This is a Request for Bid (RFB) Acquisition Bid Worksheet submitted to the North Carolina Department of Public Safety, Division of Emergency Management (NCEM) for Hazard Mitigation Grant Program (HMGP) projects 4827-0026 Group 3 Batch 1 & 2 and 4827-0046 Buncombe County ACQ Demo Group 1. The worksheet covers acquisition and site demolition services across 92 properties located in Buncombe County and surrounding municipalities including Asheville, Swannanoa, Black Mountain, Candler, Weaverville, Fairview, Barnardsville, Fletcher, and Arden. Properties range from residential structures to commercial buildings, with ancillary structures such as sheds, garages, decks, and mobile homes requiring demolition. Vendors must complete individual Property Worksheets for each of the 92 properties, with seven properties marked as withdrawn and multiple properties designated as optioned work. The worksheet requires vendors to itemize all costs including intake/documentation, appraisal, title research, document preparation, closing attorney fees, asbestos/lead inspection and remediation, structure demolition, UST/other clearance, grading/seeding, and miscellaneous costs specific to each property's conditions.
Vendors are responsible for providing Construction Management Costs and Profit & Overhead Costs for each applicable property and must specify unit prices, quantities, and units of measure for all line items. The worksheet contains auto-calculating fields that aggregate costs by work phase (Acquisition, Site Demolition, Profit & Overhead, and Management Costs) and generate a grand total project cost. Property 1 (2 Hendersonville Rd, Asheville) is the only property with populated costs showing $200.00 in profit and overhead and construction management fees; all other properties display $0.00 pending vendor bid submission. The overall project timeframe must be estimated in days from Notice to Proceed through closeout of all contracted work. Vendors are explicitly prohibited from modifying the worksheet structure, formulas, or line items; noncompliance constitutes grounds for proposal rejection. All bid amounts and calculations must be verified for accuracy before submission, with any errors or concerns requiring immediate notification to the State using the contact method specified in the RFB.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SUMMARY SHEET
| North Carolina Department of Public Safety |
| Emergency Management |
| ACQUISITION REQUEST FOR BID WORKSHEET |
| RFB NUMBER: |
| VENDOR: |
| BID DATE: |
| BID SUMMARY | |
| WORK PHASE | TOTAL |
| ACQUISITION | $0.00 |
| SITE DEMOLITION | $0.00 |
| PROFIT & OVERHEAD | $0.00 |
| CONSTRUCTION MANAGEMENT COSTS | $0.00 |
| GRAND TOTAL: | $0.00 |
TOTAL PROJECT TIME (DAYS):
| NOTES: | **Please read the following information carefully** |
| 1) The Vendor shall fill out this Bid Worksheet in its entirety. | |
| 2) Modifications to this worksheet (i.e., adding/removing line items, modifying formulas, etc.) are not permitted. Noncompliance shall constitute grounds to reject Vendor's proposal. | |
| 3) Vendor is responsible for providing information in light blue cells. | |
| 4) This Bid Summary Sheet auto-calculates the Work Phase Totals (Acquisition, Site Demolition, Profit & Overhead, and Management Costs) from subsequent Property Worksheets. Vendor shall verify that all amounts for each individual phase and the Grand Total have been calculated correctly. Any errors or concerns with this worksheet shall be brought to the immediate attention of the State; Vendor shall follow the contact method as specified in the RFB. | |
| 5) Vendor must provide Construction Management Costs and Profit & Overhead Costs for each property, as applicable. | |
| 6) An individual Property Worksheet must be filled out in its entirety for EACH property. Property Worksheets are included within this Bid Worksheet. | |
| 7) Vendor shall note the unit of measure for each line item listed on the Property Worksheet (i.e., linear feet, square feet, hour, flat rate, or any reasonable unit of measure). Vendor shall input a Unit Price and Quantity for every line item (a '1' must be entered in the Quantity column for flat or individual costs). | |
| 8) Additional rows for miscellaneous costs have been provided for each property. Three additional rows per work phase have been provided if the Vendor determines other eligible costs should be provided in their bid. If Vendor elects to use this category, a description of the cost must be provided along with the unit of measure, unit price, and quantity. | |
| 9) Vendor shall provide the anticipated overall project timeframe (i.e., total time to complete work for all properties listed). This estimate, in days, shall begin with the Notice to Proceed and end at closeout for all contracted work. Vendor shall strive to meet this timeframe, as well as any timeframes put forth by NCEM, barring any unexpected acts of nature requiring a change in the Scope of Work and/or Change Order(s). It is the responsibility of the Vendor to create a time schedule, including any phasing or work overlap, in order to complete all projects in the specified timeframe. The timeframe submitted by each Vendor shall be used by the State when evaluating bids as to meet HMGP goals and deadlines. |
PROPERTY (1)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 2 Hendersonville Rd | ||
| PROJECT #: | 26 | CITY: | Asheville | ||
| *Commercial Property | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | $100.00 | ||||
| Construction Management Costs | $100.00 | |||||
| Other Total: | $200.00 |
| Vendor Total: | $200.00 |
| Property Total: | $200.00 |
PROPERTY (2)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 2 Cherry Grove Rd | ||
| PROJECT #: | 26 | CITY: | Asheville | ||
| *OPTIONED | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Deck 12'x24' | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (3)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 3 Mulvaney St | ||
| PROJECT #: | 26 | CITY: | Asheville | ||
| *Commercial Property | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (4)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 3 Pin Oak Ln |
| PROJECT #: | 26 | CITY: | Swannanoa |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (5)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 3 Hemphill Rd |
| PROJECT #: | 26 | CITY: | Black Mountain |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Shed A (Verify) | $0.00 | ||||
| Misc. | Shed B (Verify) | $0.00 | ||||
| Misc. | Shed C (Verify) | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (6)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 3 Rock Laurel Ln |
| PROJECT #: | 26 | CITY: | Candler |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Shed A 12'x8' | $0.00 | ||||
| Misc. | Shed B (Verify) | $0.00 | ||||
| Misc. | Pool 18'x36' | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (7)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 3 Earl Allen Dr | ||
| PROJECT #: | 26 | CITY: | Swannanoa | ||
| *WITHDRAWN | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Shed 12'x12' | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (8)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 3 River Arts Pl | ||
| PROJECT #: | 26 | CITY: | Asheville | ||
| *Commercial Property | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal (Same parcel as 5 & 7 River Arts Pl) | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Shed 14'x14' | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (9)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 5 River Arts Pl | ||
| PROJECT #: | 26 | CITY: | Asheville | ||
| *Commercial Property | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal (Same parcel as 3 & 7 River Arts Pl) | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (10)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 7 River Arts Pl | ||
| PROJECT #: | 26 | CITY: | Asheville | ||
| *Commercial Property | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal (Same parcel as 3 & 5 River Arts Pl) | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (11)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 7 Twin Hills Dr |
| PROJECT #: | 26 | CITY: | Weaverville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Chain Link Fencing | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (12)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 11 Rock Laurel Ln |
| PROJECT #: | 26 | CITY: | Candler |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Work Shop 20'x14' | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (13)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 11 Pin Oak Ln |
| PROJECT #: | 26 | CITY: | Swannanoa |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (14)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 12 River Knoll Dr (Triplex 12, 14, 16) |
| PROJECT #: | 26 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (15)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 14 River Knoll Dr (Triplex 12, 14, 16) |
| PROJECT #: | 26 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (16)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 16 River Knoll Dr (Triplex 12, 14, 16) |
| PROJECT #: | 26 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Garage )Verify Size) | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (17)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 13 Simpson St |
| PROJECT #: | 26 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (18)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 14 River Meadow Dr | ||
| PROJECT #: | 26 | CITY: | Swannanoa | ||
| *OPTIONED | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Shed 15'x10' | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (19)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 15 Good Loop |
| PROJECT #: | 26 | CITY: | Swannanoa |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (20)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 17 Southwinds Dr |
| PROJECT #: | 26 | CITY: | Fairview |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (21)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 17 River Meadow Dr | ||
| PROJECT #: | 26 | CITY: | Swannanoa | ||
| *OPTIONED | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Shed 10'x20' | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (22)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 19 Quail Hollow Drive |
| PROJECT #: | 26 | CITY: | Fairview |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Garage 24'x24' | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (23)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 19 Good Loop |
| PROJECT #: | 26 | CITY: | Swannanoa |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (24)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 20 Earl Allen Dr |
| PROJECT #: | 26 | CITY: | Swannanoa |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Shed A 12'x15' | $0.00 | ||||
| Misc. | Shed B 12'x15' | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (25)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 25 Glendale Ave |
