Bonestroo HH- TCE Signed(Recorded)Completed.pdf
PDF 447 KB Posted
- Attached to
- Finished Water 3B (FW3B)
- Solicitation number
- ITB 23-0416-01
- Issued by
- Rio Arriba County, New Mexico
About this file
The document appears to be an image with repeated characters, which prevents a comprehensive review of the file's contents. Without legible text, I cannot provide a substantive summary of the government contract opportunity or file details. If a clearer version of the document is available, I would be happy to analyze it thoroughly.
Based on the earlier context provided about the Finished Water 3B (FW3B) project in New Mexico, the opportunity involves purchasing and installing approximately 5.4 miles of water pipeline infrastructure, including 20-inch polyvinyl chloride pipe and ductile iron pipe with associated infrastructure components. However, without seeing the actual document contents, I cannot confirm specific contract details, pricing, or other critical information.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .