C04 - 5 - Attachment 5 Map OSDs 127EAW26Q0056.pdf
PDF 726 KB Posted
- Solicitation number
- 127EAW26Q0056
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a road maintenance map for fiscal year 2026 issued by the U.S. Department of Agriculture (USDA) Forest Service. The map depicts two Forest Service roads requiring maintenance work in what appears to be a mountainous terrain in the Okanogan-Wenatchee National Forest area. FS Road 2N47 spans 15.2 miles and is designated for Off-Highway Vehicle (OHV) use, while FS Road 3N22 spans 1.5 miles and is also OHV-designated. The map identifies specific maintenance activities required, including oversize drain work at multiple points along FS Road 2N47 marked with yellow circles and dozer work along both road segments. Elevation markers ranging from 3,518 feet to 5,162 feet indicate the mountainous nature of the roads. Cleghorn Road (2N47) is also referenced on the map.
The document serves as a planning and reference tool for the 2026 maintenance season, providing geographical visualization of the work areas and scope of maintenance activities. The map indicates that drainage improvements and dozer work are the primary maintenance activities needed to maintain these forest service roads for continued OHV access and general road condition management.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
¯Road Maintenance 2026 OSD Map 2
3518 ft
F S R o ad
3N2 ft ft
4283 ft
3950 ft
C le g h or n R d 2N ft
4324 ft
5154 ft
5162 ft
4009 ft
FS R
oad
2N47
4 0 ft
4127 ft
3N22
2N
Legend
2N47 - Overside Drains
Dozer Work Road Number - Miles
2N47 - 15.2 (OHV)
3N22 - 1.5 (OHV)
File details come from the government source that posted it. Updated .