About this file

This is a complete set of architectural, mechanical, electrical, plumbing and fire protection construction drawings for site preparation work to install a True Beam Linear Accelerator at the James J. Peters VA Medical Center in Bronx, NY (Project #526-CSI-137). The drawings detail renovations to Building 100's ground floor radiation therapy wing to accommodate the new equipment.

The drawing set includes 24 sheets covering demolition and new construction plans, with detailed interior elevations, millwork details, and equipment schedules. Key aspects include modifications to the control room, treatment room, and RF vestibule; updates to HVAC, electrical, and plumbing systems; fire protection revisions; and installation of specialized electrical infrastructure to support the linear accelerator. The facility will remain fully sprinklered throughout construction. The drawings are marked as 100% Construction Submission dated February 16, 2024, prepared by Fellenzer Engineering LLP of Middletown, NY.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--Site Support for True Beam for Linear Accelerator, newest first.
File Type Posted
36C24224B0049 0002.docx DOCX document
526CSI137 RFI Response Summary Memo.pdf PDF
36C24224B0049 0001.docx DOCX document
Site Prep for Linear Accelerator_Site Visit Sign In Sheet-1-6-25.pdf PDF
36C24224B0049_1.docx DOCX document
100 CD Submission Specifications VA 526-CSI-137 10-10-24.pdf PDF
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (DEVIATION).pdf PDF
FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx DOCX document
DAVIS BACON WAGE RATES_UPDATED 12.6.2024.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F i l e

N a m e

C

U s e r s s r b

A p p

D a t a L o c a l T e m p A c P u b l i s h

G

I d w g

L a y o u t

G

I

D a t e

T u e

F e b

P

M

N a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

COVER SHEET WITH INDEX OF DRAWINGS1 GI-001

SITE LOCATION

GENERAL INFORMATION:

GROUND FLOOR ICRA & LIFE SAFETY PLANS

GI-003

ARCHITECTURAL:

AS-001

AS-101

ARCHITECTURAL: SYMBOLS, ABBREVIATIONS, NOTES, DETAILS & SCHEDULE

ARCHITECTURAL: GROUND FLOOR & REFLECTIVE CEILING DEMOLITION & CONSTRUCTION PLANS

HVAC: SYMBOLS, ABBREVIATIONS, NOTES, DETAILS & EQUIPMENT SCHEDULE MH-001

HVAC:

HVAC: GROUND FLOOR DEMOLITION & CONSTRUCTION DUCTWORK PLANSMH-101

PLUMBING: SYMBOLS, ABBREVIATIONS, NOTES, DETAILS & EQUIPMENT SCHEDULE PL-001

PLUMBING:

PLUMBING: GROUND FLOOR DEMOLITION & CONSTRUCTION SANITARY & DOMESTIC WATER PLANSPL-101

FIRE PROTECTION: SYMBOLS, ABBREVIATIONS, NOTES & DETAILSFX-001

FIRE PROTECTION:

FIRE PROTECTION: GROUND FLOOR DEMOLITION & CONSTRUCTION SPRINKLER PLANSFX-101

ELECTRICAL: SYMBOLS, ABBREVIATIONS, NOTES, DETAILS & EQUIPMENT SCHEDULE ES-001

ELECTRICAL:

ELECTRICAL: GROUND FLOOR DEMOLITION & CONSTRUCTION POWER PLANSES-101

GROUND FLOOR SAFETY PLANGI-002

ELECTRICAL: DETAILSES-701

ELECTRICAL: SCHEDULESES-801

AS-401 ARCHITECTURAL: CONTROL ROOM INTERIOR ELEVATIONS

AS-801 ARCHITECTURAL: FINISH SCHEDULES & DETAILS

ELECTRICAL: GROUND FLOOR DEMOLITION & CONSTRUCTION LIGHTING PLANSES-201

ELECTRICAL: GROUND FLOOR DEMOLITION & CONSTRUCTION CONDUIT LAYOUT PLANSES-102

AS-402 ARCHITECTURAL: TREATMENT ROOM INTERIOR ELEVATIONS

AS-403 ARCHITECTURAL: RF VESTIBULE INTERIOR ELEVATIONS AND WALL SECTIONS

AS-201 ARCHITECTURAL: ENLARGED FLOOR PLAN

AS-701 ARCHITECTURAL: MILLWORK DETAILS

AS-702 ARCHITECTURAL: MILLWORK DETAILS

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

WEBB

AVENUE

A

V

E

N

U

E

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

W

A

L

L

W

A

L

L

W

A

L

L

W

A

L L

W

A L L

W

A L L

W

A

L

L

W

A

L

L

WALL

W

A L L

R

A

M

P

R

A

M

P

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

GATE

GATE

RADIATION

THERAPY

WING

X

X

X

X

X

X

X

X

X

C

O

U

R

T

Y

A

R

D

C

O

U

R

T

Y

A

R

D

CANOPY

C

A

N

O

P

Y

C

A

N

O

P

Y

COURT-

YARD

COURT-

YARD

S

I

D

E

W

A

L

K S

I

D

E

W

A

L

K

F i l e

N a m e

F

V

A

B

R O

I N

E A

R

A

C C

E L

E R

A T

O R

G

I d a y o u t

G

I

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

BUILDING 100 PHASING PLAN

SAFETY NOTES:

GENERAL NOTES:

STAGING & PHASING NOTES:

8' TEMPORARY CONSTRUCTION FENCING DETAIL

WITH DOUBLE MAN GATE DETAIL

TEMPORARY CONSTRUCTION FENCING

AREA NOT IN

CONTRACT

AREA NOT IN

CONTRACT

F i l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

G

I d a y o u t

G

I

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

ARCHITECTURAL: GROUND FLOOR ICRA PLAN

Description of Required Infection Control Precautions by Class

During Construction Project Upon Completion of

1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

4. Contain construction waste before transport in tightly covered containers.

5. Cover transport receptacles or carts. Tape covering unless solid lid.

6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transportation in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering unless solid lid.

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

C l a s s

I V

PATIENT RISK GROUP FOR "TYPE D" CONSTRUCTION

LOW RISK GROUP

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP

Class IV

Class III / IV

Class IV

Class IV

NOTES:

NOTE:

ICRA TEMPORARY PARTITION DETAILS

ICRA HARD WALL BARRIER

(ONE HOUR FIRE RATED)

KEYED NOTES:

ARCHITECTURAL: GROUND FLOOR LIFE SAFETY PLAN

LIFE SAFETY LEGEND:

NOTE:

l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

A

R C

H I T

E C

T U

R A

L A

S d a y o u t

A

S

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

ABBREVIATIONS

GENERAL SYMBOLS

GENERAL NOTES:

²

HT

ISOMETRIC

TYPICAL GRAB BARS AND CABINETS

ANCHORAGE -

TYPICAL MOUNTING HEIGHTS

NOTE:

RCP LEGENDFLOOR PLAN LEGEND

AREA NOT IN

CONTRACT

AREA NOT IN

CONTRACT

AREA NOT IN

CONTRACT

F i l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

A

R C

H I T

E C

T U

R A

L A

S d a y o u t

A

S

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

ARCHITECTURAL: GROUND FLOOR DEMOLITION PLAN

ARCHITECTURAL: GROUND FLOOR CONSTRUCTION PLAN

ARCHITECTURAL: GROUND FLOOR REFLECTIVE CEILING DEMOLITION PLAN

ARCHITECTURAL: GROUND FLOOR REFLECTIVE CEILING CONSTRUCTION PLAN

ARCHITECTURAL: FLOOR SAWCUT DETAIL

1A

DEDUCT ALTERNATE 1

DEDUCT ALTERNATE 1

AREA NOT IN

CONTRACT

F i l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

A

R C

H I T

E C

T U

R A

L A

S d a y o u t

A

S

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

ARCHITECTURAL: ENLARGED FLOOR PLAN

ARCHITECTURAL: AREA OF NEW FINISHED FLOORING

GENERAL NOTES:

