This is a specifications document issued by the California Department of Parks and Recreation for the boat boarding float replacement project at McAurthur-Burney Falls Memorial State Park, scheduled for April 2026. The project requires the fabrication, delivery, and installation of aluminum frame boarding floats with aluminum decking to replace existing boarding floats. The contractor must furnish all labor, materials, equipment, transportation, and related services necessary to manufacture and install the new boarding floats and hardware while removing and disposing of the existing floats. The new floats must connect with the existing hinge system as shown in contract plans. Key submittals required prior to fabrication include shop drawings sealed by a California-registered Professional Engineer, design calculations conforming to the Division of Boating and Waterway's 2021 Layout and Design Guidelines, floatation specifications, material sourcing documentation, welder certifications, and a fabrication and installation schedule.

The boarding floats must meet stringent design criteria including specific freeboard requirements (14-20 inches minimum to maximum under dead load only), level floating within precise tolerances, and the ability to support uniform live loads of 20 pounds per square foot and concentrated point loads of 450 pounds. Materials specifications mandate Aluminum Alloy Series 5000 or 6000 for structural frames, high-density polyethylene pontoons with expanded polystyrene floatation, and 316 stainless steel fasteners throughout. All welding must be performed by AWS D1.2-certified welders and pass state inspection, with deficient welds corrected at the contractor's expense. The contractor must demonstrate a minimum of five years of commercial aluminum and steel fabrication experience and provide three project references. The float system carries a five-year warranty against defects in materials and workmanship from the project acceptance date, and any design criteria not met upon installation must be repaired at no additional cost to the State.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALIFORNIA DEPARTMENT

OF

PARKS AND RECREATION

SPECIFICATIONS

Boat Boarding Float Replacement McAurthur-Burney Falls Memorial State Park

April 2026

SECTION 355113

BOARDING FLOATS

PART 1 - GENERAL

1.1 SUMMARY

1. This section includes:

1. Aluminum frame boarding float with aluminum decking

1.2 DESCRIPTION

1. The contractor shall furnish all labor, materials, equipment, transportation and incidentals required to furnish and install aluminum frame boarding floats and aluminum decking.

2. The contract work includes:

1. Furnishing all material, equipment, and labor necessary to manufacture, deliver, and install the boarding floats and all necessary hardware required to provide functional boarding float systems as shown on the plans and described within these specifications.

2. Furnishing all material, equipment, and labor necessary to removal and disposal of existing boarding floats. New floats shall be connected with the existing hinge system as shown in the contract plans and described herein.

1.3 SUBMITTALS

1. Shop Drawings: Submit shop drawings showing all members, member shapes, and sizes, dimensions, quantities, connecting details and accessories. Shop drawings shall be provided for all specially fabricated items. Shop drawings shall be prepared under the supervision of and sealed by a Professional Engineer holding a valid Certificate of Registration in the State of California.

2. Design Calculations: Submit design calculations attesting the floats conform to all design requirements as given in the Division of Boating and Waterway’s 2021 Layout and Design Guidelines for Boat Launching Facilities as a minimum. Calculations shall be prepared under the supervision of and sealed by a Professional Engineer holding a valid Certificate of Registration in the State of California.

Section 355113 – Page 2 Boarding Floats

3. In additional, the Contractor shall make the following submittals to the Project Engineer for approval prior to purchase, fabrication, or installation:

1. Floatation tub and floatation foam source and technical data

2. Aluminum interlocking planks

3. Mooring cleats

4. Fender board material and color

5. Corner bumpers

6. Hardware

7. Welder certifications

8. Fabrication and installation schedule

9. Staging Area

10. Request to the project engineer, in writing, for approval of proposed substitutions or equals.

1.4 DESIGN CRITERIA

1. Dead loads shall consist of the weight of the float modules, framing, attachment hardware, miscellaneous connection devices, and all other permanently attached accessories such as cleats, ramps, etc. Contractor shall exercise care to be sure that all dead loads are accurately determined and accounted for, including superimpose loads, consideration of weight gain due to water absorption, and manufacturing tolerances that affect final freeboard.

2. Boarding Floats are to be designed to meet the following criteria:

1. Dead Load Only (DL): Boarding floats are to float level in the water within the following limits:

a. Length: 1/10 inch per foot over the length of an individual boarding float section, not to exceed 1” in 10’.

b. Width: 1/8 inch per foot over the length of an individual boarding float section; not to exceed 1” max.

2. Live Load: Boarding floats are to float level in the water within the following limits:

a. Uniform Live Load (ULL) shall be 20 pounds per square foot (20 psf)

Section 355113 – Page 3

b. Live Point Load (LPL) shall be 450 pounds, applied 12 inches away from the edge of the boarding float.

3. Freeboard: Boarding floats shall provide the freeboard under the loading conditions listed below, with no more than 1” loss of freeboard after one year of service.

1. Dead Load Only (DL): 14 inch minimum / 20 inch maximum to the top of deck.

2. DL + ULL: 10 inch minimum to top of deck

3. DL + LPL: 13 inch minimum to top of deck

4. DL + ULL + LPL: 8 inch minimum to top of deck

Due to the variances deck construction, the contractor shall furnish freeboard calculations for the boarding floats for approval. The calculations shall bear the seal of a Registered Professional Engineer.

4. Wind and Wave Loading (WL) on the projected area of a vessel/dock combination applied as discussed in the Layout and Design Guidelines Handbook and the following:

1. Wind load on the dock of 25 pounds per linear foot of float plus wind force on vessels tied to the float of 45 pounds per linear foot for total of 70 pounds per linear foot minimum.

5. Design handrails to resist a concentrated load of 200 pounds in any direction at any point of the top rail, or 50 pounds per foot applied horizontally, whichever is greater.

6. The floatation units shall be designed to maintain their desired buoyancy and freeboard even if structurally damaged.

7. Float modules shall be designed so the section will neither rack nor twist in torsion under extreme design conditions. This system shall allow easy connecting and disconnection between individual dock modules.

8. The contractor shall demonstrate by in-water test or written calculations that the system will not tilt (list of pitch) more than six degree from horizontal when a concentrated load of 450 lbs is placed anywhere on the deck when assembled in a configuration similar to that shown on the contract drawings.

9. Neoprene PSA isolation strips (minimum 1/8 inch thickness) or other non-ferrous material shall be used to separate all aluminum and galvanized steel parts and other miscellaneous items to prevent corrosion or reaction between metals.

Section 355113 – Page 4

1.5 REQUIREMENTS FOR GUIDE PILE SYSTEM

1. The pile guide frame shall be designed to permit removal of a float module from the guide pile system by simple bolt removal for repair purposes.

2. The guide pile frame shall be fit with an UHMW pile rub strip on 4 sides of the pile, or continuous, as shown on the Drawings.

3. The nominal clearance between the pile rub stirp and the pile shall be as shown on the Drawings for the “no load” condition. The clearance between each rub strip and the pile shall be field-adjustable to meet the actual conditions in the field.

1.6 EXPERIENCE

1. The boarding float fabricator must be currently in the business of commercial aluminum fabrication and be able to furnish adequate evidence of a minimum of 5 years of experience in commercial steel and aluminum fabrication.

2. To demonstrate his competence, the contractor shall be required to submit to the state representative, a list of a minimum of three projects for which he has furnished floating modules of the type herein specified.

1.7 DELIVERY, HANDLING, AND STORAGE

1. Use all means necessary to protect material before, during, and after delivery to the Work site, and to protect the installed work and materials of all other trades.

Use extreme care in the off-loading of materials to prevent damage.

2. Deliver the materials to the Work site and store, all in a safe area, out of the way of traffic, and shored up off the ground surface

3. Place identification numbers on all float modules (such they are not covered up after assembly) that conforms to the shop drawing numbering system. Also identify hardware and farming and store separately from each other. Protect all metal products with adequate weatherproof outer wrappings.

1.8 WARRANTY

1. The float system, including all structural components, shall carry warranty against defects in materials and workmanship for five (5) years from the date of project acceptance.

PART 2 - PRODUCTS

2.1 MATERIALS

1. STRUCTURAL ALUMINUM FRAME

Section 355113 – Page 5

1. Aluminum Alloy Series 5000 or series 6000 and shall be in in accordance with AA Specification for Aluminum Structures, ASTM B 209, ASTM B 211, ASTM B 221, ASTM B 308, ASTM B 429, and ASTM B 574 for various metals used. All welds shall be in accordance with AWS D1.2.

2. Provide aluminum or stainless steel accessories. Stainless steel shall conform to ASTM A 276, Type 316 or 316L as applicable. Dissimilar metals shall be electrically isolated with non-metallic insulators.

3. Fasteners conform to ASTM F 593 and ASTM F 549. All bolts, screws, and nuts shall be 316 or 316L stainless steel. Washers shall comply with the requirements of ANSI B18.22.1 and shall be 316 stainless steel.

2. ALUMINMUM WALKING SURFACE

1. Boarding floats aluminum extrusions shall be at least 1/8 inch thick.

Decking surface shall be knurled and sandblasted to provide an aggressive non-skid surface. Deck slats shall be double interlocking, so that adjacent panels will act together. Interlocking panels shall span the entire width as one piece.

3. FLOATATION PONTOONS

1. Pontoons/tubs shall be manufactured from linear virgin polyethylene resin containing UV ray inhibitors and carbon black. The finished product being a high-density polyethylene Type III or IV. The pontoons/tubs shall be without any organic filler. Pontoons shall be rotationally molded, one-piece construction. The pontoons/tubs minimum wall thickness shall be

0.150 inches. Pontoons shall be Ace Roto-Mold or approved equal as distributed by Henderson Marine Supply (707)-781-7142.

2. Pontoons/tubs shall be completely filled with expanded polystyrene (EPS).

The expanded polystyrene shall have a density of 1.0 - 1.5 lbs. per cubic foot with water absorption not to exceed 3 lbs per cubic foot in accordance with the Hunt Water Absorption Test. EPS contents shall conform to the ASTM C-578. The pontoon/tub polystyrene shall be produced by a manufacturer who has been continuously engaged in production of polystyrene for marine flotation for at least three years.

3. Floatation material shall be distributed as widely as possible under the floats for maximum stability and to meet the requirements of the design criteria.

4. Tubs shall be bolted to the frame with ½” diameter bolts with flat washers and lock washers. All bolt locations provided by the float manufacturer shall be utilized (Exp: a 4’x8’ pontoon requires 12 bolts per pontoon).

Section 355113 – Page 6

5. If upon installation of the docks in the water any design criteria is not achieved, the Contractor shall repair at no extra cost to the State.

Contractor shall submit repair procedures for approval in conformance to that recommended by the float manufacturer.

4. FENDER BOARDS

The fender boards shall be high density polyethylene lumber. The size shall be 2” x 12” (nominal), color yellow for all float sections. Fender shall be Bedford Technology, www.plasticboards.com or approved equal. Fender boards shall be in lengths of 60” +/- with ½” gap between board ends for thermal expansion.

Planks shall be bolted to the frame with pairs of 1/2” diameter bolts with lock washers. Counter sink bolt heads 1/8” below the face of the boards. Install flat washer under bolt head and a lock washer under the nut. Do not over tighten, to allow slight movement as fender board expands and contracts due to temperature changes.

Fender boards shall be installed per the following guidelines:

1. A pre-drill hole for all bolts 1/8” larger than the diameter of the bolt.

2. Pre-drill counter bore hole for washer 1/4” larger than the diameter of the washer. Counter-bore hole so bolt head will be below the surface of the lumber 1/8”.

3. Tighten bolts only to snug tightness, without torque resistance. If impact wrenches are used to install, back-off bolt to snug tightness.

5. CORNER DOCK BUMPERS

1. Corners of fender boards at end dock at top and bottom shall be covered with Henderson ANC Taper Bumper 03-06B, as distributed by Henderson Marine Supply, Inc, or equal to the approved.

2. Fender corner bumpers shall be fastened to the fender boards with #10 x 1” S.S. wood screws @ 2” o.c. with a 1/8” x 1/2” wide aluminum backing strips

6. MOORING CLEATS

1. Mooring cleats shall be installed as shown in the contract plans. Cleats shall be 10” overall length cast aluminum, standard cleat as supplied by Henderson Marine Supply or approved equal. Cleat locations and sizes shall be as shown; attach cleats to the dock with the dock manufacturers’ recommendation.

7. MISCELLANEOUS HARDWARE

http://www.plasticboards.com/

Section 355113 – Page 7

1. Stainless steel hardware shall be type 316 unless otherwise noted. Bolts shall be ASTM F 593 Group 2. Nuts shall be ASTM F 594 Group 2.

2. Fasteners for dock accessories shall be stainless steel unless otherwise noted.

PART 3 - EXECUTION

3.1 FABRICATION

1. All boarding float sections shall be completely prefabricated by the contractor at the plant and delivered ready for assemble at site.

2. All floating sections shall be manufactured at a facility adequately equipped to accomplish the manufacturing process.

3. Connections between members shall be tight, accurate and secure. All fasteners shall be placed without splitting the HDPE fender member, and shall be squarely drawn up to a flush flat seat. Holes for fasteners shall be pre-drilled to avoid splitting or other damage to the member.

4. All bolts and screws shall be placed square or plumb and securely tightened at installation.

3.2 WELDING

1. Welding inspection procedures, technique, and methods shall comply with the requirements as represented in American National Standards Institute (ANSI) and American Welding Society (AWS), D1.2 (latest edition). The Engineer/Inspector has the right to inspect any part of the boarding float he determined necessary to insure that it meets the requirements of the plans and specifications.

2. Aluminum sections shall be fabricated only by certified welders. Welder certifications shall be submitted to the Engineer prior to the start of fabrication. The contractor shall submit a certificate that all boarding float welding was performed by a welder certified per AWS D1.2.

3. WELDING INSPECTION: A single welding inspection shall be scheduled, performed, and passed. If the welding does not pass inspection, then the contractor shall correct the deficiencies and schedule another inspection.

The contractor shall be responsible for all expenses for inspection and any necessary re-inspection.

a. Any deficient weld shall be corrected by a welder who is certified in accordance with the requirements as established by the American Welding Society (AWS). The welder shall have the proper certification documents indicating that he/she is qualified to perform

Section 355113 – Page 8 the type, size and position of the weld performed, with the welding process utilized, and on the material being welded. The contractor/fabricator will be required to supply proof of current welding certifications for personnel performing any re-welding on the unit, upon request of the State whether written or verbal.

b. All welding shall be continuous except as noted. Intermittent or spot welds shall be spaced and proportioned to provide ample strength for the material being welded. Weld sizes not indicated shall be equal to the thickness of the least of the joined plates.

c. All welds shall be properly fused, displaying proper penetration and a professional finish, and must meet the qualification requirements of applicable AWS specifications. Examples of unacceptable weldments are: Cracks, Excessive Splatter, Undercut, Blow Holes, Overlap, Slag Entrapment.

d. Any weld failing to comply with the AWS specifications or failing to pass a quality assurance inspection performed by the State, will be corrected by the fabricator/contractor, at their expense, and be corrected off State property. The State shall determine if a weld is acceptable or deficient.

e. For contractors that are located in the State of California, the welding inspection shall be performed and approved by the State Engineer at the contractor’s manufacturing location.

f. For contractors that are located outside of California, the welding inspection shall be performed and approved by an independent third party AWS certified inspector. The third party inspector’s name and qualifications shall be submitted to the State for approval. The contractor shall receive written approval from the State prior hiring an inspector. A written inspection report, signed by the third party inspector, shall be submitted and approved by the State Engineer.

3.3 INSTALLATION

1. The boarding floats shall be assembled, placed in water, flotation tested and left in water ready for use. The contractor shall, if necessary, adjust pontoons or add floatation/counterweights to produce a level float deck under a “dead load” condition of components as required by the design criteria herein.

3.4 DELIVERY

1. The contractor shall be responsible for obtaining and paying for all transportation permits.

Section 355113 – Page 9

2. The contractor shall be responsible for transportation and storage his/her material and equipment.

3. The contractor shall be responsible for delivery, unloading, floating and installing the boarding floats at the project sites.

4. Boarding floats shall be inspected by the State Engineer at the project site prior to installation, and any damaged sections shall be replaced by the contractor at his own expense. Welding shall comply with the requirements as specified in the Sections 3.2.

END OF SECTION 355113

001 Cover Sheet
355113-Aluminum BOARDING FLOATS
PART 1 - GENERAL
1.1 SUMMARY
1. This section includes:
1. Aluminum frame boarding float with aluminum decking
1.2 DESCRIPTION
1. The contractor shall furnish all labor, materials, equipment, transportation and incidentals required to furnish and install aluminum frame boarding floats and aluminum decking.
2. The contract work includes:
1. Furnishing all material, equipment, and labor necessary to manufacture, deliver, and install the boarding floats and all necessary hardware required to provide functional boarding float systems as shown on the plans and described within these speci...
2. Furnishing all material, equipment, and labor necessary to removal and disposal of existing boarding floats. New floats shall be connected with the existing hinge system as shown in the contract plans and described herein.
1.3 SUBMITTALS
1. Shop Drawings: Submit shop drawings showing all members, member shapes, and sizes, dimensions, quantities, connecting details and accessories. Shop drawings shall be provided for all specially fabricated items. Shop drawings shall be prepared under...
2. Design Calculations: Submit design calculations attesting the floats conform to all design requirements as given in the Division of Boating and Waterway’s 2021 Layout and Design Guidelines for Boat Launching Facilities as a minimum. Calculations sh...
3. In additional, the Contractor shall make the following submittals to the Project Engineer for approval prior to purchase, fabrication, or installation:
1. Floatation tub and floatation foam source and technical data
2. Aluminum interlocking planks
3. Mooring cleats
4. Fender board material and color
5. Corner bumpers
6. Hardware
7. Welder certifications
8. Fabrication and installation schedule
9. Staging Area
10. Request to the project engineer, in writing, for approval of proposed substitutions or equals.
1.4 DESIGN CRITERIA
1. Dead loads shall consist of the weight of the float modules, framing, attachment hardware, miscellaneous connection devices, and all other permanently attached accessories such as cleats, ramps, etc. Contractor shall exercise care to be sure that a...
2. Boarding Floats are to be designed to meet the following criteria:
1. Dead Load Only (DL): Boarding floats are to float level in the water within the following limits:
a. Length: 1/10 inch per foot over the length of an individual boarding float section, not to exceed 1” in 10’.
b. Width: 1/8 inch per foot over the length of an individual boarding float section; not to exceed 1” max.
2. Live Load: Boarding floats are to float level in the water within the following limits:
a. Uniform Live Load (ULL) shall be 20 pounds per square foot (20 psf)
b. Live Point Load (LPL) shall be 450 pounds, applied 12 inches away from the edge of the boarding float.
3. Freeboard: Boarding floats shall provide the freeboard under the loading conditions listed below, with no more than 1” loss of freeboard after one year of service.
1. Dead Load Only (DL): 14 inch minimum / 20 inch maximum to the top of deck.
2. DL + ULL: 10 inch minimum to top of deck
3. DL + LPL: 13 inch minimum to top of deck
4. DL + ULL + LPL: 8 inch minimum to top of deck
Due to the variances deck construction, the contractor shall furnish freeboard calculations for the boarding floats for approval. The calculations shall bear the seal of a Registered Professional Engineer.
4. Wind and Wave Loading (WL) on the projected area of a vessel/dock combination applied as discussed in the Layout and Design Guidelines Handbook and the following:
1. Wind load on the dock of 25 pounds per linear foot of float plus wind force on vessels tied to the float of 45 pounds per linear foot for total of 70 pounds per linear foot minimum.
5. Design handrails to resist a concentrated load of 200 pounds in any direction at any point of the top rail, or 50 pounds per foot applied horizontally, whichever is greater.
6. The floatation units shall be designed to maintain their desired buoyancy and freeboard even if structurally damaged.
7. Float modules shall be designed so the section will neither rack nor twist in torsion under extreme design conditions. This system shall allow easy connecting and disconnection between individual dock modules.
8. The contractor shall demonstrate by in-water test or written calculations that the system will not tilt (list of pitch) more than six degree from horizontal when a concentrated load of 450 lbs is placed anywhere on the deck when assembled in a conf...
9. Neoprene PSA isolation strips (minimum 1/8 inch thickness) or other non-ferrous material shall be used to separate all aluminum and galvanized steel parts and other miscellaneous items to prevent corrosion or reaction between metals.
