024 Section 602. — CULVERTS AND DRAINS 2024 Section 607. — CLEANING, RELAYING, AND REPAIRING EXISTING DRAINAGE
STRUCTURES 2024
Section 633. — PERMANENT TRAFFIC CONTROL 2024 Section 635. — TEMPORARY TRAFFIC CONTROL 2024
Dillon Fire Baer and Suppression Road Repair Six Rivers NF
The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.
The following Forest Service Supplemental Specifications (FSSS) to the FP-24 are applicable to this contract:
Description Revision Date Preface 5/14/2020 101 - Terms, Format, and Definitions 11/9/2016
101.01 Meaning of Terms 11/9/2016
101.03 Abbreviations. 11/9/2016
101.04 Definitions. 1/22/2020
102 - Bid, Award, and Execution of Contract 11/9/2016 103 - Scope of Work 11/9/2016 104 - Control of Work 11/9/2016
104.06 Use of Roads by Contractor 11/9/2016
106 - Acceptance of Work
106.01 Conformity with Contract Requirements. 7/18/2017
106.02 Visual Inspection 11/9/2016
106.07 Partial and Final Acceptance 11/1/2016
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims. 7/18/2017
108 - Prosecution and Progress 11/9/2016 109 - Measurement and Payment 11/9/2026
109.01 Measurement of Work 2/22/2019
109.02 Measurement Terms and Definitions 11/9/2016
155 - Schedules for Construction Contracts 11/9/2016 203 - Removal of Structures and Obstructions
203.04 (b) General. 11/2/2016
203.05 Disposing of Material. 9/10/2018
302 – Minor Crushed Aggregate
302.04 Placing Crushed Aggregate
302.05 Compacting and Finishing Crushed Aggregate
412 – Asphalt Tack Coat
412.05 Weather Limitations
703 – Aggregate
703.05 Subbase, Base, Surface Course, and Screened Aggregate
File details come from the government source that posted it. Updated .