This file consists of technical design and construction drawings prepared by the California Department of Parks and Recreation Facilities and Development Division for the Lake Britton Dock Replacement project at McArthur-Burney Falls Memorial State Park in Burney, California. The project involves removing the existing 80-foot-long, 5-foot-wide boarding float and replacing it with a new 80-foot-long, 6-foot-wide aluminum-frame boarding float designed to connect to and utilize the existing aluminum gangway and three existing 9-inch steel guide piles. The scope of work includes detaching, removing, and disposing of the existing boarding float. The contractor must submit shop drawings and calculations stamped by a California registered engineer for state approval. The boarding float fabricator must demonstrate a minimum of five years of experience in commercial aluminum fabrication and currently be engaged in commercial aluminum fabrication work.
The design specifications require the boarding float to be constructed from aluminum structural members and interlocking aluminum decking, with floatation material completely filled with expanded polystyrene (EPS) meeting ASTM C-578 standards. The float must support its total dead load and meet specific slope and freeboard requirements under various load conditions, including a 450-pound live point load. The cross slope of the floats shall not exceed 2 percent under dead load only along the accessible pathway, with maximum cross slope of 2 percent and longitudinal slope of 4.9 percent under combined dead load, uniform live load, and live point load conditions. All work must comply with current California codes including the 2025 California Building Code, 2025 California Electrical Code, 2010 ADA Standards for Accessible Design, and Division of Boating and Waterways guidelines for boat launching facilities. ADA compliance slopes will be verified by the state's representative using a calibrated 24-inch digital level, with non-compliant work to be removed and replaced at the contractor's expense.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DPR ACCESS COMPLIANCE REVIEW
ACCESSIBILITY SECTION
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
ACCESSIBILITY COMPLIANCE AND STATE FIRE
MARSHAL SIGNED ORIGINALS ARE ON FILE AT THE
DEPARTMENT OF PARKS AND RECREATION,
NORTHERN SERVICE CENTER
CERTIFICATION #
Reviewed by Date
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE:
Fi le
: C :\U se rs
\v in h.
le
\O ne
D riv e
- C al ifo rn ia
S ta te P ar ks
\D es kt op
\Q D riv e\
La ke
B rit to n
D oc k\
_D ra w in gs \G en er al \G
-1 T
IT
LE
S H
EE
T.
dw g
La yo ut : G
-1 T
IT
LE
S H
EE
T
D at e:
A pr il
- 7 :4 am
U se r:
Vi nh .L e
----.001
04/01/2026
V. LE
P. TABOR
V. LE
TI
TL
E
SH
EE
T
LA
KE
B R
IT
TO
N D
O C
K R
EP
LA
C
EM
EN
T
M C
AR
TH
U R
-B U
R N
EY
F
AL
LS
M
EM
O R
IA
L
ST
AT
E
PA
R K
100%
G-1
CALIFORNIA DEPARTMENT OF PARKS AND RECREATION
FACILITIES AND DEVELOPMENT DIVISION
SITE ADDRESS
GENERAL NOTES
LOCATION MAP
N
S
W E
SCOPE OF WORK
PREPARED BY
SYMBOLS LEGEND
STATE OF CALIFORNIA
DEPARTMENT OF PARKS AND RECREATION
FACILITIES AND DEVELOPMENT DIVISION
SERVICE CENTER
DIMENSION LINE
FACE OF MATERIAL
DETAIL NUMBER1
SHEET NUMBER
REVISION
NUMBER
DIMENSION LINE
CENTER LINE
A1
SECTION NUMBER
SHEET NUMBER
A A1
X'-X"
X'-X"
CL
VICINITY MAP
N
S
W E
1- ALL MATERIALS SHOWN OR NOTED ON THE PLANS ARE NEW
UNLESS CALLED OUT OTHERWISE.
2- THE CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL
EXISTING CONDITIONS SHOWN OR DIMENSIONED HERE. ANY
DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF
THE STATE REPRESENTATIVE FOR RESOLUTION BEFORE
PROCEEDING WITH THAT PORTION OF THE WORK.
3- ALL WORK SHALL COMPLY WITH THE CURRENT EDITION OF
THE FOLLOWING LISTED CODES, AND ALL OTHERS HAVING
JURISDICTION OVER THE WORK.
TITLE 19, CCR, PUBLIC SAFETY, SFM REGULATIONS.
2025 CA ADMINISTRATIVE CODE TITLE 24, PT 1.
2025 CA BUILDING CODE (CBC) TITLE 24, PT 2.
2025 CA ELECTRICAL CODE (CEC) TITLE 24, PT 3.
2025 CA MECHANICAL CODE (CMC) TITLE 24, PT 4
2025 CA PLUMBING CODE (CPC) TITLE 24, PT 5.
2025 CA ENERGY CODE CCR TITLE 24, PT 6.
2025 CA GREEN BUILDING STANDARDS TITLE 24, PT 11.
2025 CA REFERENCED STANDARDS TITLE 24, PT 12.
2010 ADA STANDARD FOR ACCESSIBLE DESIGN.
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR THE
TREATMENT OF HISTORIC PROPERTIES.
4- CONDUCT ALL WORK IN ACCORDANCE WITH THE LATEST
SAFETY RULES AND REGULATIONS OF ALL AUTHORITIES AND
AGENCIES HAVING JURISDICTION OVER THE WORK.
5- ALL WORK SHALL BE IN ACCORDANCE WITH THE
CONSTRUCTION DOCUMENTS. WHERE DETAILED
INFORMATION OR CLARIFICATION IS REQUIRED, THE MATTER
SHALL BE REFERRED TO THE STATE REPRESENTATIVE FOR
WRITTEN RESOLUTION.
6- THE CONTRACTOR SHALL NOT SCALE THE DRAWINGS, BUT
SHALL RELY ONLY ON THE WRITTEN DIMENSIONS GIVEN. IF A
DISCREPANCY OCCURS OR NO DIMENSION IS GIVEN, THE
CONTRACTOR SHALL NOTIFY THE STATE REPRESENTATIVE
FOR WRITTEN CLARIFICATION BEFORE PROCEEDING WITH
THAT PORTION OF THE WORK.
7. COMPLIANCE WITH ADA REGULATIONS FOR SLOPES STATED
ON THE PLANS WILL BE VERIFIED BY THE STATE'S
REPRESENTATIVE UTILIZING A 24 INCH DIGITAL LEVEL. THE 24
INCH DIGITAL LEVEL WILL BE SUPPLIED BY THE STATE AND
WILL BE CALIBRATED BY THE STATE'S REPRESENTATIVE
PRIOR TO THE TAKING OF ANY MEASUREMENTS.
MEASUREMENTS WILL BE TAKEN IN MULTIPLE DIRECTIONS
WITH THE 24” DIGITAL LEVEL TO VERIFY COMPLIANCE WITH
SLOPES SPECIFIED ON THE PLANS. WORK THAT DOES NOT
MEET THE REQUIREMENTS SHALL BE CONSIDERED
NON-COMPLIANT AND WILL NOT BE ACCEPTED BY THE STATE.
ANY AREA WHICH IS NON-COMPLIANT SHALL BE REMOVED
AND REPLACED AT THE CONTRACTOR'S EXPENSE.
LAKE BRITTON DOCK REPLACEMENT
MCARTHUR-BURNEY FALLS MEMORIAL STATE PARK
SHEET INDEX
PAGE SHEET TITLE SHEET
G-1 TITLE SHEET 1
C-1 BOARDING FLOAT PLAN AND
PROFILE 2
C-2 BOARDING FLOAT DETAIL 3
BURNEY CREEK PIER
MCARTHUR-BURNEY FALLS MEMORIAL STATE PARK
BURNEY, CALIFORNIA 96013
THE PROJECT CONSISTS OF REMOVING THE EXISTING 80‑FOOT‑LONG, 5‑FOOT‑WIDE BOARDING FLOAT AND REPLACING IT WITH A NEW 80‑FOOT‑LONG, 6‑FOOT‑WIDE ALUMINUM‑FRAME BOARDING FLOAT. THE NEW FLOAT WILL BE DESIGNED TO CONNECT TO AND UTILIZE THE EXISTING ALUMINUM GANGWAY AND THE EXISTING THREE (3) 9‑INCH STEEL GUIDE PILES. NO MODIFICATIONS TO THE GANGWAY OR GUIDE
PILES ARE INCLUDED IN THIS SCOPE.
SCOPE ALSO INCLUDES DETACHING, REMOVING AND DISPOSING OF THE EXISTING 80-FOOT-LONG
BOARDING FLOAT.
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text C 84125
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text H
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text
EXP: 09/30/27
6'-0"
20'-0" 15'-0" 25'-0"20'-0"
80' NOMINAL
SEE "GANGWAY HINGE CONNECTION"
PHOTO FOR EXISTING GANGWAY AND
BOARDING FLOAT HINGE CONNECTION.
CONFORM TO EXISTING GANGWAY HINGE.
VERIFY IN FIELD PIN DIAMETER SIZE.
EXISTING 9" STEEL PILE TO
REMAIN IN PLACE.
EXISTING 9" STEEL PIPE
PILE TO REMAIN IN PLACE.
EXISTING 9" STEEL PIPE TO
REMAIN IN PLACE.PILE GUIDE 1. SHOWN
APPROXIMATELY AT
HIGH WATER LEVEL
PILE GUIDE 2. SHOWN
APPROXIMATELY AT
HIGH WATER LEVEL
PILE GUIDE 3. SHOWN
APPROXIMATELY AT
HIGH WATER LEVEL
~30'~8'
~61'
BOARDING FLOAT LAYOUT - ELEVATION VIEW
NOT TO SCALE
~23'
EXISTING ALUMINUM GANGWAY AND HINGE TO
REMAIN IN PLACE. SEE "GANGWAY" PHOTO
FOR EXISTING CONDITION.
10" CLEATS2 x 12 YELLOW
HDPE FENDER CORNER
BUMPER AT
OUTBOARD
FLOAT END
SPACED EVENLY
BOARDING FLOAT PLAN
6'-0" WIDE
15' , 20', OR 25' WIDE
INTERLOCKING
ALUMINUM
DECKING
NOT TO SCALE
2 x 12 YELLOW
HDPE FENDER,
TYP.
ALUMINUM FRAME
INTERLOCKING
ALUMINUM DECKING
6'-0" WIDE
SUPPORT LEG
WITH PLASTIC
PAD. SEE NOTE 4
AND 5
30" MAX
BOARDING FLOAT SECTION
BOARDING FLOAT
PONTOON
NOT TO SCALE
NOTES:
1. THE PLAN SHOWN HERE IS A PERFORMANCE CONCEPT OF THE DOCKS REQUIRED BY THE PROJECT. CONTRACTOR MAY SUBSTITUTE ITS OWN ASSEMBLY DESIGN AND FRAME
MEMBERS FOR APPROVAL BY THE DEPARTMENT. THE DESIGN MUST INCORPORATE THE FUNCTIONAL FEATURES SHOWN ON THESE PLANS AND SHALL MEET THE DESIGN SPECIFICATIONS OF THE DEPARTMENT. ADDITIONAL FLOATATION MAY BE REQUIRED THAN AS SHOWN ON THE DRAWINGS. SHOP DRAWINGS SHALL BE SUBMITTED FOR
DEPARTMENT APPROVAL. SEE ADDITIONAL NOTES ON SHEET C-2.
2. CLEATS SHALL BE BOLTED THROUGH THE MAIN FRAME OF THE BOARDING FLOAT WITH 3/8" CARRIAGE BOLT. A 1/4" BACKUP WASHER-PLATE SHALL BE PLACE ON THE LOWER
FACE OF THE FLOAT FRAME WHERE THE CLEATS ARE LOCATED.
3. CONTRACTOR SHALL PROVIDE COUNTER BORES WHERE CARRIAGE BOLTS ARE BOLTED TO THE FRAME OF THE BOARDING FLOAT. CARRIAGE BOLTS SHALL SLIGHTLY BE
BELOW THE SURFACE OF THE HDPE FENDER BOARD.
4. PLASTIC PADS OF 1/2" OR THICKER ULTRA HIGH MOLECULAR WEIGHT POLYETHYLENE SHOULD BE ATTACHED TO THE BOTTOM OF THE LEGS TO PREVENT DAMAGE TO THE
LAUNCHING RAMP SURFACE.
5. THE THICKNESS OF THE PADS MUST BE CONSIDERED IN THE OVERALL HEIGHT OF THE BOARDING FLOATS IN ORDER TO AVOID EXCEEDING 30".
DPR ACCESS COMPLIANCE REVIEW
ACCESSIBILITY SECTION
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
ACCESSIBILITY COMPLIANCE AND STATE FIRE
MARSHAL SIGNED ORIGINALS ARE ON FILE AT THE
DEPARTMENT OF PARKS AND RECREATION,
NORTHERN SERVICE CENTER
CERTIFICATION #
Reviewed by Date
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE:
Fi le
: C :\U se rs
\v in h.
le
\O ne
D riv e
- C al ifo rn ia
S ta te P ar ks
\D es kt op
\Q D riv e\
La ke
B rit to n
D oc k\
_D ra w in gs \C iv il\
C T
ES
T.
dw g
La yo ut : C
T
ES
T D at e:
A pr il
- 4
:1 pm U se r:
Vi nh
.L e
----.002
04/01/2026
V. LE
P. TABOR
V. LE
BO
AR
D
IN
G F
LO
AT
P
LA
N A
N D
PR
O
FI
LE
LA
KE
B R
IT
TO
N D
O C
K R
EP
LA
C
EM
EN
T
M C
AR
TH
U R
-B U
R N
EY
F
AL
LS
M
EM
O R
IA
L
ST
AT
E
PA
R K
100%
C-1
EXISTING 9" STEEL PILES TO
REMAIN IN PLACE.
EXISTING BOARDING FLOAT
TO BE DETACHED,
REMOVED AND DISPOSED
OF.
EXISTING GANGWAY TO
REMAIN AND
REATTACHED TO NEW
BOARDING FLOAT
EXISTING GANGWAY TO
REMAIN AND
REATTACHED TO NEW
BOARDING FLOAT
CONFORM NEW BOARDING
FLOAT TO EXISTING GANGWAY
BARREL HINGE CONNECTION
GANGWAY PHOTO
GANGWAY HINGE CONNECTION
EXISTING 5' WIDE BOARDING
FLOAT TO BE DETACHED,
REMOVED AND DISPOSED OF.
PILE GUIDE BRACKET
EXISTING PILE GUIDE
BRACKET TO BE
DETACHED
EXISTING 9" STEEL
PILES TO REMAIN IN
PLACE.
~5' WIDE
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text C 84125
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text H
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text V
1. LATERAL CLEARANCE FOR PILE RUB STRIP IS 1 INCH MIN AT ALL
WATER LEVELS.
2. UHMW PILE RUB STRIP SHALL HAVE A MINIMUM THICKNESS OF 1 INCH.
FLOAT NOTES
NTS1 PILE GUIDE
NTS2 BOARDING FLOAT DESIGN NOTES
1. THE BOARDING FLOAT DESIGN SHOWN ON THESE PLANS SPECIFY THE PERFORMANCE CRITERIA THE DOCKS SHALL MEET. MANUFACTURES/CONTRACTOR ARE REQUIRED TO SUBMIT SHOP DRAWINGS SHOWING THE SPECIFIC DOCK SYSTEM TO BE INSTALLED, IDENTIFYING THE MATERIALS AND ASSEMBLY METHODS TO BE USED.
2. THE SHOP DRAWINGS SHALL BE REVIEWED FOR COMPLIANCE WITH DIVISION OF BOATING AND WATERWAYS GUIDELINES "2021 LAYOUT AND DESIGN GUIDELINES FOR BOAT LAUNCHING
FACILITIES" BY THE STATE REPRESENTATIVE.
3. THE BOARDING FLOAT MANUFACTURER/CONTRACTOR SHALL SUBMIT CALIFORNIA REGISTERED ENGINEER'S STAMPED SHOP DRAWINGS AND CALCULATIONS FOR STATE APPROVAL.
4. THE BOARDING FLOAT FABRICATOR MUST BE CURRENTLY IN THE BUSINESS OF COMMERCIAL ALUMINUM FABRICATION AND BE ABLE TO FURNISH ADEQUATE EVIDENCE OF A MINIMUM OF 5
YEARS OF EXPERIENCE IN COMMERCIAL ALUMINUM FABRICATION.
5. THE FOLLOWING MATERIALS ARE ACCEPTABLE FOR THE CONSTRUCTION OF THE FLOATING DOCK FRAMES AND DECKING
· ALUMINUM STRUCTURAL MEMBERS
· INTERLOCKING ALUMINUM DECKING
6. THE FLOATATION MATERIAL USED FOR PONTOONS SHALL BE COMPLETELY FILLED WITH EXPANDED POLYSTYRENE (EPS). THE EXPANDED POLYSTYRENE SHALL HAVE A DENSITY OF 1.0 -15 LBS PER CUBIC FOOT WITH WATER ABSORPTION NOT TO EXCEED 3 LBS PER CUBIC FOOT IN ACCORDANCE WITH THE HUNT WATER ABSORPTION TEST. EPS CONTENTS SHALL CONFORM TO THE ASTM C- 578 THE PONTOON/TUB POLYSTYRENE SHALL BE PRODUCED BY A MANUFACTURER WHO HAS BEEN CONTINUOUS ENGAGED IN PRODUCTION OF POLYSTYRENE FOR MARINE
FLOATATION FOR AT EAST THREE YEARS.