INTERIOR ELEVATION CONTROL ROOM - NORTH

F i l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

A

R C

H I T

E C

T U

R A

L A

S d a y o u t

A

S

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

INTERIOR ELEVATION CONTROL ROOM - WEST

INTERIOR ELEVATION CONTROL ROOM - EAST

INTERIOR ELEVATION CONTROL ROOM - SOUTH

INTERIOR ELEVATION RF ROOM - WEST

F i l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

A

R C

H I T

E C

T U

R A

L A

S d a y o u t

A

S

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

INTERIOR ELEVATION RF ROOM - EAST

INTERIOR ELEVATION RF ROOM - NORTH

INTERIOR ELEVATION RF ROOM - SOUTH

i l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

A

R C

H I T

E C

T U

R A

L A

S d a y o u t

A

S

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

INTERIOR ELEVATION RF VESTIBULE - NORTH

INTERIOR ELEVATION RF VESTIBULE - EAST

INTERIOR ELEVATION RF VESTIBULE - SOUTH

INTERIOR ELEVATION RF VESTIBULE - WEST

ILLUMINATED WALL PANEL DETAILS

l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

A

R C

H I T

E C

T U

R A

L A

S d a y o u t

A

S

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

CASEWORK DETAIL

CASEWORK DETAIL

CASEWORK DETAIL

CASEWORK DETAIL

CASEWORK DETAIL

CASEWORK DETAIL

CASEWORK DETAIL

COUNTER DETAIL

l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

A

R C

H I T

E C

T U

R A

L A

S d a y o u t

A

S

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

EXISTING LINAC ACCESSORY STORAGE MILLWORK

EXISTING MILLWORK SECTION

CASEWORK DETAIL

CASEWORK DETAIL

CASEWORK DETAIL

l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

A

R C

H I T

E C

T U

R A

L A

S d a y o u t

A

S

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

NOTES:

ROOM FINISH SCHEDULE

FINISH SCHEDULE

NOTE:

SUSPENDED CEILING DETAIL

COMPACTED SUBBASE

EXIST. SLAB

6"

EXIST.

TRENCH

16" LG. #4 DOWEL @ 16" O.C. ALT. SIDES OF

TRENCH EMBEDDED INTO EXISTING SLAB W/

HILTI HIT-HY 200 (4" EMBED.)

REMOVE LOOSE SOIL

BELOW EXIST. SLAB

COAT FACE OF CONCRETE W/

BONDING AGENT SIMILAR TO

SIKADUR 32

COMPACTED SUBBASE

EXIST. SLAB

6"

16" LG. #4 DOWEL @ 16" O.C. ALT. SIDES OF

TRENCH

TRENCH EMBEDDED INTO EXISTING SLAB W/

HILTI HIT-HY 200 (4" EMBED.)

REMOVE LOOSE SOIL

BELOW EXIST. SLAB

COAT FACE OF CONCRETE W/

BONDING AGENT SIMILAR TO

SIKADUR 32

TYPICAL DETAIL - TRENCH FILL-IN

TYPICAL DETAIL - CONDUIT INFILL

EXPOSED GRID ACOUSTICAL TILE CEILING DETAIL

l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

H

V A

C M

H d a y o u t

M

H

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

GENERAL NOTES:

ABBREVIATIONSDUCTWORK SYMBOLS

GENERAL SYMBOLS

AHU REFURBISHMENT NOTES:

HVAC DEMOLITION NOTES:

ENERGY CODE STATEMENT:

UNIFORM CODE STATEMENT:

TYPICAL DIFFUSER CONNECTION

FLEX DUCT SUPPORT

AREA NOT IN

CONTRACT

F i l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

H

V A

C M

H d a y o u t

M

H

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

HVAC: GROUND FLOOR DEMOLITION DUCTWORK PLAN

HVAC: GROUND FLOOR CONSTRUCTION DUCTWORK PLAN

CONSTRUCTION GENERAL NOTE:

KEYED NOTES:

DEMOLITION GENERAL NOTE:

l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

P

L U

M B

I N

G P

L d a y o u t

P

L

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

GENERAL SYMBOLS

GENERAL PLUMBING NOTES:GENERAL NOTES:

PLUMBING DEMOLITION NOTES:

PLUMBING LINE TYPES

PIPING SYMBOLS VALVE SYMBOLS ABBREVIATIONS

ENERGY CODE STATEMENT:

UNIFORM CODE STATEMENT:

AREA NOT IN

CONTRACT

F i l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

P

L U

M B

I N

G P

L d a y o u t

P

L

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

PLUMBING: GROUND FLOOR DEMOLITION SANITARY & DOMESTIC WATER PLAN

PLUMBING: GROUND FLOOR CONSTRUCTION SANITARY & DOMESTIC WATER PLAN

l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

F

I R

E

P

R O

T E

C T

I O

N F

X d a y o u t

F

X

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

PIPING SYMBOLS

GENERAL SYMBOLS

ABBREVIATIONS

FIRE PROTECTION SYSTEM NOTES:SPRINKLER DEMOLITION NOTES:

SPRINKLER LEGEND

ENERGY CODE STATEMENT:

UNIFORM CODE STATEMENT:

HEAD CONNECTION TO NEW CEILING

DETAIL OF MODIFIED SPRINKLER

AREA NOT IN

CONTRACT

F i l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

F

I R

E

P

R O

T E

C T

I O

N F

X d a y o u t

F

X

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

FIRE PROTECTION: GROUND FLOOR DEMOLITION SPRINKLER PLAN

FIRE PROTECTION: GROUND FLOOR CONSTRUCTION SPRINKLER PLAN

KEYED NOTE:

GENERAL NOTE:

l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

E

L E

C T

R I C

A L

E

S d a y o u t

E

S

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

COMMUNICATION SYMBOLS

GENERAL SYMBOLS

ELECTRICAL DEMOLITION NOTES:

LIGHTING SYMBOLS POWER SYMBOLS

ELECTRICAL LINE TYPES

GENERAL NOTES:

ABBREVIATIONS

ENERGY CODE STATEMENT:

UNIFORM CODE STATEMENT:

AREA NOT IN

CONTRACT

F i l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

E

L E

C T

R I C

A L

E

S d a y o u t

E

S

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

ELECTRICAL: GROUND FLOOR DEMOLITION POWER PLAN

ELECTRICAL: GROUND FLOOR CONSTRUCTION POWER PLAN

DEMOLITION KEYED NOTE:

CONSTRUCTION KEYED NOTES:

GENERAL NOTES:

F i l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

E

L E

C T

R I C

A L

E

S d a y o u t

E

S

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

ELECTRICAL: GROUND FLOOR CONSTRUCTION CONDUIT PLAN

CONSTRUCTION KEYED NOTES: GENERAL NOTES:

RELAY JUNCTION BOX CONNECTIONS DETAIL

MODULATOR PULL BOX DETAIL

AREA NOT IN

CONTRACT

F i l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

E

L E

C T

R I C

A L

E

S d a y o u t

E

S

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

ELECTRICAL: GROUND FLOOR DEMOLITION LIGHTING PLAN

ELECTRICAL: GROUND FLOOR CONSTRUCTION LIGHTING PLAN

CONSTRUCTION KEYED NOTES:

GENERAL NOTE:

l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

E

L E

C T

R I C

A L

E

S d a y o u t

E

S

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

CONDUIT PENETRATION

IN FIRE RATED CONCRETE FLOOR

IN FIRE RATED MASONRY PARTITION

CONDUIT PENETRATION

MOUNTING HEIGHTS OF ELECTRICAL DEVICES

TYPICAL MULTI-LEVEL LIGHT SWITCHING DETAIL

RECESSED FIXTURE MOUNTING DETAIL

LAY-IN LIGHT FIXTURE SUPPORT DETAIL

LAY-IN LIGHT FIXTURE SUPPORT DETAIL

ELECTRICAL ONE-LINE FOR DUCTLESS SPLIT UNITS

NOTES:

l e

N a m e

F

V

A

B

R O

N

E A

R

A

C C

E L

E R

A T

O R

E

L E

C T

R I C

A L

E

S d a y o u t

E

S

D a t e

T u e

F a m e s r b

2/16/24

SITE PREP FOR TRUE BEAM

LINEAR ACCELERATOR

BRONX, N.Y.

FULLY SPRINKLERED

100% CONSTRUCTION SUBMISSION

ENGINEERING LLPFE PROJECT NO: 22-218

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

526-CSI-137

Sheets and Views
GI-001-GI-001
GI-002-GI-002
GI-003-GI-003
100-AS-001-100-AS-001
100-AS-101-100-AS-101
100-AS-201-100-AS-201
100-AS-401-AS-401
100-AS-401-AS-402
100-AS-401-AS-403
100-AS-701-100-AS-701
100-AS-701-100-AS-702
100-AS-801-100-AS-801
100-MH-001-100-MH-001
100-MH-101-100-MH-101
100-PL-001-100-PL-001
100-PL-101-100-PL-101
100-FX-001-100-FX-001
100-FX-101-100-FX-101
100-ES-001-100-ES-001
100-ES-101-100-ES-101
100-ES-102-100-ES-102
100-ES-201-100-ES-201
100-ES-701-100-ES-701
100-ES-801-100-ES-801

File details come from the government source that posted it. Updated .