BREECH LOCK RFOP BOAST_ELW 5-22.xlsx
XLSX spreadsheet 53 KB Posted
- Solicitation number
- PANDTA-25-P-0000_027548
- Issued by
-
Department of the Army
About this file
This is a Request for Order Proposal (RFOP) issued by the U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA) under the Basic Ordering Agreement Sustainment Track (BOAST) program for breech lock components used with machine guns. The solicitation (PANDTA-25-P-0000_027548) is a Total Small Business Set-Aside competitive action with a response due date of June 29, 2026, at 1:00 PM EDT. Questions must be submitted by June 15, 2026, at 1:00 PM EDT. The requirement includes 10 different NSN-designated breech lock components and related tools across three phases: First Article Testing (1 unit each of 10 CLINs), Production (varying quantities totaling 1,794 units across CLINs 1001-1010), and an Option phase (identical quantities to production). The Government intends to award a firm-fixed-price order to the lowest-priced responsible BOA holder; all proposals must be submitted via email with a subject line identifying the company name and RFOP number. To be eligible for award, vendors must have a fully executed BOAST BOA in place by the closing date.
Key technical and contractual requirements include First Article Test (FAT) delivery within 150 calendar days, with the Government allowing up to 30 days for FAT evaluation and approval. All remaining production units must be delivered within 150 calendar days from written FAT approval, and option units within 150 calendar days of the option exercise. The requirement is non-commercial and subject to export control restrictions, requiring vendors to obtain DD Form 2345 certification through the Joint Certification Program (JCP) to access the Technical Data Package (TDP). Inspection and acceptance occur at origin with FOB destination. The solicitation incorporates numerous FAR clauses and DFARS provisions covering areas such as inspection, specialty metals restrictions, heavy phosphate coating requirements, first article contractor testing, configuration management, OPSEC training, and CIAR requirements. Deliverables include Engineering Change Proposals (ECPs), Requests for Variance (RFVs), Notices of Revision (NORs), and Acceptance Inspection Equipment (AIE) reports. The contracting points of contact are Ashley S. Treier (Contract Specialist) and Elizabeth Levine-Welhouse (Contracting Officer), with technical inquiries directed to BOAST@army.mil. Delivery is scheduled to DLA Distribution Anniston in Alabama.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BREECH LOCK RFOP BOAST_29JUN2026.xlsx | XLSX spreadsheet | |
| PANDTA-25-P-0000_027548_QA_29JUN2026.xlsx | XLSX spreadsheet | |
| PANDTA-25-P-0000_027548_QA.xlsx | XLSX spreadsheet | |
| BREECH LOCK RFOP BOAST_24JUN2026.xlsx | XLSX spreadsheet | |
| BREECH LOCK RFOP BOAST_ELW 5-22.xlsx | XLSX spreadsheet | |
| PANDTA-25-P-0000_027548_QA.xlsx | XLSX spreadsheet | |
| BREECH LOCK BUNDLE_CDRLs.pdf | ||
| Attach A -- CUI 2024 1 (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFOP
BASIC ORDERING AGREEMENT SUSTAINMENT TRACK (BOAST): Request for Order Proposal (RFOP)
NOTICE ID: PANDTA-25-P-0000 027548 DATE ISSUED: 26-May-2026 RESPONSE DUE: 29 JUN 2026, 1PM EDT
| ISSUE BY: | U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA) | CONTRACTOR: |
| ATTN: | BOAST@army.mil | UIE / CAGE: |
| Ashley S. Treier, Contract Specialist, ashley.s.treier.civ@army.mil | ADDRESS: | |
| Elizabeth Levine-Welhouse, Contracting Officer, elizabeth.l.levinewelhouse.civ@army.mil | POC NAME: | |
| POC EMAIL: | ||
| POC PHONE: | ||
| BOA NUMBER: |
GENERAL INFORMATION I. This Request for Order Proposal (RFOP) is a competitive action to solicit proposals for the supplies/services detailed below. While all responsible sources may submit a proposal, award is contingent upon the mandatory eligibility requirements detailed below. The resulting order will be a firm-fixed-price contract placed under the BOAST program.
II. Information regarding the program's continuous on-ramp process can be found in the standing BOAST program notice on SAM.gov under ID W912CH-26-R-0001. Vendors are encouraged to proactively establish a BOA to ensure eligibility for future requirements.
III. All questions regarding this RFOP must be submitted in writing to the Point of Contact no later than 15 JUN 2026, 1PM EDT
| REQUIREMENT DETAILS | Supply / Service: | Breech Lock Selector for the Machine Gun Cam. |
| NSN / Description: | 1005-01-629-5635, 1005-01-536-5640, 1005-01-536-5643, 1005-01-629-6807, 1005-01-629-5685, 1005-01-629-6801, 1005-01-629-5688, 1005-01-629-5684, 1005-01-629-7417, 1005-01-629-6783. | |
| TDP / DWG No . | 13027998-2: 19200 | |
| Commerciality: | Non-Commercial | |
| NAICS: | 336412 | |
| Size Standard: | 1250 Employees | |
| Set-Aside Status: | Small Business Set-Aside | |
| Small Business Subcontracting Plan: | Not Required | |
| Order Rating: | DO | |
| Packaging Level: | Military B | |
| Ship-To Location: | SR W0LX ARMY GENERAL SUPPLY |
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON, AL, 36201-4199
| Inspect / Accept: | Origin |
| FOB: | Destination |
| Delivery Schedule: | Schedule with First Article Test (FAT) Requirement: |
The First Article Test (FAT) unit(s) specified in CLINs 0001-0010 shall be delivered within 150 calendar days ARO. Alternative schedules for the FAT unit(s) will not be considered. The Government requires up to 30 days for FAT evaluation and written approval/disapproval.
All remaining production units shall be delivered within 150 calendar days from the date of written FAT approval. Units on the option CLIN shall be delivered 150 calendar days from the date of the option being exercised. Alternate delivery schedules for the production and option units will be considered for this order. See Evaluation for Award Below.
Any acceleration in First Article Test Approval will be subtracted from the delivery schedule of the production units.
| PRICING SHEET | |||||||||||
| Line Item | Description | Noun | NSN | Part No. | PRON / 1095 | Quantity | Unit of Measure | Del Sch / Rate | Unit Price | Total Price | Notes |
| 0001 | FIRST ARTICLE TESTING | CAM, BREECH LOCK, MAC | 1005-01-629-5635 | 13027998-2 | EH5C0345EH | 1 | LO | ||||
| 0002 | FIRST ARTICLE TESTING | LOCK BREECH, MACHINE | 1005-01-536-5640 | 13028643 | EH6C0336EH | 1 | LO | ||||
| 0003 | FIRST ARTICLE TESTING | LOCK BREECH, MACHINE | 1005-01-536-5643 | 13028639 | EH6C0337EH | 1 | LO | ||||
| 0004 | FIRST ARTICLE TESTING | TOOL BREECH LOCK | 1005-01-629-6807 | 13027998-8 | EH5C0314EH | 1 | LO | ||||
| 0005 | FIRST ARTICLE TESTING | TOOL BREECH LOCK | 1005-01-629-5685 | 13027998-6 | EH5C0315EH | 1 | LO | ||||
| 0006 | FIRST ARTICLE TESTING | TOOL BREECH LOCK | 1005-01-629-6801 | 13027998-4 | EH5C0316EH | 1 | LO | ||||
| 0007 | FIRST ARTICLE TESTING | TOOL BREECH LOCK | 1005-01-629-5688 | 13027998-5 | EH5C0334EH | 1 | LO | ||||
| 0008 | FIRST ARTICLE TESTING | TOOL BREECH LOCK | 1005-01-629-5684 | 130227998 | EH5C0335EH | 1 | LO | ||||
| 0009 | FIRST ARTICLE TESTING | TOOL BREECH LOCK | 1005-01-629-7417 | 13027998-3 | EH5C0794EH | 1 | LO | ||||
| 0010 | FIRST ARTICLE TESTING | TOOL BREECH LOCK | 1005-01-629-6783 | 13027998-7 | EH5C0274EH | 1 | LO |
| 1001 | PRODUCTION CAM, BREECH LOCK, MAC | CAM, BREECH LOCK, MAC | 1005-01-629-5635 | 13027998-2 | EH5C0345EH | 143 | EA | 0 |
| 1002 | PRODUCTION LOCK BREECH, MACHINE | LOCK BREECH, MACHINE | 1005-01-536-5640 | 13028643 | EH6C0336EH | 216 | EA | 0 |
| 1003 | PRODUCTION LOCK BREECH, MACHINE | LOCK BREECH, MACHINE | 1005-01-536-5643 | 13028639 | EH6C0337EH | 477 | EA | 0 |
| 1004 | PRODUCTION TOOL BREECH LOCK | TOOL BREECH LOCK | 1005-01-629-6807 | 13027998-8 | EH5C0314EH | 187 | EA | 0 |
| 1005 | PRODUCTION TOOL BREECH LOCK | TOOL BREECH LOCK | 1005-01-629-5685 | 13027998-6 | EH5C0315EH | 164 | EA | 0 |
| 1006 | PRODUCTION TOOL BREECH LOCK | TOOL BREECH LOCK | 1005-01-629-6801 | 13027998-4 | EH5C0316EH | 139 | EA | 0 |
| 1007 | PRODUCTION TOOL BREECH LOCK | TOOL BREECH LOCK | 1005-01-629-5688 | 13027998-5 | EH5C0334EH | 186 | EA | 0 |
| 1008 | PRODUCTION TOOL BREECH LOCK | TOOL BREECH LOCK | 1005-01-629-5684 | 130227998 | EH5C0335EH | 171 | EA | 0 |
| 1009 | PRODUCTION TOOL BREECH LOCK | TOOL BREECH LOCK | 1005-01-629-7417 | 13027998-3 | EH5C0794EH | 125 | EA | 0 |
| 1010 | PRODUCTION TOOL BREECH LOCK | TOOL BREECH LOCK | 1005-01-629-6783 | 13027998-7 | EH5C0274EH | 186 | EA | 0 |
| 2001 | *OPTION PRODUCTION CAM, BREECH LOCK, MAC | CAM, BREECH LOCK, MAC | 1005-01-629-5635 | 13027998-2 | EH5C0345EH | 143 | EA | 0 |
| 2002 | *OPTION PRODUCTION LOCK BREECH, MACHINE | LOCK BREECH, MACHINE | 1005-01-536-5640 | 13028643 | EH6C0336EH | 216 | EA | 0 |