7. THE BOARDING FLOAT SHALL SUPPORT THE TOTAL DEAD LOAD (DL) OF ALL MATERIALS USED IN THEIR CONSTRUCTION.
8. THE CROSS SLOPE OF THE FLOATS SHALL NOT EXCEED 2% (1:50) UNDER DEAD LOAD ONLY ALONG THE ACCESSIBLE PATHWAY.
9. THE FLOATS SHALL MEET ALL SLOPE AND FREEBOARD REQUIREMENTS UNDER A LIVE POINT LOAD (LPL) OF 450 POUNDS APPLIED TO A POINT 12-INCHES FROM ANY DOCK EDGE AND AT THE
END OF THE OUTERMOST FLOAT.
10. STANDARD FREEBOARD REQUIREMENTS ARE AS FOLLOWS:
A. UNDER DL ONLY:
MINIMUM FREEBOARD = 14 INCHES
MAXIMUM FREEBOARD = 20 INCHES
B. UNDER DL + ULL:
MINIMUM FREEBOARD = 10 INCHES
C. UNDER DL + LPL
MINIMUM FREEBOARD = 13 INCHES
D. UNDER DL + ULL + LPL
MINIMUM FREEBOARD = 8 INCHES
11. SLOPE REQUIREMENTS:
A. ON ACCESSIBLE DOCKS UNDER DL + ULL + LPL
CROSS SLOPE: 2%
LONGITUDINAL SLOPE: 4.9%
PILE GUIDE CLEAR
OPENING LENGTH 31.5" 32"
PILE GUIDE BRACKET TABLE
PILE #
VARIES
SEE TABLE THIS SHEET
13" MIN
2"x 2"x 14"x 5" ∠ WITH
(2) 12" BOLTS TYP.
4"x1" WHITE UHMW
POLYETHYLENE RUB
STRIPS
STIFFENER PLATE WITH
UHMW RUB STRIP
HINGE
4"x 1" WHITE UHMW
POLYETHYLENE RUB STRIPS
EXISTING
9" STEEL PILE
1"
VARIES
SEE TABLE THIS SHEET
13" MIN.
1"
4" X 1" WHITE UHMW
POLYETHYLENE
RUB STRIPS
4"
MIN.
CLR.
1" M
IN
C
LR
4"
MIN.
CLR.
1" M
IN
C
LR
33.5"
DPR ACCESS COMPLIANCE REVIEW
ACCESSIBILITY SECTION
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
ACCESSIBILITY COMPLIANCE AND STATE FIRE
MARSHAL SIGNED ORIGINALS ARE ON FILE AT THE
DEPARTMENT OF PARKS AND RECREATION,
NORTHERN SERVICE CENTER
CERTIFICATION #
Reviewed by Date
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE:
Fi le
: C :\U se rs
\v in h.
le
\O ne
D riv e
- C al ifo rn ia
S ta te P ar ks
\D es kt op
\Q D riv e\
La ke
B rit to n
D oc k\
_D ra w in gs \C iv il\
C -2
B O
AR
D
IN
G
F
LO
AT
D
ET
AI
LS
.d w g
La yo ut : C
-2 B
O
AR
D
IN
G F
LO
AT
D
ET
AI
LS
D at e:
A pr il
- 3 :5 pm
U se r:
Vi nh .L e
----.003
04/01/2026
V. LE
P. TABOR
V. LE
BO
AR
D
IN
G F
LO
AT
D
ET
AI
LS
LA
KE
B R
IT
TO
N D
O C
K R
EP
LA
C
EM
EN
T
M C
AR
TH
U R
-B U
R N
EY
F
AL
LS
M
EM
O R
IA
L
ST
AT
E
PA
R K
100%
C-2
AutoCAD SHX Text
RELATIVE POSITION OF PILE WITHIN PILE AT AT HIGH AND LOW WATER LEVELS
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text C 84125
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text H
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text V
| G-1 TITLE SHEET-G-1 TITLE SHEET |
| Sheets and Views |
| G-1 TITLE SHEET |
| C TEST-C TEST |
| Sheets and Views |
| C TEST |
| C-2 BOARDING FLOAT DETAILS-C-2 BOARDING FLOAT DETAILS |
| Sheets and Views |
| C-2 BOARDING FLOAT DETAILS |
File details come from the government source that posted it. Updated .