This is a Bid Worksheet Attachment for acquisition and demolition construction services issued by the North Carolina Department of Public Safety, Division of Emergency Management (NCEM) for Hazard Mitigation Grant Program (HMGP) projects 4827-0026 Group 3 Batch 1 & 2 and 4827-0046 Buncombe County Acquisition and Demolition Group 1. The worksheet covers 72 individual properties located across multiple municipalities in Buncombe County, including Asheville, Swannanoa, Black Mountain, Candler, Barnardsville, and Alexander. Vendors are required to complete detailed line-item cost estimates for each property across two primary work phases: Acquisition (including intake/date of birth calculation, appraisal, title research, document preparation, and closing attorney fees) and Site Demolition (including asbestos/lead inspection and remediation, structure demolition, underground storage tank clearance, and grading/seeding). Vendors must also provide Construction Management Costs and Profit & Overhead charges for each property. The worksheet requires vendors to specify unit of measure, unit price, and quantity for each line item, with three additional miscellaneous cost rows provided per work phase for eligible expenses not otherwise listed. Vendors are instructed to provide an overall project timeframe in days from Notice to Proceed through final closeout for all contracted work.
The bid worksheet explicitly prohibits modifications to the template, including adding or removing line items or altering formulas, with noncompliance grounds for bid rejection. Vendors are responsible for completing all light blue cells and must verify that auto-calculated totals for each work phase and grand total are accurate, with any errors or concerns to be reported immediately to the State using the contact method specified in the Request for Bid. Individual Property Worksheets must be completed in their entirety for all 72 properties, with the worksheet auto-calculating Work Phase Totals from subsequent property-level submissions. The document includes properties designated as commercial, residential, or mixed-use, with property locations, street addresses, Storm #4827, and Project #46 consistently referenced across all worksheets. Pricing information is not specified in the worksheet itself; vendors are expected to develop their own cost estimates based on project requirements and submit all pricing through the structured worksheet format.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SUMMARY SHEET
| North Carolina Department of Public Safety |
| Emergency Management |
| ACQUISITION REQUEST FOR BID WORKSHEET |
| RFB NUMBER: |
| VENDOR: |
| BID DATE: |
| BID SUMMARY | |
| WORK PHASE | TOTAL |
| ACQUISITION | $0.00 |
| SITE DEMOLITION | $0.00 |
| PROFIT & OVERHEAD | $0.00 |
| CONSTRUCTION MANAGEMENT COSTS | $0.00 |
| GRAND TOTAL: | $0.00 |
TOTAL PROJECT TIME (DAYS):
| NOTES: | **Please read the following information carefully** |
| 1) The Vendor shall fill out this Bid Worksheet in its entirety. | |
| 2) Modifications to this worksheet (i.e., adding/removing line items, modifying formulas, etc.) are not permitted. Noncompliance shall constitute grounds to reject Vendor's proposal. | |
| 3) Vendor is responsible for providing information in light blue cells. | |
| 4) This Bid Summary Sheet auto-calculates the Work Phase Totals (Acquisition, Site Demolition, Profit & Overhead, and Management Costs) from subsequent Property Worksheets. Vendor shall verify that all amounts for each individual phase and the Grand Total have been calculated correctly. Any errors or concerns with this worksheet shall be brought to the immediate attention of the State; Vendor shall follow the contact method as specified in the RFB. | |
| 5) Vendor must provide Construction Management Costs and Profit & Overhead Costs for each property, as applicable. | |
| 6) An individual Property Worksheet must be filled out in its entirety for EACH property. Property Worksheets are included within this Bid Worksheet. | |
| 7) Vendor shall note the unit of measure for each line item listed on the Property Worksheet (i.e., linear feet, square feet, hour, flat rate, or any reasonable unit of measure). Vendor shall input a Unit Price and Quantity for every line item (a '1' must be entered in the Quantity column for flat or individual costs). | |
| 8) Additional rows for miscellaneous costs have been provided for each property. Three additional rows per work phase have been provided if the Vendor determines other eligible costs should be provided in their bid. If Vendor elects to use this category, a description of the cost must be provided along with the unit of measure, unit price, and quantity. | |
| 9) Vendor shall provide the anticipated overall project timeframe (i.e., total time to complete work for all properties listed). This estimate, in days, shall begin with the Notice to Proceed and end at closeout for all contracted work. Vendor shall strive to meet this timeframe, as well as any timeframes put forth by NCEM, barring any unexpected acts of nature requiring a change in the Scope of Work and/or Change Order(s). It is the responsibility of the Vendor to create a time schedule, including any phasing or work overlap, in order to complete all projects in the specified timeframe. The timeframe submitted by each Vendor shall be used by the State when evaluating bids as to meet HMGP goals and deadlines. |
REF-SHEET2-DONOTMOVE
*THIS SHEET HAS INTENTIONALLY BEEN LEFT BLANK. DO NOT DELETE.
PROPERTY (1)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 1 Hendersonville Road | ||
| PROJECT #: | 46 | CITY: | Asheville | ||
| Commercial | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (2)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 3 Simpson St | ||
| PROJECT #: | 46 | CITY: | Asheville | ||
| Commercial | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (3)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 5 Whispering Oaks Drive |
| PROJECT #: | 46 | CITY: | Candler |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (4)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 7 Wray Avenue |
| PROJECT #: | 46 | CITY: | Swannanoa |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (5)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 10 Springdale Rd |
| PROJECT #: | 46 | CITY: | Swannanoa |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (6)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 11 Popple St |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (7)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 11 Marble Depot Lane |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (8)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 11 Oak Crescent Drive |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (9)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 12 Brookside Circle |
| PROJECT #: | 46 | CITY: | Chandler |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (10)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 12 Driftwood Court |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (11)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 15 Tessie Lane |
| PROJECT #: | 46 | CITY: | Black Mountain |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (12)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 16 Sweeten Creek Road | ||
| PROJECT #: | 46 | CITY: | Asheville | ||
| Commercial | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (13)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 17 River Knoll Dr |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (14)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 19 River Knoll Dr |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (15)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 21 River Knoll Dr |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (16)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 18 River Meadow Dr |
| PROJECT #: | 46 | CITY: | Swannanoa |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (17)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 18 Sweeten Creek Road |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (18)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 19 Spruce Street |
| PROJECT #: | 46 | CITY: | Barnardsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (19)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 20 Driftwood Court |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (20)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 21 Hummingbird Hill |
| PROJECT #: | 46 | CITY: | Black Mountain |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (21)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 21 Spruce Street |
| PROJECT #: | 46 | CITY: | Barnardsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (22)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 22 Shope Creek Estates Drive |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (23)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 23 Edwin Place |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (24)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 23 Driftwood Court |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (25)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 23 Sky Forest Drive |
| PROJECT #: | 46 | CITY: | Swannanoa |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (26)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 23 River Knoll Drive |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (27)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 25 River Knoll Drive |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (28)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 27 Mulvaney St |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (29)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 35 Higdon Ridge Road |
| PROJECT #: | 46 | CITY: | Swannanoa |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (30)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 48 Swannanoa River Rd Warehouse | ||
| PROJECT #: | 46 | CITY: | Asheville | ||
| Commerical/Residential | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (31)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 48 Swannanoa River Rd Warehouse | ||
| PROJECT #: | 46 | CITY: | Asheville | ||
| Commerical/Residential | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (32)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 51 Old Candler Town Road |
| PROJECT #: | 46 | CITY: | Candler |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (33)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 68 Old Lafayette Lane |
| PROJECT #: | 46 | CITY: | Black Mountain |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (34)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 71 Thompson St |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (35)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 101 Thompson St |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (36)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 105 Willow Lake Dr |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (37)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 107 Willow Lake Dr |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (38)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 109 Willow Lake Dr |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (39)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 111 Willow Lake Dr |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (40)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 111 Thompson Street | ||
| PROJECT #: | 46 | CITY: | Asheville | ||
| Commercial | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (41)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 133 Thompson Street | ||
| PROJECT #: | 46 | CITY: | Asheville | ||
| Commercial | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (42)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 183 London Road |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (43)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 192 Swannanoa River Rd | ||
| PROJECT #: | 46 | CITY: | Asheville | ||
| Commerical | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (44)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 223 E Oakview Road |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (45)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 224 Mulvaney St |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (46)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 345 Azalea Road E |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (47)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 396 Dillingham Road |
| PROJECT #: | 46 | CITY: | Barnardsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (48)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 456 Sand Hill Rd |
| PROJECT #: | 46 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (49)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 500 Lyman Street | ||
| PROJECT #: | 46 | CITY: | Asheville | ||
| Commercial | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (50)
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .