Brand Name Justification 39th Trailer redacted.pdf

PDF 178 KB Posted

Attached to
Tactical Trailer Systems
Solicitation number
PANNGB-26-P-0000-041162
Issued by

About this file

This is a Justification for Other Than Full and Open Competition (JOFOC) for a brand-name restricted procurement by the Arkansas Army National Guard.

The requiring activity is the 39th Infantry Brigade Combat Team (IBCT) under the Arkansas Army National Guard, with the contracting activity being the Arkansas United States Property and Fiscal Officer (AR USPFO). The procurement seeks to acquire five (5) Weatherhaven Tactical Redeployable Expanding Container Capability – Trailer (TRECC-T) units, specifically configured as part number TRECC-T-LTT, as a new firm-fixed-price contract action. The government requires these tactical shelter systems complete with integrated tactical trailer mobility packages, environmental control units (ECUs), and auxiliary power distribution. Delivery must occur within 180 days after receipt of order. The estimated total value is redacted, and funding comes from Operations & Maintenance (O&M) and Procurement, Defense-Wide accounts.

The justification cites 10 U.S.C. 3204(a)(1), implemented by FAR 6.103-1(b), authorizing procurement without full and open competition based on only one responsible source being available. Three critical operational requirements justify the brand-name restriction: (1) Weatherhaven's patented closed-core deployment architecture that keeps mission-critical IT equipment sealed during transit and deployment, protecting sensitive electronics from environmental hazards; (2) sub-5-minute two-person tool-free setup capability essential for rapid tactical displacement and survivability in contested environments; and (3) a critical weight-to-volume ratio of approximately 2,000 lbs tare weight that allows 2,500–3,000 lbs mission payload capacity while fitting NATO standard light tactical trailers without exceeding the 4,200 lb gross vehicle weight rating. Market research conducted in September 2026 determined no competing manufacturers produce the mandatory combination of these three capabilities. Price reasonableness will be established through comparison against an independent government cost estimate, GSA Schedule pricing for analogous systems, and competition among authorized defense distributors carrying the Weatherhaven product line. The document is dated 9/16/2026 with certifications from technical personnel, the contracting officer, and the chief of the contracting office.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Brand Name Justification

Justification for Other Than Full and Open Competition (JOFOC) — Brand Name Justification drafted in accordance with FAR 6. FAR 1

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION (JOFOC)

BRAND NAME JUSTIFICATION

Pursuant to 10 U.S.C. 3204(a)(1) as implemented by FAR 6. -1( ) — Brand Name Descriptions

1.0 IDENTIFICATION OF THE AGENCY AND CONTRACTING ACTIVITY

Requiring Activity: Arkansas Army National Guard (AR ARNG) / 39th Infantry Brigade Combat Team (IBCT) Contracting Activity: AR ARNG / Arkansas United States Property and Fiscal Officer

(AR USPFO)

Document Identifier: PANNGB-26-P-0000 041162

2.0 NATURE AND/OR DESCRIPTION OF THE ACTION BEING APPROVED

This action is a new Firm-Fixed-Price (FFP) contract action for the acquisition of commercial off-the-shelf (COTS) Weatherhaven Tactical Redeployable Expanding Container Capability – Trailer (TRECC-T) units (or specific configured part number: TRECC-T-LTT). Contracting on a brand-name-restricted basis is necessary to satisfy the Government’s minimum operational, survivability, and rapid-deployment requirements.

3.0 DESCRIPTION OF THE SUPPLIES OR SERVICES REQUIRED

The Government requires five (5) each Weatherhaven TRECC-T tactical shelter system(s), including integrated tactical trailer mobility packages, environmental control units (ECUs), and auxiliary power distribution.

Estimated Total Value:

Period of Performance / Delivery: Within 180 Days After Receipt of Order (ARO) Funding Type: Operations & Maintenance (O&M) / Procurement, Defense-Wide

4.0 STATUTORY AUTHORITY PERMITTING OTHER THAN FULL AND OPEN

COMPETITION

Statutory Authority: 10 U.S.C. 3204(a)(1) (formerly 10 U.S.C. 2304(c)(1)), implemented by F — "Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements — Brand Name Descriptions."

5.0 DEMONSTRATION THAT THE PROPOSED CONTRACTOR'S UNIQUE

QUALIFICATIONS OR NATURE OF THE ACQUISITION REQUIRES USE OF THE

AUTHORITY CITED

Market research indicates that only the Weatherhaven TRECC-T possesses the unique engineering architecture, patented mechanisms, and physical form factors required to satisfy the operational mission profile. Specifically:

A. Patented "Closed-Core" Deployment Architecture (US & International Patents)

Operational Need: Forward tactical headquarters, drone control nodes, and radar ground teams operate in heavily contested environments subject to sudden severe weather (sandstorms, driving rain, freezing temperatures) and loitering munition threats. Mission systems, high-value tactical display screens, pre-wired 19-inch C4ISR server stacks, and fiber backbones must be permanently mounted, powered, and ready for immediate operation.

Weatherhaven Uniqueness: Weatherhaven possesses patented mechanical linkages and shelter designs wherein all mission-critical IT equipment remains permanently sealed inside the rigid center core during transit, expansion, and teardown.

Impact of Alternatives: Competing commercial systems either:

1. Require operators to manually unpack and mount monitors and racks after structural expansion, adding 15–30 minutes of setup time; or

2. Utilize slide-out walls that expose the inner cabin and delicate electronics to the external elements during deployment, risking catastrophic equipment failure in driving sand or rain.

B. Sub-5-Minute Two-Person Tool-Free Setup Threshold Operational Need: In dynamic, peer-adversary operational environments, "shoot-and-scoot" and rapid command post displacement are critical for survivability. The tactical unit must establish a fully climate-controlled, sealed C2 node within 3 to 5 minutes of trailer halt with only two (2) personnel, and collapse in an equal timeframe.

Weatherhaven Uniqueness: The TRECC-T features an assisted gull-wing release mechanism requiring zero tools, jacks, or specialized ground preparation. In operational testing, two operators consistently achieve complete operational readiness in under 180 seconds.

Impact of Alternatives: Alternate shelter offerings require leveling outriggers, manual frame hoisting, or multi-man sliding panels that demand 10 to 25 minutes of erection time and four (4) or more personnel, directly degrading tactical displacement timelines.

C. Critical Weight-to-Volume Ratio for Light Tactical Trailers Operational Need: The system must integrate directly onto existing light tactical utility trailers (NATO standard LTT-HC or US M1101/M1102) without exceeding the 4,200 lb Gross Vehicle Weight Rating (GVWR) of the trailer, while still providing at least 80 sq.

ft. of usable floor space.

Weatherhaven Uniqueness: Weatherhaven utilizes a hybrid architecture combining an aerospace-grade aluminum/composite central chassis with multi-layer, thermally insulated fabric wings. This yields a dry tare weight of only ~2,000 lbs (907 kg) and allows a mission payload capacity of 2,500–3,000 lbs.

Impact of Alternatives: All-rigid expandable shelters (such as heavy composite or steel slide-outs) carry dry tare weights exceeding 3,000–3,500 lbs, consuming the trailer's allowable axle payload and leaving zero weight margin for mission servers, batteries, generators, or ballistic add-on armor.

6.0 EFFORTS TO OBTAIN COMPETITION & MARKET RESEARCH SUMMARY

Pursuant to FAR Part 10, the Government conducted extensive market research in September 2026, which included:

1. Reviewing military expandable shelter catalogs.

2. Reviewing GSA Advantage, DLA Tailored Logistics Support (TLS) catalogs, and historical DoD contract awards.

While other manufacturers produce high-quality tactical mobile shelters, none manufacture an item that meets the mandatory combination of the closed-core environmental protection, sub-5-minute 2-man deployment, and the high payload-to-weight ratio of the Weatherhaven hybrid architecture. Procuring any other system would result in unacceptable delays in mission deployment timelines and compromise sensitive electronic payloads.

7.0 DETERMINATION OF FAIR AND REASONABLE COST

In accordance with FAR , the Contracting Officer will ensure that the final price paid by the Government is fair and reasonable. Price reasonableness will be established via:

1. Comparison against the Independent Government Cost Estimate

2. Comparison against published GSA Schedule catalog pricing and historical DLA contract awards for analogous shelter systems.

3. Competition among authorized prime defense distributors carrying the Weatherhaven product line.

8.0 ACTIONS TO OVERCOME COMPETITION BARRIERS FOR FUTURE

PROCUREMENTS

The requiring activity will continue to monitor the expeditionary infrastructure and tactical shelter market. As competitors advance lightweight composite materials, automated slide-out mechanics, and modular C2 integration, the Government will re-evaluate commercially available alternatives during future procurement cycles to determine if a competitive acquisition strategy can be executed.

File details come from the government source that posted it. Updated .