Boise_District_Fuels_Building_Carpet_Replacement_Specifications_Revised_02_02_2026.pdf
PDF 2 MB Posted
- Solicitation number
- 140L2626Q0006
About this file
This is a specification and contract document for a federal construction project. The Bureau of Land Management Boise District seeks a contractor to replace carpet in the Fuels Modular Building at 2056 Commerce Ave, Boise, ID 83705. The project is titled GAOA Boise District Fuels Building Carpet Replacement, with Matthew Pawlak (PE Civil Engineer) serving as the Owner's Representative. The contractor must supply all labor and materials to remove existing carpet, padding, and wall cove base, then furnish and install new carpet and wall cove base in all rooms and hallways, excluding bathrooms, janitorial closet, and IT COM room. The BLM will relocate furniture and obstructions based on the contractor's proposed schedule. All carpets, glues, trim, and materials must be rated as low or ultra-low VOC or equivalent and match existing materials as closely as possible for COR approval.
The contract employs a unit price structure with three line items: selective demolition of existing carpet, padding, and base (priced per square foot); resilient base and accessories purchase and installation (priced per linear foot); and sheet carpeting purchase and installation (priced per square foot). The contractor must submit product submittals prior to mobilization and an accurate construction schedule within five business days of contract award. Work is restricted to 8:00 a.m. to 5:00 p.m., Monday through Friday, except federal holidays, and the building will remain occupied during construction. The carpet specification requires 100 percent nylon fiber with 9,000 or better density, Silver level ANSI/NSF 140 certification, and CRI Green Label Plus compliance. Both carpet and carpet cushion carry 15-year warranties from Substantial Completion. Installation must comply with CRI Carpet Installation Standards and manufacturer instructions. Vinyl base must be ASTM F 1861 Type TV, 4 inches high, with adhesives containing no more than 50 g/L VOC content.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary of Work
Project Title: GAOA Boise District Fuels Building Carpet Replacement
The Bureau of Land Management Boise District seeks a contractor to replace the carpet found in the Fuels Modular Building at 2056 Commerce Ave. Boise ID 83705. The contractor is to supply all labor and materials required to remove the existing carpet, padding and wall cove base, furnish and install new carpet and wall cove base. The BLM will move all furniture and obstructions within the area of work based on the contract work schedule prior to the start of work under this contract. Areas of work include all rooms and hallways, excluding bathrooms, janitorial closet and IT COM room. All carpets, glues, trim and materials shall be rated as low or ultra-low VOC or equivalent and match existing carpets and trim as closely as possible.
Contractor shall provide product submittals prior to mobilization and an accurate construction schedule within 5 business days of receiving the contract award.
Please refer to the following Drawings and Specifications:
Drawings
Sheet G1 – Title Sheet
Sheet C1 – Fuels Building
Specifications
011000 – Summary
012200 – Unit Prices
017419 – Construction Waste Management
024119 – Selective Demolition
096513 – Resilient Base and Accessories
096816 – Sheet Carpeting
SUMMARY 011000 - 1
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Access to site.
4. Coordination with occupants.
5. Work restrictions.
6. Specification and Drawing conventions.
1.2 PROJECT INFORMATION
A. Project Identification: GAOA Boise District Fuels Building Carpet Replacement
1. Project Location: 2056 Commerce Ave. Boise ID 83705
B. Owner: Department of the Interior Bureau of Land Management.
1. Owner's Representative: Matthew Pawlak PE Civil Engineer Bureau of Land Management Boise District.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and consists of the following:
The Bureau of Land Management Boise District seeks a contractor to replace the carpet found in the fuels building at 2056 Commerce Ave. Boise ID 83705. The contractor is to furnish all materials, equipment, and labor to remove the existing carpet, base, and trim, replace with new carpet, base, and trim. BLM will remove all furniture and obstructions within the area of work prior to the start of work under this contract, based on the contractors proposed schedule. Areas of work include all rooms in the building including hallways. All carpets, glues, trim and materials shall be rated as low or ultra-low VOC or equivalent and shall match existing carpets and trim as closely as possible as approved by the COR.
B. Type of Contract:
1. Project will be constructed under a single prime contract.
Matthew Pawlak Inserted Text
GAOA
SUMMARY 011000 - 2
1.4 ACCESS TO SITE
A. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.
B. Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Driveways, Walkways, and Entrances: Keep driveways loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.
C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.
1.5 COORDINATION WITH OCCUPANTS
A. Full Owner Occupancy: Owner will occupy site during entire construction period.
1.6
Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.
WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.
B. On-Site Work Hours: Limit work in the building to the hours of 8:00 a.m. to 5:00 p.m., Monday through Friday (except federal holidays) unless otherwise indicated.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
D. Restricted Substances: Use of tobacco products and other controlled substances on Project site is not permitted.
1.7 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
SUMMARY 011000 - 3
2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
UNIT PRICES 012200 - 1
SECTION 012200 - UNIT PRICES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for unit prices.
1.2 DEFINITIONS
A. Unit price is a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.
1.3 PROCEDURES
A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.
B. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.
C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.
D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price.
PART 2 - PRODUCTS (Not Used)
UNIT PRICES 012200 - 2
PART 3 - EXECUTION
3.1 SCHEDULE OF UNIT PRICES
Contractor to furnish all labor, installation, tools, parts, materials, equipment, facilities, transportation, and supervision necessary to provide the following:
Line Item Item Description Unit Bid
Price
24119 Selective demolition of existing carpet, padding and base – Square Feet
96516 Resilient Base and Accessories purchase and instal-lation – Linear Feet
96816 Sheet carpeting purchase and installation – Square Feet
TOTAL PROPOSED BID PRICE
END OF SECTION 012200
Copyright 2016 AIA MasterSpec Professional 09/16
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419 - 1
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for the following:
1. Disposing of nonhazardous demolition and construction waste.
1.2 DEFINITIONS
A. Construction Waste: Building, structure, and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.
B. Demolition Waste: Building, structure, and site improvement materials resulting from demolition operations.
C. Disposal: Removal of demolition or construction waste and subsequent salvage, sale, recycling, or deposit in landfill, incinerator acceptable to authorities having jurisdiction, or designated spoil areas on Owner’s property.
D. Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse.
E. Salvage: Recovery of demolition or construction waste and subsequent sale or reuse in another facility.
F. Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorporation into the Work.
1.3 INFORMATIONAL SUBMITTALS
A. Waste Reduction Progress Reports: Concurrent with each Application for Payment, submit report. Include the following information:
1. Material category.
2. Total quantity of waste in tons
1.4 WASTE MANAGEMENT PLAN
1. Disposed Materials: Indicate how and where materials will be disposed of. Include name, address, and telephone number of each landfill and incinerator facility.
Copyright 2016 AIA MasterSpec Professional 09/16
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419 - 2
PART 2 - PRODUCTS
PART 3 - EXECUTION
3.1 PLAN IMPLEMENTATION
A. General: Implement approved waste management plan. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.
B. Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as appropriate for the Work.
1. Distribute waste management plan to entities when they first begin work on-site. Review plan procedures and locations established for salvage, recycling, and disposal.
C. Site Access and Temporary Controls: Conduct waste management operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
3.2 DISPOSAL OF WASTE
A. General: Except for items or materials to be salvaged or recycled, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.
1. Except as otherwise specified, do not allow waste materials that are to be disposed of accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B. Burning: Do not burn waste materials.
END OF SECTION 017419
SELECTIVE DEMOLITION 024119 - 1
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
1.2 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
1.3 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site 2056 Commerce Ave. Boise ID 83705.
1.4 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify Contracting Officer Representative of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. If suspected hazardous materials are encountered, do not disturb; immediately notify
Contracting Officer Representative. Hazardous materials will be removed by Owner under a separate contract.
E. Storage or sale of removed items or materials on-site is not permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
G. Arrange selective demolition schedule so as not to interfere with Owner's operations.
SELECTIVE DEMOLITION 024119 - 2
1.5 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
3.2 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition.
3.3 CLEANING
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B. Burning: Do not burn demolished materials.
SELECTIVE DEMOLITION 024119 - 3
C. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 024119
RESILIENT BASE AND ACCESSORIES 096513 - 1
SECTION 096513 - RESILIENT BASE AND ACCESSORIES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Vinyl base.
2. Vinyl molding accessories.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Sustainable Design Submittals:
1. Product Data: For adhesives, indicating VOC content.
2. Laboratory Test Reports: For adhesives, indicating compliance with requirements for low-emitting materials.
3. Product Data: For sealants, indicating VOC content.
4. Laboratory Test Reports: For sealants, indicating compliance with requirements for low-emitting materials.
5. Laboratory Test Reports: For resilient base and stair products and accessories, indicating compliance with requirements for low-emitting materials.
C. Samples: For each exposed product and for each color and texture specified.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Products shall comply with the requirements of the California Department of Public Health's "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."
2.2 VINYL BASE
A. Product Standard: ASTM F 1861, Type TV (vinyl, thermoplastic).
1. Group: I (solid, homogeneous).
2. Style and Location:
a. Style B, Cove: Provide in areas with replaced carpet.
B. Minimum Thickness: 0.125 inch.
RESILIENT BASE AND ACCESSORIES 096513 - 2
C. Height: 4 inches.
D. Lengths: Coils in manufacturer's standard length.
E. Outside Corners: Job formed.
F. Inside Corners: Job formed.
G. Colors and Patterns: To match existing.
2.3 VINYL MOLDING ACCESSORY
A. Description: Vinyl carpet edge for glue-down applications
B. Profile and Dimensions: As recommended by carpet manufacturer.
C. Locations: Provide vinyl molding accessories as required to match existing.
D. Colors and Patterns: To match existing.
2.4 INSTALLATION MATERIALS
A. Trowelable Leveling and Patching Compounds: Latex-modified, portland-cement-based or blended hydraulic-cement-based formulation provided or approved by resilient-product manufacturer for applications indicated.
B. Adhesives: Water-resistant type recommended by resilient-product manufacturer for resilient products and substrate conditions indicated.
1. Adhesives shall have a VOC content of 50 g/L or less.
C. Stair-Tread Nose Filler: Two-part epoxy compound recommended by resilient stair-tread manufacturer to fill nosing substrates that do not conform to tread contours.
D. Floor Polish: Provide protective, liquid floor-polish products recommended by resilient stair-tread manufacturer.
PART 3 - EXECUTION
3.1 PREPARATION
A. Prepare substrates according to manufacturer's written instructions to ensure adhesion of resilient products.
B. Concrete Substrates for Resilient Stair Accessories: Prepare horizontal surfaces according to
ASTM F 710.
1. Verify that substrates are dry and free of curing compounds, sealers, and hardeners.
RESILIENT BASE AND ACCESSORIES 096513 - 3
2. Remove substrate coatings and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, using mechanical methods recommended by manufacturer. Do not use solvents.
C. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound; remove bumps and ridges to produce a uniform and smooth substrate.
D. Do not install resilient products until materials are the same temperature as space where they are to be installed.
E. Immediately before installation, sweep and vacuum clean substrates to be covered by resilient products.
3.2 RESILIENT BASE INSTALLATION
A. Comply with manufacturer's written instructions for installing resilient base.
B. Apply resilient base to walls, columns, pilasters, casework and cabinets in toe spaces, and other permanent fixtures in rooms and areas where base is required.
C. Install resilient base in lengths as long as practical without gaps at seams and with tops of adjacent pieces aligned.
D. Tightly adhere resilient base to substrate throughout length of each piece, with base in continuous contact with horizontal and vertical substrates.
E. Do not stretch resilient base during installation.
F. On masonry surfaces or other similar irregular substrates, fill voids along top edge of resilient base with manufacturer's recommended adhesive filler material.
G. Preformed Corners: Install preformed corners before installing straight pieces.
H. Job-Formed Corners:
1. Outside Corners: Use straight pieces of maximum lengths possible and form with returns not less than 3 inches in length.
a. Form without producing discoloration (whitening) at bends.
2. Inside Corners: Use straight pieces of maximum lengths possible and form with returns not less than 3 inches in length.
a. Miter corners to minimize open joints.
3.3 RESILIENT ACCESSORY INSTALLATION
A. Comply with manufacturer's written instructions for installing resilient accessories.
RESILIENT BASE AND ACCESSORIES 096513 - 4
B. Resilient Molding Accessories: Butt to adjacent materials and tightly adhere to substrates throughout length of each piece. Install reducer strips at edges of floor covering that would otherwise be exposed.
3.4 CLEANING AND PROTECTION
A. Comply with manufacturer's written instructions for cleaning and protecting resilient products.
B. Cover resilient products subject to wear and foot traffic until Substantial Completion.
END OF SECTION 096513
SHEET CARPETING 096816 - 1
SECTION 096816 - SHEET CARPETING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Woven carpet.
2. Carpet cushion.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Boise District Fuels Building 2056 Commerce Ave. Boise ID 83705
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Sustainable Design Submittals:
1. Product Data: For adhesives, indicating VOC content.
2. Laboratory Test Reports: For adhesives, indicating compliance with requirements for low-emitting materials.
3. Laboratory Test Reports: For flooring products, indicating compliance with requirements for testing and product requirements of CRI's "Green Label Plus" testing program.
4. Laboratory Test Reports: For flooring products, indicating compliance with requirements for low-emitting materials.
C. Samples: For each exposed product and for each color and texture required.
1.4 INFORMATIONAL SUBMITTALS
A. Product test reports.
B. Sample warranties.
1.5 CLOSEOUT SUBMITTALS
A. Maintenance data.
SHEET CARPETING 096816 - 2
1.6 WARRANTY
A. Special Warranty for Carpet: Manufacturer agrees to repair or replace components of carpet installation that fail in materials or workmanship within specified warranty period.
1. Warranty Period: 15 years from date of Substantial Completion.
B. Special Warranty for Carpet Cushion: Manufacturer agrees to repair or replace components of carpet cushion installation that fail in materials or workmanship within specified warranty period.
1. Warranty Period: 15 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 WOVEN CARPET
A. Color: As selected by Architect from manufacturer's full range.
B. Fiber Content: 100 percent Nylon.
C. Density: 9,000 or better.
D. Backing: Manufacturer's standard.
E. Applied Treatments:
1. Applied Soil-Resistance Treatment: Manufacturer's standard material.
2. Antimicrobial Treatment: Manufacturer's standard material.
a. Antimicrobial Activity: Not less than 2-mm halo of inhibition for gram-positive bacteria, not less than 1-mm halo of inhibition for gram-negative bacteria, and no fungal growth, according to AATCC 174.
F. Sustainable Design Requirements:
1. Sustainable Product Certification: Silver level certification according to ANSI/NSF 140.
2. Carpet and cushion shall comply with testing and product requirements of CRI's "Green
Label Plus" testing program.
3. Flooring products shall comply with the requirements of the California Department of
Public Health's "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."
G. Performance Characteristics:
1. Appearance Retention Rating: Severe traffic, 3.5 minimum according to ASTM D 7330.
SHEET CARPETING 096816 - 3
2.2 CARPET CUSHION
A. Traffic Classification: CCC Class III, extra-heavy traffic.
B. Rubber Cushion: Flat.
C. Performance Characteristics:
1. Carpet and cushion shall comply with testing and product requirements of CRI's "Green Label Plus" testing program.
2. Flooring products shall comply with the requirements of the California Department of Public Health's "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."
2.3 INSTALLATION ACCESSORIES
A. Trowelable Leveling and Patching Compounds: Latex-modified, hydraulic-cement-based formulation provided or recommended by carpet cushion manufacturer.
B. Adhesives: Water-resistant, mildew-resistant, nonstaining type to suit products and subfloor conditions indicated, that complies with flammability requirements for installed carpet and is recommended or provided by carpet and carpet cushion manufacturers.
1. Adhesive shall comply with the testing and product requirements of the California Department of Public Health's "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."
C. Tackless Carpet Stripping: Water-resistant plywood, in strips as required to match cushion thickness and that comply with CRI's "Carpet Installation Standard."
D. Seam Adhesive: Hot-melt adhesive tape or similar product recommended by carpet manufacturer for sealing and taping seams and butting cut edges at backing to form secure seams and to prevent pile loss at seams.
PART 3 - EXECUTION
3.1 PREPARATION
A. General: Comply with CRI's "CRI Carpet Installation Standard" and with carpet manufacturer's written installation instructions for preparing substrates.
B. Use trowelable leveling and patching compounds, according to manufacturer's written instructions, to fill cracks, holes, depressions, and protrusions in substrates. Fill or level cracks, holes and depressions 1/8 inch wide or wider, and protrusions more than 1/32 inch, unless more stringent requirements are required by manufacturer's written instructions.
C. Concrete Substrates: Remove coatings, including curing compounds, and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, without using
SHEET CARPETING 096816 - 4
solvents. Use mechanical methods recommended in writing by adhesive, carpet, and carpet cushion manufacturers.
D. Broom and vacuum clean substrates to be covered immediately before installing carpet.
3.2 CARPET INSTALLATION
A. Comply with CRI's "CRI Carpet Installation Standard" and [carpet manufacturer's] [carpet and carpet cushion manufacturers'] written installation instructions for the following:
1. Direct-glue-down installation.
2. Double-glue-down installation.
3. Carpet with attached-cushion installation.
4. Preapplied adhesive installation.
5. Hook-and-loop installation.
6. Stretch-in installation.
7. Stair installation.
B. Comply with carpet manufacturer's written instructions and Shop Drawings for seam locations and direction of carpet; maintain uniformity of carpet direction and lay of pile. At doorways, center seams under the door in closed position.
1. Stretch-in Carpet Installation: Install carpet cushion seams at 90-degree angle with carpet seams.
C. Install borders with mitered corner seams.
D. Do not bridge building expansion joints with carpet.
E. Cut and fit carpet to butt tightly to vertical surfaces, permanent fixtures, and built-in furniture including cabinets, pipes, outlets, edgings, thresholds, and nosings. Bind or seal cut edges as recommended by carpet manufacturer.
F. Extend carpet into toe spaces, door reveals, closets, open-bottomed obstructions, removable flanges, alcoves, and similar openings.
G. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on carpet as marked on subfloor. Use nonpermanent, nonstaining marking device.
H. Protect carpet against damage from construction operations and placement of equipment and fixtures during the remainder of construction period. Use protection methods recommended in writing by carpet manufacturer and carpet cushion and adhesive manufacturers.
END OF SECTION 096816
| Boise District Fuels Building Carpet Replacement Summary of Work |
| Boise District Fuels Building Carpet Replacement Specifications_Revised_02_02_2026 |
| 17419 |
| 24119 |
| 96513 |
| 96816 |
File details come from the government source that posted it. Updated .