About this file

This is a Request for Bid (RFB) Acquisition Bid Worksheet submitted to the North Carolina Department of Public Safety, Division of Emergency Management (NCEM) for Hazard Mitigation Grant Program (HMGP) projects 4827-0026 Group 3 Batch 1 & 2 and 4827-0046 Buncombe County ACQ Demo Group 1. The worksheet covers acquisition and site demolition services across 92 properties located in Buncombe County and surrounding municipalities including Asheville, Swannanoa, Black Mountain, Candler, Weaverville, Fairview, Barnardsville, Fletcher, and Arden. Properties range from residential structures to commercial buildings, with ancillary structures such as sheds, garages, decks, and mobile homes requiring demolition. Vendors must complete individual Property Worksheets for each of the 92 properties, with seven properties marked as withdrawn and multiple properties designated as optioned work. The worksheet requires vendors to itemize all costs including intake/documentation, appraisal, title research, document preparation, closing attorney fees, asbestos/lead inspection and remediation, structure demolition, UST/other clearance, grading/seeding, and miscellaneous costs specific to each property's conditions.

Vendors are responsible for providing Construction Management Costs and Profit & Overhead Costs for each applicable property and must specify unit prices, quantities, and units of measure for all line items. The worksheet contains auto-calculating fields that aggregate costs by work phase (Acquisition, Site Demolition, Profit & Overhead, and Management Costs) and generate a grand total project cost. Property 1 (2 Hendersonville Rd, Asheville) is the only property with populated costs showing $200.00 in profit and overhead and construction management fees; all other properties display $0.00 pending vendor bid submission. The overall project timeframe must be estimated in days from Notice to Proceed through closeout of all contracted work. Vendors are explicitly prohibited from modifying the worksheet structure, formulas, or line items; noncompliance constitutes grounds for proposal rejection. All bid amounts and calculations must be verified for accuracy before submission, with any errors or concerns requiring immediate notification to the State using the contact method specified in the RFB.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SUMMARY SHEET

North Carolina Department of Public Safety
Emergency Management
ACQUISITION REQUEST FOR BID WORKSHEET
RFB NUMBER:
VENDOR:
BID DATE:
BID SUMMARY
WORK PHASETOTAL
ACQUISITION$0.00
SITE DEMOLITION$0.00
PROFIT & OVERHEAD$0.00
CONSTRUCTION MANAGEMENT COSTS$0.00
GRAND TOTAL:$0.00

TOTAL PROJECT TIME (DAYS):

NOTES:**Please read the following information carefully**
1) The Vendor shall fill out this Bid Worksheet in its entirety.
2) Modifications to this worksheet (i.e., adding/removing line items, modifying formulas, etc.) are not permitted. Noncompliance shall constitute grounds to reject Vendor's proposal.
3) Vendor is responsible for providing information in light blue cells.
4) This Bid Summary Sheet auto-calculates the Work Phase Totals (Acquisition, Site Demolition, Profit & Overhead, and Management Costs) from subsequent Property Worksheets. Vendor shall verify that all amounts for each individual phase and the Grand Total have been calculated correctly. Any errors or concerns with this worksheet shall be brought to the immediate attention of the State; Vendor shall follow the contact method as specified in the RFB.
5) Vendor must provide Construction Management Costs and Profit & Overhead Costs for each property, as applicable.
6) An individual Property Worksheet must be filled out in its entirety for EACH property. Property Worksheets are included within this Bid Worksheet.
7) Vendor shall note the unit of measure for each line item listed on the Property Worksheet (i.e., linear feet, square feet, hour, flat rate, or any reasonable unit of measure). Vendor shall input a Unit Price and Quantity for every line item (a '1' must be entered in the Quantity column for flat or individual costs).
8) Additional rows for miscellaneous costs have been provided for each property. Three additional rows per work phase have been provided if the Vendor determines other eligible costs should be provided in their bid. If Vendor elects to use this category, a description of the cost must be provided along with the unit of measure, unit price, and quantity.
9) Vendor shall provide the anticipated overall project timeframe (i.e., total time to complete work for all properties listed). This estimate, in days, shall begin with the Notice to Proceed and end at closeout for all contracted work. Vendor shall strive to meet this timeframe, as well as any timeframes put forth by NCEM, barring any unexpected acts of nature requiring a change in the Scope of Work and/or Change Order(s). It is the responsibility of the Vendor to create a time schedule, including any phasing or work overlap, in order to complete all projects in the specified timeframe. The timeframe submitted by each Vendor shall be used by the State when evaluating bids as to meet HMGP goals and deadlines.

PROPERTY (1)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:2 Hendersonville Rd
PROJECT #:26CITY:Asheville
*Commercial Property
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead$100.00
Construction Management Costs$100.00
Other Total:$200.00
Vendor Total:$200.00
Property Total:$200.00

PROPERTY (2)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:2 Cherry Grove Rd
PROJECT #:26CITY:Asheville
*OPTIONED
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Deck 12'x24'$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (3)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:3 Mulvaney St
PROJECT #:26CITY:Asheville
*Commercial Property
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (4)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:3 Pin Oak Ln
PROJECT #:26CITY:Swannanoa
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (5)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:3 Hemphill Rd
PROJECT #:26CITY:Black Mountain
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Shed A (Verify)$0.00
Misc.Shed B (Verify)$0.00
Misc.Shed C (Verify)$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (6)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:3 Rock Laurel Ln
PROJECT #:26CITY:Candler
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Shed A 12'x8'$0.00
Misc.Shed B (Verify)$0.00
Misc.Pool 18'x36'$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (7)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:3 Earl Allen Dr
PROJECT #:26CITY:Swannanoa
*WITHDRAWN
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Shed 12'x12'$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (8)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:3 River Arts Pl
PROJECT #:26CITY:Asheville
*Commercial Property
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal (Same parcel as 5 & 7 River Arts Pl)$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Shed 14'x14'$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (9)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:5 River Arts Pl
PROJECT #:26CITY:Asheville
*Commercial Property
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal (Same parcel as 3 & 7 River Arts Pl)$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (10)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:7 River Arts Pl
PROJECT #:26CITY:Asheville
*Commercial Property
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal (Same parcel as 3 & 5 River Arts Pl)$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (11)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:7 Twin Hills Dr
PROJECT #:26CITY:Weaverville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Chain Link Fencing$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (12)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:11 Rock Laurel Ln
PROJECT #:26CITY:Candler
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Work Shop 20'x14'$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (13)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:11 Pin Oak Ln
PROJECT #:26CITY:Swannanoa
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (14)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:12 River Knoll Dr (Triplex 12, 14, 16)
PROJECT #:26CITY:Asheville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (15)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:14 River Knoll Dr (Triplex 12, 14, 16)
PROJECT #:26CITY:Asheville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (16)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:16 River Knoll Dr (Triplex 12, 14, 16)
PROJECT #:26CITY:Asheville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Garage )Verify Size)$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (17)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:13 Simpson St
PROJECT #:26CITY:Asheville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (18)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:14 River Meadow Dr
PROJECT #:26CITY:Swannanoa
*OPTIONED
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Shed 15'x10'$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (19)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:15 Good Loop
PROJECT #:26CITY:Swannanoa
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (20)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:17 Southwinds Dr
PROJECT #:26CITY:Fairview
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (21)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:17 River Meadow Dr
PROJECT #:26CITY:Swannanoa
*OPTIONED
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Shed 10'x20'$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (22)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:19 Quail Hollow Drive
PROJECT #:26CITY:Fairview
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Garage 24'x24'$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (23)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:19 Good Loop
PROJECT #:26CITY:Swannanoa
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (24)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:20 Earl Allen Dr
PROJECT #:26CITY:Swannanoa
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Shed A 12'x15'$0.00
Misc.Shed B 12'x15'$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (25)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:25 Glendale Ave
PROJECT #:26CITY:Asheville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Cage fencing/Dog Park 100'x50'$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (26)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:26 Bee Meadows Cir
PROJECT #:26CITY:Swannanoa
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Garage (Verify)$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (27)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:28 Linn Garden Ln
PROJECT #:26CITY:Swannanoa
*OPTIONED
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (28)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:29 Ox Creek Rd
PROJECT #:26CITY:Weaverville
*OPTIONED
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (29)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:31 Glendale Ave
PROJECT #:26CITY:Asheville
*Commercial Property
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Outdoor cage *see 25 Glendale$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (30)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:34 Riverside Dr
PROJECT #:26CITY:Barnardsville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Shed$0.00
Misc.Garage$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (31)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:35 Snowy Cove Ln
PROJECT #:26CITY:Black Mountain
*OPTIONED
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (32)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:38 Glendale Ave
PROJECT #:26CITY:Asheville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (33)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:40 Blue Ridge Development Rd
PROJECT #:26CITY:Fairview
*OPTIONED
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (34)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:51 Thompson Street
PROJECT #:26CITY:Asheville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (35)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:97 Hickory Tree Rd
PROJECT #:26CITY:Asheville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Shed 10'x16'$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (36)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:97 Hidden River Dr
PROJECT #:26CITY:Swannanoa
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.ADU/Shed 40'x20'$0.00
Misc.Greenhouse 40'x18 (3 units)$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (37)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:100 Rivers Edge Rd
PROJECT #:26CITY:Asheville
*OPTIONED
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (38)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:110 Stone Dr
PROJECT #:26CITY:Swannanoa
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Shed A 40'x12'$0.00
Misc.Shed B 20'x12'$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (39)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:111 Harrison Ave
PROJECT #:26CITY:Swannanoa
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (40)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:115 Willow Lake Dr
PROJECT #:26CITY:Asheville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Garage 220 sqft$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (41)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:117 Willow Lake Dr
PROJECT #:26CITY:Asheville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure DemolitionERROR:#VALUE!
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:ERROR:#VALUE!
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:ERROR:#VALUE!
Property Total:ERROR:#VALUE!

PROPERTY (42)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:118 Harrison Ave
PROJECT #:26CITY:Swannanoa
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (43)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:119 Willow Lake Dr (Quad complex)
PROJECT #:26CITY:Asheville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (44)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:121 Willow Lake Dr (Quad complex)
PROJECT #:26CITY:Asheville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (45)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:123 Willow Lake Dr (Quad complex)
PROJECT #:26CITY:Asheville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (46)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:125 Willow Lake Dr (Quad complex)
PROJECT #:26CITY:Asheville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (47)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:121 Stoney Fork Rd
PROJECT #:26CITY:Barnardsville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Shed 10'x12'$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (48)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:129 Lakeshore Dr
PROJECT #:26CITY:Weaverville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.Carport 18'x16'$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00
Property Total:$0.00

PROPERTY (49)

ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET
STORM #:4827STREET ADDRESS:131 Thompson St
PROJECT #:26CITY:Asheville
WORK PHASEITEMIZED WORKUNIT OF MEASUREUNIT PRICEQUANTITYITEMIZED COST
AcquisitionIntake / DOB Calculation$0.00
Appraisal$0.00
Title Research$0.00
Document Prep$0.00
Closing Attorney Fees$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Acquisition Total:$0.00
Site DemolitionAsbestos / Lead Inspection$0.00
Asbestos / Lead RemediationN/A$0.000$0.00
Structure Demolition$0.00
UST / Other Clearance$0.00
Grade / Seed$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Misc.N/A or Provide Details$0.00
Site Demolition Total:$0.00
OtherProfit & Overhead
Construction Management Costs
Other Total:$0.00
Vendor Total:$0.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .