Bldg 300 SOR (Tentative Final).docx
DOCX document 1 MB Posted
- Attached to
- ACC Bldg. 300 Digital Video Monitoring System
- Solicitation number
- FA480024QA076
About this file
This document is a Statement of Requirement (SOR) for the installation of a Digital Video Monitoring System (DVMS) at Building 300, located off-campus of Langley Air Force Base in Hampton, Virginia. The contractor shall provide all labor, equipment, and material required to procure and install the DVMS, which must connect to the existing Access Control System in the building. The DVMS shall consist of four theft-proof security cameras, a new server to store at least 30 days of video footage, and connectivity to a first-floor workstation. The contractor shall perform operation and maintenance training, provide a one-year warranty on labor, and a 5-year warranty on cameras and servers. There is a related federal contract opportunity, Solicitation Number FA480024QA076, which is a 100% set-aside for small businesses. A site visit for interested vendors is scheduled for August 22, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF REQUIREMENT
Installation of Digital Video Monitoring System (DVMS) Bldg 300, Exploration Way, Hampton, Virginia
1.0 OBJECTIVE. Installation of a Digital Video Monitoring System (DVMS) for Bldg 300, ACC A5/8/9 off base installation.
1.1 Synopsis: Contractor shall plan, procure and install the DVMS in Bldg 300 at Exploration Way, Hampton, Virginia. The contractor shall provide all labor, equipment, and material required to procure and install the DVMS. The contractor shall deliver a complete and useable, new DVMS.
1.2 Existing Conditions. This bldg. currently has no camera coverage that is required to meet the national security laws for buildings that house federal employees at off-site locations. The government requests new equipment to meet these requirements. ACC A5/8/9 currently has an access control system that runs on CCURE software that the new cameras, video and recording capability must be connected to for security recording of personnel entering the building with their access control cards.
This requirement is for qty four (4) cameras and must record up to at least 30 days history on a server technology. The cameras will be run with electrical power through the ceilings and walls, rather than communication cables as this is a non-networked system and separate of the base security system.
2.0 SCOPE.
2.1 The contractor shall install four theft proof security cameras. New electrical cables will be run to each camera as well as communication cables. A new server will be installed to store up to at least 30 days’ worth of video and connect to the CCURE Access Control System. The contractor shall provide connectivity to the workstation on the first floor.
2.2 Execution of work shall be IAW the applicable documents and any installation requirements. The contractor shall comply with all local, state, and federal construction codes and all federal wage laws.
2.3 Any individual performing install or technician services shall have up-to-date certifications or training on the installed system(s). The contractor shall provide a list of the personnel performing the work and documentation of their certifications to the On-Site Representative.
2.4 All required cabling will be encased in the conduit that complements the aesthetics of the facility in which it is installed and or installed within the drop ceilings. All cabling shall be installed IAW the National Electric Code. Cabling placed out of view may be installed without a conduit; however, all cabling will use existing pathways where possible and be bundled together to prevent damage and tangling. The contractor will remove all cabling and old equipment if needed.
2.5 Training. The contractor shall perform operation and maintenance training for the DVMS. The duration of the operator's training shall be commensurate with the complexity of the installed system, subject to the end user’s comprehension.
2.6 Work Area Requirements. The contractor shall clean up all debris and discarded materials resulting from their operations at the end of each workday. All waste materials shall be disposed of offsite unless otherwise approved.
2.7 Warranty. The contractor shall provide a one-year warranty for labor at no cost. Cameras/Servers have a 5-year warranty. The warranty will commence upon Government acceptance of the system. The contractor shall respond to all warranty requests within 12 hours from the first initial e-mail or phone call.
2.8 There shall be no deviations or substitutions without prior approval from the Contracting Officer. The contractor shall not comply with any order, direction, or request of any government personnel unless it is issued in writing and signed by the Contracting Officer.
3.0 SECURITY.
3.1 All work shall be performed during hours as coordinated with an on-site representative. The on-site representative will ensure the Contractor employees and subcontractors have access to the site five days a week, 0800 to 1700, as a minimum, excluding US Federal holidays.
3.2 The Contractor shall be responsible for safeguarding all government equipment, information, and property provided for Contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
4.0 MATERIALS.
4.1 ITEMS MUST BE TAA COMPLIANT. All materials are BRAND-NAME OR EQUIVALENT.
Quantity Desired, Part Number (P/N), Item Description
· Qty 1x, P/N 02403-004 AXIS CAMERA STATION S2108
· Qty 1x, P/N 02321-001 TW8100 RACK MOUNT
· Qty 1x, P/N 02693-004 AXIS CAMERA STATION S9301
· Qty 3x, P/N 02511-001 AXIS M4318-PLVE Panoramic Camera
· Qty 1x, P/N 02148-004 AXIS Q6078-E PTZ Camera
· Qty 1x, P/N 5506-951 T91G61 WALL MOUNT
· Qty 2x Misc. mounting hardware
4.2 Miscellaneous Materials as required: Conduit-Wiremold-Fittings-Cables-Connectors-electrical wiring and certified electrician to install. All tools and ladders will be provided by the contractor. All trash must be removed from the site when completed and disposed of properly.
PLEASE SEE PAGE 4 FOR FLOOR PLAN
image1.png image2.svg GYM CR KITCHEN STORAGE ELECTRICAL KITCHEN 1 3 Keypad Prox. Sensor 3 2 1 1. Front Exterior 2. Back Exterior 3. Side Door 4. 118 9 5 6 7 8 5. Front Interior 6. 101A 7. 101B 8. 131A 9. 139 4 Office for monitoring ACS Controller Cameras 4 each