1.5 REQUIREMENTS FOR GUIDE PILE SYSTEM
1. The pile guide frame shall be designed to permit removal of a float module from the guide pile system by simple bolt removal for repair purposes.
2. The guide pile frame shall be fit with an UHMW pile rub strip on 4 sides of the pile, or continuous, as shown on the Drawings.
3. The nominal clearance between the pile rub stirp and the pile shall be as shown on the Drawings for the “no load” condition. The clearance between each rub strip and the pile shall be field-adjustable to meet the actual conditions in the field.
1.6 EXPERIENCE
1. The boarding float fabricator must be currently in the business of commercial aluminum fabrication and be able to furnish adequate evidence of a minimum of 5 years of experience in commercial steel and aluminum fabrication.
2. To demonstrate his competence, the contractor shall be required to submit to the state representative, a list of a minimum of three projects for which he has furnished floating modules of the type herein specified.
1.7 DELIVERY, HANDLING, AND STORAGE
1. Use all means necessary to protect material before, during, and after delivery to the Work site, and to protect the installed work and materials of all other trades. Use extreme care in the off-loading of materials to prevent damage.
2. Deliver the materials to the Work site and store, all in a safe area, out of the way of traffic, and shored up off the ground surface
3. Place identification numbers on all float modules (such they are not covered up after assembly) that conforms to the shop drawing numbering system. Also identify hardware and farming and store separately from each other. Protect all metal products ...
1.8 WARRANTY
1. The float system, including all structural components, shall carry warranty against defects in materials and workmanship for five (5) years from the date of project acceptance.
PART 2 - PRODUCTS
2.1 MATERIALS
1. STRUCTURAL ALUMINUM FRAME
1. Aluminum Alloy Series 5000 or series 6000 and shall be in in accordance with AA Specification for Aluminum Structures, ASTM B 209, ASTM B 211, ASTM B 221, ASTM B 308, ASTM B 429, and ASTM B 574 for various metals used. All welds shall be in accorda...
2. Provide aluminum or stainless steel accessories. Stainless steel shall conform to ASTM A 276, Type 316 or 316L as applicable. Dissimilar metals shall be electrically isolated with non-metallic insulators.
3. Fasteners conform to ASTM F 593 and ASTM F 549. All bolts, screws, and nuts shall be 316 or 316L stainless steel. Washers shall comply with the requirements of ANSI B18.22.1 and shall be 316 stainless steel.
2. ALUMINMUM WALKING SURFACE
1. Boarding floats aluminum extrusions shall be at least 1/8 inch thick. Decking surface shall be knurled and sandblasted to provide an aggressive non-skid surface. Deck slats shall be double interlocking, so that adjacent panels will act together. In...
3. FLOATATION PONTOONS
1. Pontoons/tubs shall be manufactured from linear virgin polyethylene resin containing UV ray inhibitors and carbon black. The finished product being a high-density polyethylene Type III or IV. The pontoons/tubs shall be without any organic filler. P...
2. Pontoons/tubs shall be completely filled with expanded polystyrene (EPS). The expanded polystyrene shall have a density of 1.0 - 1.5 lbs. per cubic foot with water absorption not to exceed 3 lbs per cubic foot in accordance with the Hunt Water Abso...
3. Floatation material shall be distributed as widely as possible under the floats for maximum stability and to meet the requirements of the design criteria.
4. Tubs shall be bolted to the frame with ½” diameter bolts with flat washers and lock washers. All bolt locations provided by the float manufacturer shall be utilized (Exp: a 4’x8’ pontoon requires 12 bolts per pontoon).
5. If upon installation of the docks in the water any design criteria is not achieved, the Contractor shall repair at no extra cost to the State. Contractor shall submit repair procedures for approval in conformance to that recommended by the float ma...
4. FENDER BOARDS
The fender boards shall be high density polyethylene lumber. The size shall be 2” x 12” (nominal), color yellow for all float sections. Fender shall be Bedford Technology, www.plasticboards.com or approved equal. Fender boards shall be in lengths of 6...
Fender boards shall be installed per the following guidelines:
1. A pre-drill hole for all bolts 1/8” larger than the diameter of the bolt.
2. Pre-drill counter bore hole for washer 1/4” larger than the diameter of the washer. Counter-bore hole so bolt head will be below the surface of the lumber 1/8”.
3. Tighten bolts only to snug tightness, without torque resistance. If impact wrenches are used to install, back-off bolt to snug tightness.
5. CORNER DOCK BUMPERS
1. Corners of fender boards at end dock at top and bottom shall be covered with Henderson ANC Taper Bumper 03-06B, as distributed by Henderson Marine Supply, Inc, or equal to the approved.
2. Fender corner bumpers shall be fastened to the fender boards with #10 x 1” S.S. wood screws @ 2” o.c. with a 1/8” x 1/2” wide aluminum backing strips
6. MOORING CLEATS
1. Mooring cleats shall be installed as shown in the contract plans. Cleats shall be 10” overall length cast aluminum, standard cleat as supplied by Henderson Marine Supply or approved equal. Cleat locations and sizes shall be as shown; attach cleats ...
7. MISCELLANEOUS HARDWARE
1. Stainless steel hardware shall be type 316 unless otherwise noted. Bolts shall be ASTM F 593 Group 2. Nuts shall be ASTM F 594 Group 2.
2. Fasteners for dock accessories shall be stainless steel unless otherwise noted.
PART 3 - EXECUTION
3.1 FABRICATION
1. All boarding float sections shall be completely prefabricated by the contractor at the plant and delivered ready for assemble at site.
2. All floating sections shall be manufactured at a facility adequately equipped to accomplish the manufacturing process.
3. Connections between members shall be tight, accurate and secure. All fasteners shall be placed without splitting the HDPE fender member, and shall be squarely drawn up to a flush flat seat. Holes for fasteners shall be pre-drilled to avoid splitt...
4. All bolts and screws shall be placed square or plumb and securely tightened at installation.
3.2 WELDING
1. Welding inspection procedures, technique, and methods shall comply with the requirements as represented in American National Standards Institute (ANSI) and American Welding Society (AWS), D1.2 (latest edition). The Engineer/Inspector has the right...
2. Aluminum sections shall be fabricated only by certified welders. Welder certifications shall be submitted to the Engineer prior to the start of fabrication. The contractor shall submit a certificate that all boarding float welding was performed by...
3. WELDING INSPECTION: A single welding inspection shall be scheduled, performed, and passed. If the welding does not pass inspection, then the contractor shall correct the deficiencies and schedule another inspection. The contractor shall be responsi...
a. Any deficient weld shall be corrected by a welder who is certified in accordance with the requirements as established by the American Welding Society (AWS). The welder shall have the proper certification documents indicating that he/she is qualifie...
b. All welding shall be continuous except as noted. Intermittent or spot welds shall be spaced and proportioned to provide ample strength for the material being welded. Weld sizes not indicated shall be equal to the thickness of the least of the joine...
c. All welds shall be properly fused, displaying proper penetration and a professional finish, and must meet the qualification requirements of applicable AWS specifications. Examples of unacceptable weldments are: Cracks, Excessive Splatter, Undercut,...
d. Any weld failing to comply with the AWS specifications or failing to pass a quality assurance inspection performed by the State, will be corrected by the fabricator/contractor, at their expense, and be corrected off State property. The State shall ...
e. For contractors that are located in the State of California, the welding inspection shall be performed and approved by the State Engineer at the contractor’s manufacturing location.
f. For contractors that are located outside of California, the welding inspection shall be performed and approved by an independent third party AWS certified inspector. The third party inspector’s name and qualifications shall be submitted to the Stat...
3.3 INSTALLATION
1. The boarding floats shall be assembled, placed in water, flotation tested and left in water ready for use. The contractor shall, if necessary, adjust pontoons or add floatation/counterweights to produce a level float deck under a “dead load” condit...
3.4 DELIVERY
1. The contractor shall be responsible for obtaining and paying for all transportation permits.
2. The contractor shall be responsible for transportation and storage his/her material and equipment.
3. The contractor shall be responsible for delivery, unloading, floating and installing the boarding floats at the project sites.
4. Boarding floats shall be inspected by the State Engineer at the project site prior to installation, and any damaged sections shall be replaced by the contractor at his own expense. Welding shall comply with the requirements as specified in the Sect...