Bldg. 20 BM43A and Bldg. 9 UPS 1 and 2 Drawings 05-18-2022.pdf
PDF 14 MB Posted
- Attached to
- UPS Battery Replacement, Ames, IA
- Solicitation number
- 12505B22Q0161
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Location Coordinator:Contracting Officer Rep.:Contracting Officer:Engineering Project Manager:
Task
Order #:
Drawing Title:PROJECT TITLE:
FEU Project #:
Drawing Number:
Agricultural Research Service U.S. Department of Agriculture
NCAH
1920 Dayton Avenue Ames, Iowa 50010
Revision:
Client:
Sheet: Of
Designer:
Date:
Date:
UNITED STATES DEPARTMENT OF AGRICULTURE
AGRICULTURE RESEARCH SERVICE
NATIONAL CENTERS FOR ANIMAL HEALTH
INDEX OF DRAWINGS
CONTRACTOR
PARKING
G-005 Room Photos
Site Entrance & Route to Contractor
Parking
G-002
Index & Title Page
1st Floor Plan
G-003
G-004
BI Floor Plan-South
G-001
BI Floor Plan-North
Order #:
Drawing Title:PROJECT TITLE:
FEU Project #:
Drawing Number:
Agricultural Research Service U.S. Department of Agriculture
NCAH
1920 Dayton Avenue Ames, Iowa 50010
Revision:
Client:
Sheet: Of
Designer:
Date:
Date:
Building 24 loading dock.
Freight elevator
Travel route
Freight elevator
Parking/Loading Dock
Order #:
Drawing Title:PROJECT TITLE:
FEU Project #:
Drawing Number:
Agricultural Research Service U.S. Department of Agriculture
NCAH
1920 Dayton Avenue Ames, Iowa 50010
Revision:
Client:
Sheet: Of
Designer:
Date:
Date:
A2.0A.4
PARTIAL FLOOR PLAN -
BASEMENT LEVEL
INTERSTITIAL - AREA '4'
04.01012.00
R.G. Vanderweil Engineers, Inc.
MEP Engineer
GPR Planners Collaborative, Inc.
Lab Planner / Programmer
One Metropolitan Square
211 North Broadway, Suite 700
St. Louis, Missouri 63102 USA
Fox Engineering Associates, Inc.
Civil Engineer
EPM:
PPM:
FD SHEMB:
FD RPMB:
Dennis Jones
Thomas Bunn & James Harp
T. Roark
E. Riley
USDA Project No:
Prepared for:
2000 Dayton Avenue
5601 Sunnyside Avenue
USDA, ARS, FD, AMB
53-3K15-2-1700
Ames, IA 50010
Beltsville, MD 20705
Project Scope:
National Centers for Animal Health Consolidated Laboratory Facility
FI
N
A L
A S-
B U
IL
TS
/2 1/
Freight Elevator
From Freight Elevator #3
BM43A
Michael.Kuennen Cross-Out
Order #:
Drawing Title:PROJECT TITLE:
FEU Project #:
Drawing Number:
Agricultural Research Service U.S. Department of Agriculture
NCAH
1920 Dayton Avenue Ames, Iowa 50010
Revision:
Client:
Sheet: Of
Designer:
Date:
Date:
A2.0A.3
PARTIAL FLOOR PLAN -
BASEMENT LEVEL
INTERSTITIAL - AREA '3'
04.01012.00
R.G. Vanderweil Engineers, Inc.
MEP Engineer
GPR Planners Collaborative, Inc.
Lab Planner / Programmer
One Metropolitan Square
211 North Broadway, Suite 700
St. Louis, Missouri 63102 USA
Fox Engineering Associates, Inc.
Civil Engineer
EPM:
PPM:
FD SHEMB:
FD RPMB:
Dennis Jones
Thomas Bunn & James Harp
T. Roark
E. Riley
USDA Project No:
Prepared for:
2000 Dayton Avenue
5601 Sunnyside Avenue
USDA, ARS, FD, AMB
53-3K15-2-1700
Ames, IA 50010
Beltsville, MD 20705
Project Scope:
National Centers for Animal Health Consolidated Laboratory Facility
FI
N
A L
A S-
B U
IL
TS
/2 1/
Freight Elevator
To room BM43A
Order #:
Drawing Title:PROJECT TITLE:
FEU Project #:
Drawing Number:
Agricultural Research Service U.S. Department of Agriculture
NCAH
1920 Dayton Avenue Ames, Iowa 50010
Revision:
Client:
Sheet: Of
Designer:
Date:
Date:
STRING #1 STRING
#2
UPS CONTROL PANEL UPS CONTROL PANEL BATTERIES2 and 3
Tommy Walker Architect Three Strings of Batteries to be changed and load tested as per Statement of Work
Michael.Kuennen Inserted Text
| 20021 - Bldg 20 Metal Parapet Repairs - Title Page |
| 20021 - Bldg 20 Metal Parapet Repairs - Sht 2 |
| Page-1� |
| 20021 - Bldg 20 Metal Parapet Repairs - Sht 3 |
| Page-1� |
| 20021 - Bldg 20 Metal Parapet Repairs - Sht 4 |
| Page-1� |
| Project Title: Building 20 Room BM43A and Building 9 UPS Battery Replacement |
| EPM Dropdown: [Ben A'Hearn] |
| CO Dropdown: [TBD] |
| COR Dropdown: [Mike Kuennen] |
| LC: |
| PROJECT TITLE: Bldg. 20 Room BM43A and Building 9 UPS Battery Battery Replacement |
| Task Order-Contract #: TBD |
| Task Order-Contract Award Date=: |
| Revision=For Bid, Review, Construction, etc: Bidding Documents |
| Revision Date:: 5/18/2022 |
| File Name=: Mike Kuennen |
| FEU Project #: TBD |
| Client=ARU, APHIS, CVB, etc: FEU |
| Sheet # Total: 5 |
| Drawing Title 1:: Index & Title Page |
| Drawing Number 1: G-001 |
| Drawing Number 3: G-003 |
| Drawing Title 3:: BI Floor Plan-South |
| Drawing Title 4:: BI Floor Plan-North |
| Drawing Number 4: G-004 |
| Sheet Of 4: 4 |
| Sheet Of 3: 3 |
| Sheet Of 1: 1 |
| EPM Dropdown#1: [Ben A'Hearn] |
| CO Dropdown#1: [TBD] |
| COR Dropdown#1: [Mike Kuennen] |
| LC#1: |
| PROJECT TITLE#1: Bldg. 20 Room BM43A UPS Battery Replacement |
| Task Order-Contract ##1: TBD |
| Task Order-Contract Award Date=#1: |
| Revision=For Bid, Review, Construction, etc#1: Bidding Documents |
| Revision Date:#1: 2/3/20211 |
| File Name=#1: Mike Kuennen |
| FEU Project ##1: 21005 |
| Client=ARU, APHIS, CVB, etc#1: FEU |
| Sheet # Total#1: 5 |
| Drawing Title 4:#1: Room Photos |
| Drawing Number 4#1: G-005 |
| Sheet Of 4#1: 5 |
| EPM Dropdown#2: [Ben A'Hearn] |
| CO Dropdown#2: [TBD] |
| COR Dropdown#2: [Mike Kuennen] |
| LC#2: |
| PROJECT TITLE#2: Bldg. 20 Room BM43A UPS Battery Replacement |
| Task Order-Contract ##2: TBD |
| Task Order-Contract Award Date=#2: |
| Revision=For Bid, Review, Construction, etc#2: Bidding Documents |
| Revision Date:#2: 5/18/2022 |
| File Name=#2: Mike Kuennen |
| FEU Project ##2: TBD |
| Client=ARU, APHIS, CVB, etc#2: FEU |
| Sheet # Total#2: 5 |
| Drawing Title 2:#1: First Floor Plan |
| Drawing Number 2#1: G-002 |
| Sheet Of 2#1: 2 |
File details come from the government source that posted it. Updated .