| 2003 | *OPTION PRODUCTION LOCK BREECH, MACHINE | LOCK BREECH, MACHINE | 1005-01-536-5643 | 13028639 | EH6C0337EH | 477 | EA | 0 |
| 2004 | *OPTION PRODUCTION TOOL BREECH LOCK | TOOL BREECH LOCK | 1005-01-629-6807 | 13027998-8 | EH5C0314EH | 187 | EA | 0 |
| 2005 | *OPTION PRODUCTION TOOL BREECH LOCK | TOOL BREECH LOCK | 1005-01-629-5685 | 13027998-6 | EH5C0315EH | 164 | EA | 0 |
| 2006 | *OPTION PRODUCTION TOOL BREECH LOCK | TOOL BREECH LOCK | 1005-01-629-6801 | 13027998-4 | EH5C0316EH | 139 | EA | 0 |
| 2007 | *OPTION PRODUCTION TOOL BREECH LOCK | TOOL BREECH LOCK | 1005-01-629-5688 | 13027998-5 | EH5C0334EH | 186 | EA | 0 |
| 2008 | *OPTION PRODUCTION TOOL BREECH LOCK | TOOL BREECH LOCK | 1005-01-629-5684 | 130227998 | EH5C0335EH | 171 | EA | 0 |
| 2009 | *OPTION PRODUCTION TOOL BREECH LOCK | TOOL BREECH LOCK | 1005-01-629-7417 | 13027998-3 | EH5C0794EH | 125 | EA | 0 |
| 2010 | *OPTION PRODUCTION TOOL BREECH LOCK | TOOL BREECH LOCK | 1005-01-629-6783 | 13027998-7 | EH5C0274EH | 186 | EA | 0 |
| A001 | Data Requirement | Engineering Change Proposal (ECP) | See Attachment - CDRLs | 0 | Not separately Priced (NSP) |
| A002 | Data Requirement | Requests For Variance (RFV) | See Attachment - CDRLs | 0 | Not separately Priced (NSP) |
| A003 | Data Requirement | Notice Of Revision (NOR) | See Attachment - CDRLs | 0 | Not separately Priced (NSP) |
| A004 | Data Requirement | Acceptance Inspection Equipment (AIE) Report | See Attachment - CDRLs | Not separately Priced (NSP) | |
| A005 | Data Requirement | Test Procedure - Heavy Phosphate Coating | See Attachment - CDRLs | Not separately Priced (NSP). Only Applicable for NSNs: 1005-01-536-5640, 1005-01-536-5643. | |
| PROPOSAL SUBMISSION INSTRUCTIONS | Proposal Content: |
Submission shall consist of a completed and signed Pricing Sheet contained in this RFOP. No separate technical proposal is required. The Government intends to evaluate proposals and award an order without discussions.
| Submission Method: | Proposals must be submitted electronically via email to the Point of Contact by the Response Due Date. The subject line must read: "Proposal for RFOP-PANDTA-25-P-0000 027548- [Your Company Name]". Late proposals will not be evaluated. |
| Period of Acceptance | Proposals shall remain firm for at least 60 calendar days from the closing date of this RFOP. |
| Mandatory Eligibility Requirement For Award: | To be considered eligible for award, a vendor must have a fully executed BOAST Basic Ordering Agreement in place prior to the closing date and time specified in this RFOP. Proposals received from vendors who do not have an executed BOA by the closing time will be considered ineligible and will not be evaluated. |
EVALUATION FOR AWARD Price Only The Government intends to award a Firm-Fixed-Price Order to the responsible BOA holder who submits the lowest-priced proposal. Price will be evaluated for reasonableness. Award will be made to the offeror with the lowest evaluated price.
Evaluation: Price will be evaluated for reasonableness. Award will be made to the offeror with the lowest evaluated price.
In accordance with FAR Subpart 9.1, the Government will make a determination of contractor responsibility for the apparent successful awardee prior to placing the order.
NAME: DATE:
mailto:BOAST@army.mil Applicable Clauses-Provisions
| Applicable Clauses/Provisions | ||||
| Reference | Date | Title | BOA Reference | Remarks |
| 52.246-2 | 8/1/96 | INSPECTION OF SUPPLIES--FIXED-PRICE | BOA Attachment 0003 - FAR 15 | |
| 52.246-16 | 4/1/84 | RESPONSIBILITY FOR SUPPLIES | BOA Attachment 0003 - FAR 15 | |
| 252.211-7008 | 9/1/10 | USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS | ||
| 252.211-7003 | 1/1/23 | ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 52.242-15 | 8/1/89 | STOP-WORK ORDER | BOA Attachment 0003 - FAR 15 | |
| 52.242-17 | 4/1/84 | GOVERNMENT DELAY OF WORK | BOA Attachment 0003 - FAR 15 | |
| 52.247-34 | 2/1/06 | F.O.B. DESTINATION (JAN 1991) | ||
| 52.247-48 | 2/1/99 | F.O.B. DESTINATION--EVIDENCE OF SHIPMENT | ||
| 252.232-7006 | 1/1/23 | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.209-7004 | 5/1/19 | SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY E GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (MAY 2019) | BOA Attachment 0003 - FAR 15 | |
| 252.225-7001 | 2/1/24 | BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC (FEB 2024) | BOA Attachment 0003 - FAR 15 | |
| 252.225-7012 | 4/1/22 | PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES | BOA Attachment 0003 - FAR 15 | |
| 252.225-7016 | 1/1/23 | RESTRICTION ON ACQUISITION OF BALL AND ROLLER BEARINGS (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.226-7001 | 1/1/23 | UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.227-7013 | 8/1/25 | RIGHTS IN TECHNICAL DATA--OTHER THAN COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (AUG 2025) | ||
| 252.227-7015 | 1/1/25 | TECHNICAL DATA--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025) | ||
| 252.227-7016 | 1/1/23 | RIGHTS IN BID OR PROPOSAL INFORMATION (JAN 2023) | ||
| 252.227-7025 | 1/1/25 | LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED INFORMATION MARKED WITH RESTRICTIVE LEGENDS (JAN 2025) | ||
| 252.227-7027 | 4/1/88 | DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE | ||
| 252.227-7030 | 3/1/00 | TECHNICAL DATA--WITHHOLDING OF PAYMENT | ||
| 252.227-7037 | 1/1/25 | VALIDATION OF ASSERTED RESTRICTIONS ON TECHNICAL DATA (JAN 2025) | ||
| 252.232-7003 | 12/1/18 | ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS | BOA Attachment 0003 - FAR 15 | |
| 252.243-7001 | 12/1/91 | PRICING OF CONTRACT MODIFICATIONS | BOA Attachment 0003 - FAR 15 | |
| 252.243-7002 | 12/1/22 | REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2022) | BOA Attachment 0003 - FAR 15 | |
| 252.244-7000 | 11/1/23 | SUBCONTRACTS FOR COMMERCIAL PRODUCTS OR COMMERCIAL SERVICES (NOV 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.247-7023 | 10/1/24 | TRANSPORTATION OF SUPPLIES BY SEA--BASIC (OCT 2024) | BOA Attachment 0003 - FAR 15 | |
| 252.203-7001 | 1/1/23 | PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.204-7000 | 10/1/16 | DISCLOSURE OF INFORMATION | BOA Attachment 0003 - FAR 15 | |
| 252.204-7003 | 4/1/92 | CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT | BOA Attachment 0003 - FAR 15 | |
| 252.231-7000 | 12/1/91 | SUPPLEMENTAL COST PRINCIPLES | BOA Attachment 0003 - FAR 15 | |
| 252.232-7010 | 12/1/06 | LEVIES ON CONTRACT PAYMENTS | BOA Attachment 0003 - FAR 15 | |
| 252.203-7000 | 9/1/11 | REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS | BOA Attachment 0003 - FAR 15 | |
| 252.203-7002 | 12/1/22 | REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022) | BOA Attachment 0003 - FAR 15 | |
| 252.225-7048 | 6/1/13 | EXPORT-CONTROLLED ITEMS | BOA Attachment 0003 - FAR 15 | |
| 252.204-7015 | 1/1/23 | NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.204-7012 | 5/1/24 | SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (MAY 2024) (DEVIATION 2024-O0013, REVISION 1) | BOA Attachment 0003 - FAR 15 | |
| 252.222-7006 | 1/1/23 | RESTRICTIONS ON THE USE OF MANDATORY ARBITRATION AGREEMENTS (JAN 2023) | ||
| 252.204-7018 | 1/1/23 | PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.204-7020 | 11/1/23 | NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.225-7056 | 1/1/23 | PROHIBITION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.240-7997 | 2/1/26 | NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (DEVIATION 2026-O0025)(FEB 2026) | ||
| 252.227-7989 | 2/1/26 | RIGHTS IN TECHNICAL DATA, COMPUTER SOFTWARE, AND COMPUTER SOFTWARE DOCUMENTATION?OTHER THAN COMMERCIAL PRODUCTS ORCOMMERCIAL SERVICES (DEVIATION 2026-O0036) (FEB 2026) | ||
| 252.227-7991 | 2/1/26 | RIGHTS IN BID OR PROPOSAL INFORMATION ((DEVIATION 2026-O0036) | ||
| (FEB 2026) | ||||
| 252.227-7995 | 2/1/26 | DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE (DEVIATION 2026-O0036) (FEB 2026) | ||
| 252.227-7996 | 2/1/26 | TECHNICAL DATA-WITHHOLDING OF PAYMENT (DEVIATION 2026-O0036) (FEB 2026) | ||
| 252.240-7997 CD | 2/1/26 | NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (DEVIATION 2026-O0025)(FEB 2026) | ||
| (DEVIATION 2026-O0025)(FEB 2026) | ||||
| 52.203-3 | 4/1/84 | GRATUITIES | BOA Attachment 0003 - FAR 15 | |
| 52.203-5 | 5/1/14 | COVENANT AGAINST CONTINGENT FEES | BOA Attachment 0003 - FAR 15 | |
| 52.203-6 | 11/1/21 | RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020) | BOA Attachment 0003 - FAR 15 | |
| 52.203-7 | 6/1/20 | ANTI-KICKBACK PROCEDURES | BOA Attachment 0003 - FAR 15 | |
| 52.203-8 | 5/1/14 | CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY | BOA Attachment 0003 - FAR 15 | |
| 52.203-10 | 5/1/14 | PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY | BOA Attachment 0003 - FAR 15 | |
| 52.203-12 | 6/1/20 | LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS | BOA Attachment 0003 - FAR 15 | |
| 52.209-6 | 2/1/26 | PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR VOLUNTARILY EXCLUDED (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.211-5 | 2/1/26 | MATERIAL REQUIREMENTS (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.211-15 | 4/1/08 | DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS | BOA Attachment 0003 - FAR 15 | |
| 52.215-2 | 2/1/26 | AUDIT AND RECORDS--NEGOTIATION (FEB 2026) | ||
| 52.215-14 | 11/1/21 | INTEGRITY OF UNIT PRICES | BOA Attachment 0003 - FAR 15 | |
| 52.222-1 | 2/1/97 | NOTICE TO THE GOVERNMENT OF LABOR DISPUTES | BOA Attachment 0003 - FAR 15 | |
| 52.222-20 | 2/1/26 | CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.222-37 | 2/1/26 | EMPLOYMENT REPORTS ON VETERANS (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.222-50 | 2/1/26 | COMBATING TRAFFICKING IN PERSONS ((FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.227-1 | 6/1/20 | AUTHORIZATION AND CONSENT | BOA Attachment 0003 - FAR 15 | |
| 52.227-2 | 6/1/20 | NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT | BOA Attachment 0003 - FAR 15 | |
| 52.229-3 | 2/1/13 | FEDERAL, STATE, AND LOCAL TAXES | BOA Attachment 0003 - FAR 15 | |
| 52.232-1 | 4/1/84 | PAYMENTS | ||
| 52.232-8 | 2/1/02 | DISCOUNTS FOR PROMPT PAYMENT | BOA Attachment 0003 - FAR 15 | |
| 52.232-11 | 4/1/84 | EXTRAS | BOA Attachment 0003 - FAR 15 | |
| 52.232-17 | 5/1/14 | INTEREST | BOA Attachment 0003 - FAR 15 | |
| 52.232-23 ALT 1 | 4/1/84 | ASSIGNMENT OF CLAIMS (MAY 2014) -- ALTERNATE I (APR 1984) | ||
| 52.232-25 | 1/1/17 | PROMPT PAYMENT | BOA Attachment 0003 - FAR 15 | |
| 52.232-33 | 10/1/18 | PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT | BOA Attachment 0003 - FAR 15 | |
| 52.233-1 | 2/1/26 | DISPUTES (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.233-3 | 2/1/26 | PROTEST AFTER AWARD (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.233-4 | 2/1/26 | APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.242-13 | 7/1/95 | BANKRUPTCY | BOA Attachment 0003 - FAR 15 | |
| 52.243-1 | 2/1/26 | CHANGES--FIXED PRICE | BOA Attachment 0003 - FAR 15 | |
| 52.244-6 | 2/1/26 | SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION 2025-O0003) | BOA Attachment 0003 - FAR 15 | |
| 52.247-63 | 1/1/25 | PREFERENCE FOR U.S.-FLAG AIR CARRIERS (JAN 2025) | BOA Attachment 0003 - FAR 15 | |
| 52.247-68 | 2/1/06 | REPORT OF SHIPMENT (REPSHIP) | BOA Attachment 0003 - FAR 15 | |
| 52.248-1 | 6/1/20 | VALUE ENGINEERING | BOA Attachment 0003 - FAR 15 | |
| 52.249-2 | 4/1/12 | TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) | BOA Attachment 0003 - FAR 15 | |
| 52.249-8 | 4/1/84 | DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) | BOA Attachment 0003 - FAR 15 | |
| 52.202-1 | 6/1/20 | DEFINITIONS | BOA Attachment 0003 - FAR 15 | |
| 52.204-10 | 2/1/26 | REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.222-54 | 2/1/26 | EMPLOYMENT ELIGIBILITY VERIFICATION (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.226-8 | 5/1/24 | ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2024) | BOA Attachment 0003 - FAR 15 | |
| 52.222-40 | 12/1/10 | NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT | BOA Attachment 0003 - FAR 15 | |
| 52.219-8 | 2/1/26 | UTILIZATION OF SMALL BUSINESS CONCERNS (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.209-9 | 2/1/26 | UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.204-13 | 2/1/26 | SYSTEM FOR AWARD MANAGEMENT-MAINTENANCE (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.232-39 | 6/1/13 | UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS | BOA Attachment 0003 - FAR 15 | |
| 52.232-40 | 3/1/23 | PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS(MAR 2023) | BOA Attachment 0003 - FAR 15 | |
| 52.203-19 | 1/1/17 | PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS | BOA Attachment 0003 - FAR 15 | |
| 52.240-91 | 2/1/26 | SECURITY PROHIBITIONS AND EXCLUSIONS (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.204-91 | 2/1/26 | CONTRACTOR IDENTIFICATION (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.222-90 | 4/1/26 | ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS | ||
| 52.252-2 | 2/1/98 | CLAUSES INCORPORATED BY REFERENCE (Feb 1998) | BOA Attachment 0003 - FAR 15 | |
| 52.252-6 | 11/1/20 | AUTHORIZED DEVIATIONS IN CLAUSES (Nov 2020) | BOA Attachment 0003 - FAR 15 | |
| 52.219-28 | 2/1/26 | POSTAWARD SMALL BUSINESS PROGRAM REPRESENTATION (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.222-35 | 2/1/26 | EQUAL OPPORTUNITY FOR VETERANS (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.222-36 | 2/1/26 | EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.204-19 | 12/1/14 | INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS | BOA Attachment 0003 - FAR 15 | |
| 52.222-19 | 2/1/26 | CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES (FEB 2026) | ||
| 52.203-17 | 11/1/23 | CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV2023) | ||
| 52.240-93 | 2/1/26 | BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEM (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 252.227-7028 | 6/1/95 | TECHNICAL DATA OR COMPUTER SOFTWARE PREVIOUSLY DELIVERED TO THE GOVERNMENT | ||
| 252.203-7005 | 9/1/22 | REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (Sep 2022) | BOA Attachment 0003 - FAR 15 | |
| 252.204-7008 | 10/1/16 | COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS | BOA Attachment 0003 - FAR 15 | |
| 252.225-7053 | 8/1/21 | REPRESENTATION REGARDING PROHIBITION ON USE OF CERTAIN ENERGY SOURCED FROM INSIDE THE RUSSIAN FEDERATION | ||
| 252.204-7007 | 10/1/25 | ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025) | BOA Attachment 0003 - FAR 15 | |
| 252.204-7017 | 5/1/21 | PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION | ||
| 252.225-7973 | 8/1/24 | PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT SYSTEMS--REPRESENTATION (DEVIATION 2024-O0014) | ||
| 252.239-7098 | 4/1/21 | PROHIBITION ON CONTRACTING TO MAINTAIN OR ESTABLISH A COMPUTER NETWORK UNLESS SUCH NETWORK IS DESIGNED TO BLOCK ACCESS TO CERTAIN WEBSITES--REPRESENTATION (DEVIATION 2021-O0003) | ||
| 52.240-90 | 2/1/26 | SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS | ||
| 52.225-18 | 8/1/18 | PLACE OF MANUFACTURE | BOA Attachment 0003 - FAR 15 | |
| 52.209-13 | 2/1/26 | VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS--CERTIFICATION | BOA Attachment 0003 - FAR 15 | |
| 252.215-7008 | 12/1/22 | ONLY ONE OFFER (DEC 2022) | BOA Attachment 0003 - FAR 15 | |
| 252.215-7013 | 1/1/23 | SUPPLIES AND SERVICES PROVIDED BY NONTRADITIONAL DEFENSE CONTRACTORS (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.204-7019 | 11/1/23 | NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS | BOA Attachment 0003 - FAR 15 | |
| 252.270-7000 | 11/1/24 | Pilot Program To Incentivize Contracting With Employee-Owned Businesses?Representation (Nov 2024) | BOA Attachment 0003 - FAR 15 | |
| 252.270-7001 | 11/1/24 | Pilot Program To Incentivize Contracting With Employee-Owned Businesses?Subcontracting Certification (Nov 2024) | BOA Attachment 0003 - FAR 15 | |
| 252.215-7992 | 3/1/26 | ONLY ONE OFFER (DEVIATION 2026-O0048) (MAR 2026) | ||
| 52.214-34 | 4/1/91 | SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE | BOA Attachment 0003 - FAR 15 | |
| 52.214-35 | 4/1/91 | SUBMISSIONS OF OFFERS IN U.S. CURRENCY | BOA Attachment 0003 - FAR 15 | |
| 52.215-1 | 2/1/26 | INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.215-16 | 6/1/03 | FACILITIES CAPITAL COST OF MONEY | BOA Attachment 0003 - FAR 15 | |
| 52.204-7 | 2/1/26 | SYSTEM FOR AWARD MANAGEMENT-REGISTRATION (FEB2026) | BOA Attachment 0003 - FAR 15 | |
| 52.233-2 | 2/1/26 | SERVICE OF PROTEST (FEB2026) | BOA Attachment 0003 - FAR 15 | |
| 52.211-14 | 4/1/08 | NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE | BOA Attachment 0003 - FAR 15 | |
| 52.252-1 | 2/1/98 | SOLICITATION PROVISIONS INCORPORATED BY REFERENCE | BOA Attachment 0003 - FAR 15 | |
| 52.252-5 | 11/1/20 | AUTHORIZED DEVIATIONS IN PROVISIONS | BOA Attachment 0003 - FAR 15 | |
| 52.217-7 | 3/1/89 | OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM | ||
| 52.246-11 | 12-01-2014 | HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT | ISO 90001:2015 (21 Oct 2015) Tailored by excluding paragraphs(s) 8.3 | |
| 52.209-3 ALT 1 and 2 | 09-01-1989 | FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (SEP 1989) -- ALTERNATE I (JAN 1997) AND ALTERNATE II (SEP 1989) | The contractor shall test 5 unit(s) of Lot/Item, BREECH LOCK(s), specified in this contract. At least 15 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing of the time and |
location of the testing so that the Government may witness the tests. The Contractor shall submit the first article test report within TBD by PCO calendar days from the date of this contract to (add address): Send electronic FATR to: The Contracting Officer and to FDCC ORG EMAIL as follows: usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil. Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. Estimated FAT completion 120 days.
| 252.225-7008 | 3/1/13 | RESTRICTION ON ACQUISITION OF SPECIALTY METALS |
| 252.225-7009 | 1/1/23 | RESTRICTION ON ACQUISITION OF CERTAIN ARTICLES CONTAINING SPECIALTY METALS |
| 252.225-7010 | 7/1/09 | COMMERCIAL DERIVATIVE MILITARY ARTICLE-SPECIALTY METALS COMPLIANCE CERTIFICATE |
Technical &Quality Requirements
| TECHNICAL & QUALITY REQUIREMENTS | ||
| Title | Instructions/Narrative | |
| DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE | ||
| (a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801–4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provision of DoD Directive 5230.25 and DoD Instruction 2040.02. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level. |
(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, “Militarily Critical Technical Data Agreement” certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at: http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's Section C “Technical Data Package” instructions.
(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
CONFIGURATION MANAGEMENT DOCUMENTATION
The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
a. The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).
b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.
d. All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
e. For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.
(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A00X.
(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A00X.
(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A00X.
f. The Government’s acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government’s sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).
h. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.
| OPSEC TRAINING REQUIREMENT | ||
| Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at: https://securityawareness.dcsa.mil/opsec/index.htm. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officer’s Representative (COR), if assigned to the contract, or the Procuring Contracting Officer (PCO). | ||
| REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN | (a) The contractor is subject to, at a minimum, the provisions of the current TACOM OPSEC Plan, or other approved U.S. Government OPSEC plan, per AR 530-1, Operations Security. This Plan specifies the government’s critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. |
(b) The contractor will receive a copy of the Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by TACOM G3/G2 or individual organizations supporting AT/OPSEC Officers.
(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is OPSEC Level I.
Counterintelligence Awareness and Reporting (CIAR); formerly known as Threat Awareness Reporting Program (TARP) Per AR 381-12, all Department of the Army (DA) personnel (Military/Civilian/Contractor) must complete CIAR training within 30 days of assignment or employment to an organization/contract, and then once every 12 months thereafter pursuant to DoDD 5240.06. DA personnel will complete “Counterintelligence Awareness and Reporting for DoD Employees” – CI116.16, located at https://www.cdse.edu/, to satisfy most Army annual training requirements.
In addition, per AR 381-12 Chapter 5, the following individual(s) must receive an in-person CIAR briefing directly from an ACI Special Agent or a CI-experienced person in addition to the annual training requirement:
• DA personnel scheduled to travel (official, unofficial, permanent change of station) to or through countries with a high foreign intelligence or terrorist threat level as identified by Defense Intelligence Agency or the Department of State, will receive a special CIAR briefing prior to the travel and will be debriefed upon return. AR 381–12 • 13 June 2025 11
• DA personnel who have security clearances travelling to foreign locations in any duty status must fulfill pre-and-post travel security briefing and debriefing requirements in accordance with the DoD Foreign Clearance Guide and DoDD 4500.54E.
• DA personnel deploying in support of military exercises or contingency operations will receive a special CIAR briefing prior to departure.
• DA personnel taking part in bilateral or multilateral engagements with foreign governments or international organizations will receive a CIAR briefing prior to the event.
• Foreign visitors, personnel, and personal connections. Commanders will coordinate with unit security managers to identify personnel potentially vulnerable to FIE exploitation and ensure they are referred to ACI to receive specialized CIAR briefing.
• Such personnel will receive foreign intelligence threat briefings prior to foreign travel or event.
• Personnel with access to Sensitive Compartmented Information and Special Access Programs.
• Personnel assigned to or supporting defense critical infrastructure or associated assets, pursuant to DoDD 3020.40 and DoDI 5240.19, will receive an in-person special CIAR briefing on an annual basis. Such personnel will notify their local ACI office of all projected foreign travel or foreign visits.
• Foreign government employment. Current and retired DA personnel seeking employment with foreign government entities will have CIAR training and support made available.
• Information technology professionals System administrators, privileged users, and those with privileged access that provides an individual capability to alter the properties, behavior, or control of a DoD information system will receive in-person special CIAR briefings on an annual basis.
• Professional and educational exchange programs with foreign governments.
These briefings will be tailored to the particular risk or threat involved, including methods the person may use to minimize the risk, and will place special emphasis on reporting responsibilities. Debriefings will be conducted as soon as feasible following completion of travel, duty, or visit to a foreign country, or attendance at a conference with foreign personnel by an ACI Special Agent. Failure to receive training does not relieve individuals from their reporting responsibilities in chapter 4 of this regulation.
| Engineering Exceptions | Please note that there are Engineering Exemptions applicable to this procurement. The exemptions can be found with the TDP in SAM.gov and will require the same access procedures as access to the TDP. |
| INSPECTION AND ACCEPTANCE POINTS: ORIGIN | The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance. |
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip) First Article Test (Contractor Testing) a. The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
b. The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
c. The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.
(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
d. Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
e. A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to USARMY RIA CCDC AC Mailbox RDAR-QEP: usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil.
f. Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the Government shall be borne by the Contractor.
| Military Packaging Requirements- Supplemental Instructions | Please note that there are Engineering Exemptions applicable to this procurement. The exemptions can be found with the TDP in SAM.gov and will require the same access procedures as access to the TDP. |
| Heavy Phosphate Coating Requirement | The following requirements regarding heavy phosphate coatings are applicable to this solicitation and any resultant contract in addition to those requirements set forth in specification MIL-DTL-16232. |
a. Paragraph 3.1 of MIL-DTL-16232 refers to "Preproduction Inspection." The procedure shall be submitted in accordance with the Contract Data Requirements List (CDRL) contained in the contract. The contract number must be cited on all phosphate coating procedures submitted for review and approval. Procedures shall include product name and manufacturer of all chemicals/materials to be used. All processes, equipment, controls along with testing and test frequencies used for phosphating including application of supplemental finishes shall be described in detail.
b. Paragraph 3.2.5-c of MIL-DTL-16232 refers to the "Chromic acid rinse, (Classes 1, 2 and 3)." The final rinse shall be checked by a standard free and total acid titration along with a pH reading "prior to starting production and at least every 8 hours thereafter."
c. Paragraph 4.7.3 of MIL-DTL-16232 refers to "Weight per unit area of phosphate coatings." The frequency for testing coating weight is "per lot, at least every 8 hours."
d. Paragraph 4.7.5 of MIL-DTL-16232 refers to "Accelerated corrosion resistance." Accelerated corrosion resistance shall be determined in accordance with 4.7.5.1. The frequency for testing accelerated corrosion resistance per ASTM B117 is "per lot, at least every 8 hours."
e. The "product name" along with the manufacturer of the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure and shall be traceable to the applicable Qualified Products List (QPL) or Qualified Products Database (QPD) at Assist Online. QPD products may be obtained at the quick search site, type the specification number (i.e., 3150) in the second block and click the "Submit" button. Then click on the specification (i.e., MIL-PRF-3150). In the next screen, click on the word "Qualification".
To obtain MIL Specs, MIL Standards, QPL and QPD products see <https://assist.dla.mil/online/start />.
To obtain MIL Specs, MIL Standards, QPD products see <https://assist.dla.mil/online/start/>.
f. A thickness range for the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure along with a frequency for testing. A daily frequency is required.
g. Heat cured dry film lubricant shall be air dried for 1.0 hour (until dry to touch) after dipping/spraying or flash dried at 155-175 degrees F for 10-30 minutes and then heat cured at a temperature of 375-425 degrees F for 55-65 minutes per paragraph 4.4.2.2 of MIL-PRF-46010.
h. Air cure dry film lubricant shall be air dried at room temperature for 24 hours minimum.
i. Adhesion testing shall be stated in the procedure for a supplemental coating of dry film lubricant per ASTM D2510 or CARC paint per ASTM D3359, method B along with the frequency for testing. A daily frequency is required.
j. Salt spray testing of parts with phosphate and supplemental dry film lubricant per ASTM B117 for 100 hours shall be stated in the procedure along with the frequency for testing. The frequency for testing is "per lot or weekly." Parts shall show no more than 3 rust spots per 3" x 6" area with none larger than 1.0mm in diameter. Salt spray testing of parts with phosphate and primer per ASTM B117 for 336 hours shall be included in the procedure for supplemental coatings of CARC paint along with a frequency for testing. The frequency for salt spray testing is "per lot or monthly." Parts shall show no visible rust exceeding rust grade no. 9 per ASTM D610, no more than 5 blisters per 4" x 6" area with none larger than 3/64 inch in diameter. Under film attack at the scribe shall not exceed 1/8 inch.
k. Topcoat color shall be visual/equipment checked against the specified chip no. of SAE AMS-STD-595 per paint batch. The procedure shall include the specified color chip number.
l. Cure of the paint shall be checked daily by solvent wipe per paragraph 4.2.3.2 of MIL-DTL-53072. The manufacturer of the MEK solvent shall be stated in the procedure.
REWORK AND REPAIR OF NONCONFORMING MATERIAL (a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Representative for review and approval prior to implementation. Rework procedures are subject to the Government’s disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting Officer for review and written Government approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review and approval, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The Government approved rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
ACCEPTANCE INSPECTION EQUIPMENT (AIE) (a) The contractor shall use a calibration system with traceability to a national or international standard for the AIE used on this contract.
(b) The contractor shall provide all AIE (except for any AIE listed as available in Section H or Appendix I) necessary to assure conformance of material to the contract requirements.
(c) AIE shall be available for use on the First Article (FA) submission, if FA is required, or prior to use for acceptance of production material on this contract.
(d) Contractor furnished AIE shall be made (i) to the AIE designs specified in Section C, or (ii) to any other design provided the contractor's proposed AIE design is approved by the Government. Contractor's proposed AIE design for inspection of characteristics listed as "Critical, Special or Major" shall be submitted to the Government for review and approval as directed on the Contract Data Requirements List, DD Form 1423. Government approval of AIE design shall not be considered to modify the contract requirements.
(e) When the contractor submits its proposed AIE on commercial off the shelf equipment, the contractor shall include the manufacturer's name and model number, and sufficient information to show capability of the proposed AIE to perform the inspection required. When submitting proposed AIE design documentation on commercial computer controlled test and measuring equipment include information on (1) test program listing (2) flowcharts showing accept and reject limits and computer generated test stimuli (3) calibration program listing (4) sample of the printout of an actual test and calibration (5) test plan to verify accuracy of inspection and correctness of accept or reject decision (6) identification of the equipment by model name and number.
(f) Resubmission of the contractor's proposed AIE design for Government approval on a follow on Government contract is not required, provided the inspection characteristic parameters specified in the technical data package and the previously Government approved AIE designs have not changed. In this situation, the contractor shall provide written correspondence in the place of the AIE designs that indicates the prior Government approval and states that no changes have occurred.
(g) The Government reserves the right to disapprove, at any time during the performance of this contract, any AIE that is not accomplishing its intended use in verifying an inspection or test characteristic.
(h) If the contractor changes the design after the initial approval, the modified design must be submitted for approval prior to use.
USE OF MIL-STD 1916 (a) The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The Verification Level (VL) shall be VL -1- for major characteristics and VL -2- for minor characteristics.
(b) MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.
image1.emf
File details come from the government source that posted it. Updated .