This is a computer-aided design (CAD) drawing file related to a roadway construction project in Walton County, Florida, involving the Town of Santa Rosa and Henry County, Georgia jurisdictions. The file, designated C-BASE-CORR-43371.001_3lanes.dwg, depicts the extension of Nellie Drive approximately one mile from Chat Holley Road to US Highway 98, located adjacent to 2038 US Highway 98 within Sections 25 and 26, Township 2S, Range 20. The project involves three-lane roadway design as indicated in the filename. The contract duration is 365 days to substantial completion, with an additional 30 days allocated for punch list completion. Sealed bids are to be received by 3:00 PM on October 2, 2025, via the County's eProcurement Portal at https://procurement.opengov.com/portal/henryga, with late submissions automatically disqualified.
The CAD drawing serves as technical documentation for bidders to understand the specific roadway extension design and site conditions. The drawing file format suggests this is a construction design plan that bidders will reference when preparing their bids and cost estimates for the Nellie Drive extension project. Bidders are expected to review this technical documentation along with other project specifications and supporting exhibits to develop comprehensive proposals. The procurement encourages participation from small, local, veteran-owned, disadvantaged, and female-owned businesses, with potential local vendor preference if their bid falls within 5% of the lowest submitted bid.
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .