BPM006010_ATTACH_13_Pricing_Document.pdf

PDF 198 KB Posted

Attached to
Master Agreement AZ|CTR072296
Contract number
CTR072296
Issued by
Arizona

About this file

This document is a Request for Proposal (RFP) issued by the Arizona Department of Environmental Quality (ADEQ) for Solicitation No. BPM006010, specifically for ASRAC Assessment and Remediation of Hazardous Substances. The document includes Attachment 13, a Pricing Document submitted by CDM Smith as an offeror for the contract.

CDM Smith developed its pricing through a detailed process involving staff rate calculations, which includes a 2.763 multiplier for overhead costs, 4% escalation for two consecutive annual periods (April 1, 2024-March 31, 2026), and a 10.5% markup for profit. The total rate escalation amounts to 19.5%, with an anticipated profit percentage of 9.5%. The pricing is based on identifying potential staff for each project category, calculating their raw pay rates, and selecting representative billing rates rounded to the nearest dollar. The contract requires submission of both a Word document and Excel pricing sheet, with a mandatory one-dollar unit price entry in the Arizona Procurement Portal to ensure offer consideration. The pricing is comprehensive, covering all associated costs including labor rates, benefits, insurance, taxes, and administrative expenses.

View the file

Other files

File Type Posted
2025-01-01_CDMS_Smith_CTR072296_GAWPP.pdf PDF
ATTACHMENT_Experience___Capacity_Response_CDM_Smith.pdf PDF
BAFO - CDM Smith Attachment 1 Offer and Acceptance.pdf PDF
BAFO - CDM Smith Attachment 13 - Pricing Sheet.pdf PDF
BPM006010_ATTACH_03_Forced_Labor_of_Ethnic_Uyghurs_Ban.pdf PDF
BPM006010_ATTACH_04_Confidential_Information_Designation.pdf PDF
BPM006010_ATTACH_07_Letter_of_Insurability.pdf PDF
BPM006010_ATTACH_08_Organization_Profile.pdf PDF
BPM006010_ATTACH_10_Experience___Capacity_Response.pdf PDF
Clarification - CDM Smith Response.pdf PDF
BPM006010_ATTACH_01_Offer___Acceptance.pdf PDF
BPM006010_ATTACH_05_Conformance_Statements.pdf PDF
BPM006010_ATTACH_09_Proposed_Subcontractors.pdf PDF
BPM006010_ATTACH_11_References.pdf PDF
CTR072296_Amendment_1_-_Adds_Key_Personnel.pdf PDF
CTR072296_Amendment_6_-_Adds_Key_Personnel.pdf PDF
CTR072296_Amendment_7_-_Adds_Key_Personnel.pdf PDF
CTR072296_Amendment_8_-_Adds_Key_Personnel.pdf PDF
CTR072296_Amendment_10_-_Adds_Key_Personnel.pdf PDF
2026-01-01_CDM_Smith_CTR072296_GAWPP.pdf PDF
BAFO - CDM Smith Email Response.pdf PDF
BPM006010_ATTACH_06_Key_Personnel.pdf PDF
BPM006010_ATTACH_12_Method_of_Approach.pdf PDF
BPM006010_ATTACH_14_Offer_Checklist.pdf PDF
CTR072296_Amendment_2_-_Adds_Key_Personnel.pdf PDF
CTR072296_Amendment_5_-_Adds_Key_Personnel.pdf PDF
CTR072296_Pricing.pdf PDF
CTR072296_Amendment_3_-_Adds_Subcontractor.pdf PDF
CTR072296_Amendment_11_-_Adds_Subs_and_KP.pdf PDF
ATTACHMENT_Supplement_Insurance_CDM_Smith.pdf PDF
BPM006010 Award Letter - CDM Smith.pdf PDF
BPM006010 Solicitation Amendment 1.pdf PDF
BPM006010 Solicitation Requirements.pdf PDF
BPM006010_ATTACH_02_Boycott_of_Israel_Disclosure.pdf PDF
BPM006010_ATTACH_13_Pricing_Sheet.pdf PDF
CTR072296_Amendment_4_-_Adds_Key_Personnel.pdf PDF
CTR072296_Amendment_9-_Adds_Key_Personnel.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal

Solicitation No. BPM006010

ASRAC Assessment and Remediation of Hazardous Substances

Arizona Department of Environmental Quality (ADEQ)

1110 W. Washington Street Phoenix, AZ 85007

Solicitation Attachment 13 – Pricing Document | Revision No. 1 | Revised 04-23

Attachment 13 – Pricing Document

Offeror to complete ALL ITEMS in Attachment 13 - Pricing Document in its entirety. In addition, Offeror is to complete the Excel Pricing Sheet, which includes the hourly personnel classifications. Both Attachment 13 (this Word document) and Attachment 13 – Pricing Sheet (Excel document) must be completed and attached to the offer to be valid.

Failure to return a completed Word Attachment 13 - Pricing Document AND the Excel Attachment 13 – Pricing Sheet may result in the rejection of the offer.

Offeror shall complete the Line Item in the Items (F) tab in the Arizona Procurement Portal (APP) system by inputting one-dollar ($1.00) in the “Unit Price” field to ensure offer submission for the Offer to be considered.

Pricing shall be submitted on an all-inclusive basis and shall include all costs associated with performance of the Scope of Work, including without limitation, labor rate, labor benefits, payroll burden, insurance, Workman’s Compensation, fees, all taxes, profit, overhead (including repairs and maintenance if applicable), administrative costs, reporting and all other related cost factors for services offered in response to this solicitation. ADEQ will not reimburse any item other than the all-inclusive rates contained in the Pricing Schedule. The Pricing Schedule is not meant to indicate all costs related to additional services.

Indicate whether organization will offer a prompt payment discount, please complete one or more that will apply:

DISCOUNT WILL BE ____% IF ADEQ PAYMENT ISSUANCE DATE TO CONTRACTOR IS WITHIN SEVEN (7) CALENDAR DAYS FROM

ADEQ’S RECEIPT OF INVOICE.

DISCOUNT WILL BE ____% IF ADEQ PAYMENT ISSUANCE DATE TO CONTRACTOR IS WITHIN TEN (10) CALENDAR DAYS FROM ADEQ’S

RECEIPT OF INVOICE.

DISCOUNT WILL BE ____% IF ADEQ PAYMENT ISSUANCE DATE TO CONTRACTOR IS WITHIN ____ (__) CALENDAR DAYS FROM ADEQ’S

RECEIPT OF INVOICE.

Offeror to include one or two paragraph(s) describing how Offeror derived pricing proposed in Pricing Document.

Request for Proposal

Solicitation No. BPM006010

ASRAC Assessment and Remediation of Hazardous Substances

Arizona Department of Environmental Quality (ADEQ)

1110 W. Washington Street Phoenix, AZ 85007

Solicitation Attachment 13 – Pricing Document | Revision No. 1 | Revised 04-23

Offeror Response:

CDM Smith’s pricing was determined based on the following process.

First, we identified several staff persons for each category who would be likely to participate in the types of projects anticipated to be awarded via this contract and tabulated their raw pay rates.

The raw hourly rate for each potential staff person was marked up with the following:

A multiplier of 2.763 is added to the raw rates to cover overhead costs for our North American Unit and Technical Services Unit employees, converting raw rates into burdened rates. For employees in our India Global Resources Center, burdened rates are looked up directly and already include the India GRC overhead.

4% escalation is added to cover the period from April 1, 2024 through March 31, 2025. Most staff receive salary raises effective April 1 of each year. For 2024, CDM Smith used 4% of salaries as a total budget for salary increases.

4% escalation is added to cover the period from April 1, 2025 through March 31, 2026.

Work done between April 1, 2026 and the two-year anniversary of the contract can be done at the proposed rates. It is assumed that rate increases will be provided upon the two-year anniversary of the contract.

A markup of 10.5% is added to the escalated burdened rates for profit.

This amounts to a total escalation of the burdened rates of 19.5%, and an anticipated profit percentage of 9.5%. The 9.5% profit percentage is based on anticipated labor costs during the period of April 1, 2025 through March 31, 2026.

We compared the resulting billing rates for the staff people identified for each category, and selected a single representative billing rate for each category that would be at least as high as some but not necessarily all of the potential staff in that category.

We rounded this rate up to the nearest dollar.

End of Attachment 13

Indicate whether organization will offer a prompt payment discount, please complete one or more that will apply:

File details come from the government source that posted it. Updated .