| PROJECT #: | 26 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Cage fencing/Dog Park 100'x50' | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (26)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 26 Bee Meadows Cir |
| PROJECT #: | 26 | CITY: | Swannanoa |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Garage (Verify) | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (27)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 28 Linn Garden Ln | ||
| PROJECT #: | 26 | CITY: | Swannanoa | ||
| *OPTIONED | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (28)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 29 Ox Creek Rd | ||
| PROJECT #: | 26 | CITY: | Weaverville | ||
| *OPTIONED | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (29)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 31 Glendale Ave | ||
| PROJECT #: | 26 | CITY: | Asheville | ||
| *Commercial Property | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Outdoor cage *see 25 Glendale | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (30)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 34 Riverside Dr |
| PROJECT #: | 26 | CITY: | Barnardsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Shed | $0.00 | ||||
| Misc. | Garage | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (31)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 35 Snowy Cove Ln | ||
| PROJECT #: | 26 | CITY: | Black Mountain | ||
| *OPTIONED | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (32)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 38 Glendale Ave |
| PROJECT #: | 26 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (33)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 40 Blue Ridge Development Rd | ||
| PROJECT #: | 26 | CITY: | Fairview | ||
| *OPTIONED | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (34)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 51 Thompson Street |
| PROJECT #: | 26 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (35)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 97 Hickory Tree Rd |
| PROJECT #: | 26 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Shed 10'x16' | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (36)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 97 Hidden River Dr |
| PROJECT #: | 26 | CITY: | Swannanoa |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | ADU/Shed 40'x20' | $0.00 | ||||
| Misc. | Greenhouse 40'x18 (3 units) | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (37)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||||
| STORM #: | 4827 | STREET ADDRESS: | 100 Rivers Edge Rd | ||
| PROJECT #: | 26 | CITY: | Asheville | ||
| *OPTIONED | |||||
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (38)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 110 Stone Dr |
| PROJECT #: | 26 | CITY: | Swannanoa |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Shed A 40'x12' | $0.00 | ||||
| Misc. | Shed B 20'x12' | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (39)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 111 Harrison Ave |
| PROJECT #: | 26 | CITY: | Swannanoa |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (40)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 115 Willow Lake Dr |
| PROJECT #: | 26 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Garage 220 sqft | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (41)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 117 Willow Lake Dr |
| PROJECT #: | 26 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | ERROR:#VALUE! | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | ERROR:#VALUE! | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | ERROR:#VALUE! |
| Property Total: | ERROR:#VALUE! |
PROPERTY (42)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 118 Harrison Ave |
| PROJECT #: | 26 | CITY: | Swannanoa |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (43)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 119 Willow Lake Dr (Quad complex) |
| PROJECT #: | 26 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (44)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 121 Willow Lake Dr (Quad complex) |
| PROJECT #: | 26 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (45)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 123 Willow Lake Dr (Quad complex) |
| PROJECT #: | 26 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (46)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 125 Willow Lake Dr (Quad complex) |
| PROJECT #: | 26 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (47)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 121 Stoney Fork Rd |
| PROJECT #: | 26 | CITY: | Barnardsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Shed 10'x12' | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (48)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 129 Lakeshore Dr |
| PROJECT #: | 26 | CITY: | Weaverville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | Carport 18'x16' | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
PROPERTY (49)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 131 Thompson St |
| PROJECT #: | 26 | CITY: | Asheville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | $0.00 | |||
| Appraisal | $0.00 | ||||
| Title Research | $0.00 | ||||
| Document Prep | $0.00 | ||||
| Closing Attorney Fees | $0.00 |
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Asbestos / Lead Remediation | N/A | $0.00 | 0 | $0.00 | ||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
| Vendor Total: | $0.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .