This is Amendment A00001 to Solicitation 127EAW26Q0056, a Request for Quotation (RFQ) issued by the USDA Forest Service for road maintenance services on the San Bernardino National Forest in California. The amendment provides responses to 26 Request for Information (RFI) submissions from potential bidders. The solicitation is a Total Small Business Set-Aside with a performance period of 75 calendar days from the Notice to Proceed, with work completion required no later than December 31, 2026. All quotations are due by August 24, 2026, at 3:00 PM PST, submitted via email to the Contracting Officer Jeremy Bedner (Jeremy.Bedner@usda.gov).
The project scope encompasses approximately 60.94 miles of road blading using dozers and 1.38 miles of drainage restoration across fifteen roads on three Ranger Districts, including installation of seven overside drains and new rolling dips on unsurfaced roads. Key clarifications from the RFI responses include: all work is limited to Schedule of Items line items with dust abatement considered incidental; no water is required; additional rolling dips and leadoffs must be installed when necessary for erosion control; dozer equipment is mandatory for road blading work; no rock breaker or fire patrolperson is required; road maintenance can occur all day on PALS Level E days, though installation of corrugated metal spillways and rolling dips are prohibited on Level E days and limited to 1:00 PM on Level Ev days. Flumes will be provided free by the government without onsite forklifts available; no mulching, hydroseeding, log relocation, soil borrow sites, or import/export is required. Construction Wage (Davis-Bacon) rates apply, and contractors with Class A licensure are eligible to bid. The road must remain open during work, with staging permitted on the roadway.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED 16C. DATE SIGNED
PAGE OF PAGES
CODE
(X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
A00001
6. ISSUED BY
USDA FOREST SERVICE
PROCUREMENT OPERATIONS
CONSTRUCTION AND A-E DIVISION, WEST
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)
ALL OFFERORS
9A. AMENDMENT OF SOLICITATION NUMBER
127EAW26Q0056
1 6
8/21/2026
9B. DATED (SEE ITEM 11)
7/23/2026
1172121
7EAW
X 1
X
14. DESCRIPTION OF AMENDMENT/MODIFICATION
Solicitation: 127EAW26Q0056 Project Name: Road Maintenance including OHV, san Bernardino National Forest
Amendment A00001 The purpose of this solicitation amendment is to provide Request For Information responses. See page 2 for additional information.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
JEREMY BEDNER
AMENDMENT OF SOLICITATION 127EAW26Q0056
CONTINUATION PAGE
1. Attachment 3 Specifications includes numerous items for road maintenance. Will all of these items be required? Or is work limited to the pay items as listed in the Schedule of Items? For example, will Dust Abatement be considered incidental to the work?
RESPONSE: Work is limited to the work items listed in the schedule of items.
2. Will water be required for any of the work?
RESPONSE: No
3. Will additional rolling dips/ leadoffs be required to address rill and gully erosion on the road surfaces?
RESPONSE: Yes, install additional rolling dips/leadoffs when necessary.
4. In Attachment 2, Attachment 3 Schedule of Items, will all blading work need to be completed with a dozer? Or can a motor grader also be used?
RESPONSE: A dozer must be used for road blading.
5. What is the expectation for the roads that are excessively rocky where there is no material available for a dozer or grader. An example is the southeast end of 3N34 which is now predominantly bedrock since most fines have eroded. Should we factor in cost for bringing in a breaker for that level of effort?
RESPONSE: A rock breaker will not be required.
6. According to the PALS, road maintenance can occur all day, even in E. Is this correct for this RFP?
Or will work need to stop at 1PM during certain Levels?
RESPONSE: Yes road maintenance can happen all day even on an PALS level E day.
Install 24” Corrugated Metal Spillway (Overside Drain) W/ 10’ Flume (Ohv) And Rolling Dip is consider construction, so it is prohibited on PALS level E days and on PALS level Ev days work allowed until 1PM.
7. The PALS requires a Fire Patrolperson unless it’s “Specified Road construction jobs”. Should a Fire Patrolperson be included for this bid?
RESPONSE: A patrolperson will not be required.
8. Statement of Work references “Headwalls for Overside Drains can be fabricated at most sheet metal shops. The locations for the existing cache of flumes are as follows: Del Rosa Fire Station back boneyard. 4121 Quail Canyon Rd, San Bernardino, CA 92404”
Are Contractors to assume flumes will be provided free of charge from the government? And will Contractors be required to bring their own fork lift to pull flumes from the stacks? Or is equipment available on site for this? Can a drawing for the modified sheet metal headwall and starter design be provided? Or will Big Mac inlets and starters need to be purchased? Please provide specification drawings for all elements of the drains to be installed. Will rock energy dissipaters be required at discharge points?
RESPONSE: Flumes will be provided free of charge. There are no forklifts onsite. Rock dissipater will not be required.
The drawing details for 24" Headwall OSD is now included. Added as Attachment 10A.
9. In the Statement of Work, 2.0 Background it states “Proposed work must be estimated using bulldozer.” In the Schedule of Items 811, should all grading be estimated using a bulldozer, even if sections can be effectively graded with a motor grader?
RESPONSE: Work shall be estimated using a bulldozer.
10. Specification 839 Restore Drainage states, “Existing drainage dips shall be cleaned and the out-slope gradient sufficiently restored to remove surface water from roadbed, conducting the water through drainage facilities.” Is the intent of the Restore Drainage Function line item to just “provide out-slopes to drainage features” or to actually reconstruct rolling dip features?
RESPONSE: The intent of Specification 839 Restore Drainage is to rebuild the rolling dip.
11. Should roadside brushing be considered incidental to the work and included in the estimate when necessary? Or will that be completed by others?
RESPONSE: Roadside brushing is not required.
12. Please confirm which Wage Determination (WD) applies to this project. The bid documents include a Davis-Bacon Wage Determination; however, since this appears to be a maintenance project, please clarify whether the applicable WD is the Davis-Bacon WD included in the bid package or whether a Service Contract Act (SCA)/Service Contract Wage Determination should be used instead.
Response: Construction Wage (Davis-Bacon) Rates apply to this project and associated contract. Work Item Install 24” Corrugated Metal Spillway (Overside Drain) W/ 10’ Flume (Ohv) And Rolling Dip is classified as construction.
13. Will there be water provided for the contract? Fire hydrant?
RESPONSE: No, water is not required.
14. Can an A license contractor bid this project?
RESPONSE: Yes
15. Can we close the road while working on the project?
RESPONSE: No, the road shall remain open.
16. Can we Stage on the road?
RESPONSE: Yes
17. Does this project require import? Export?
18. Can you please confirm the number of working days? 60 days? 90 days?
RESPONSE: Period of performance is 75 days from the Notice of Proceed. Additionally, work must be completed NLT December 31, 2026. Solicitation pages 1, 4, 5 are revised and attached.
The Statement of Work Attachment 2 is revised and attached.
19. Is any Rock breaking required?
20. Is there a soil borrow site?
RESPONSE: There are no borrow sites.
21. Is mulching or hydroseeding required in this contract?
22. Is there any log relocation?
23. Do we fill over big boulders on the road?
RESPONSE: Yes boulders should be filled over if material is available.
24. Can we pump water near by natural sources?
25. Will a motor grader be required to grade after the dozer?
RESPONSE: No.
26.
RESPONSE:
A. Quantity 60.94 (OHV) and 1.38 (CMRD) is the total miles for both blading and drainage restoration.
B. The Maps and the Schedule of Items are accurate.
C. The scope of work is road and drainage maintenance: road blading and restoring existing drainage features including installation of OSDs.
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
1164791
USDA FOREST SERVICE
PROCUREMENT OPERATIONS
CONSTRUCTION AND A-E BRANCH WEST
JEREMY BEDNER
7EAW
CONTRACTING OFFICER
Jeremy Bedner
Contracting Officer via email only Jeremy.Bedner@usda.gov
JEREMY BEDNER 530-796-7473
NA
07/30/2026
127EAW26Q0056
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Solicitation: 127EAW26Q0056
Project Name: Road Maintenance Annual FY26 OHV. San Bernardino National Forest, California
Set Aside: Total Small Business Set Aside
See Section "Required Quote Submission Documents" for the Documents to Submit with
Your Proposal, Site Visit Information, and Requests for Information.
All quotes shall be emailed to the Contracting Officer Jeremy.Bedner@usda.gov no later than August 24, 2026, by 3P PST.
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 calendar days and complete it within ________________ 60 ___________75_____ calendar days after receiving
08/24/2026
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d) jbedner Cross-Out jbedner Highlight
Road Maintenance OHV San Bernardino NF Solicitation 127EAW26Q0056
REPLACEMENT Page | 4
Acquisition Description This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Overhaul Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued.
Solicitation number 127EAW26Q0056 is issued as a Request for Quotation (RFQ) for the Road Maintenance Annual FY26 OHV Project located on the San Bernardino National Forest, California.
This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
The applicable North American Industry Classification Standard Code is 237310 - Highway, Street, and Bridge Construction Contractors. The small business size standard is $45M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
This document titled "127EAW26Q0056 - Road Maintenance Annual FY26 OHV" encompasses details pertaining to applicable clauses, instructions, and evaluation criteria.
Statement of Requirement The purpose and intent of this project is to provide road and drainage maintenance for fifteen roads on three Ranger Districts of the San Bernardino National Forest. 60+ miles of road blading and restoring existing drainage features along with installing seven overside drains and new rolling dips on an unsurfaced road.
See Attachment 1. Statement of Work for additional information
Schedule Of Items
The Contractor is required to complete the Schedule of Items, as detailed in Attachment 2, and submit it as part of their quotation package.
Technical Data Technical data and supporting documentation associated with this solicitation are available through the following sources:
Solicitation Attachments The following documents are included as attachments to this solicitation and can be accessed via the “Attachments/Links” section of the posting.
• Attachment 1. Statement of Work REVISED AMENDMENT 1
• Attachment 2. Schedule Of Items
• Attachment 3. Specifications
• Attachment 4. Maps 1-4 Roads
• Attachment 5. Map OSDs
• Attachment 6. Map Project Vicinity
• Attachment 7. Fire Plan
• Attachment 8. Davis-Bacon Act WD # CA20260007 – 18 May 2026
• Attachment 9. Contract Administration Information http://www.acquisition.gov/
Road Maintenance OHV San Bernardino NF Solicitation 127EAW26Q0056
REPLACEMENT Page | 5
• Attachment 10. RFI Form
• Attachment 10A. OSD Detail
Project Location
See solicitation attachment “1. Statement of Work”
Definitization of Equitable Adjustments for Change Orders - Pursuant to FAR 36.101-4(b), information regarding USDA’s definitization of equitable adjustments for change orders under construction contracts may be found at Contracting with USDA under “Federal Acquisition Regulation 36.101-4”. USDA’s procedures that apply to the definitization of equitable adjustments for change orders under construction contracts may be found in AGAR
443.304 -70.
Federal Acquisition Regulation (FAR) and United States Department of Aquiculture Acquisition Regulation (AGAR) Clauses and Provisions The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation. The terms and conditions set forth herein supersede all other terms and conditions.
Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.
As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
52.252-2 Clauses Incorporated by Reference Feb 1998 This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Nov 2025)
This is a commercial construction acquisition. FAR 52.212-4 is amended as follows:
(b) Inspection/Acceptance. Inspection and Acceptance will be conducted in accordance with FAR 52.246-12, Inspection of Construction (Aug 1996).
(d) Changes. Changes will be handled in accordance with the following FAR clause(s):
☒ FAR 52.243-4, Changes (Nov 2025)
52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.222-50 Combating Trafficking in Persons (Nov 2025) 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) https://www.usda.gov/about-usda/general-information/staff-offices/departmental-administration/office-contracting-and-procurement-ocp/policies-regulations https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
| SF30 ONLY |
| C05 - Amendment A00001 127EAW26Q0051 |
| A00001 - 127EAW24R0017 - Crestline Group CG Renovation |
| Amendment - A00001 - 127EAW23R0011 - Sky Ranch Road |
| A1 RFIs 127EAW26Q0056 |
| A1 REPLACEMENT PAGE C04 Solicitation 127EAW26Q0056 BDF RM OHV |
| SF1442 IAS |
| REPLAMENT PAGES C04 Solicitation 127EAW26Q0056 BDF RM OHV |
| Acquisition Description |
| Statement of Requirement |
| Schedule Of Items |
| Technical Data |
File details come from the government source that posted it. Updated .