This file is a detailed cost estimate spreadsheet for a potable water line system replacement project at Moron Air Base, Spain. The project involves extensive infrastructure work across multiple zones (A through N), including demolishing existing underground pipes, installing new polyethylene pipes of various diameters, replacing valves, hydrants, road crossings, and performing GPS surveys. The basic package and an optional scope (Option #1) are included, with itemized costs for materials, labor, and other direct costs.
The federal contract opportunity is a solicitation (FA557625B0007) issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa, with a project value between $500,000 and $1,000,000. Key dates include a pre-proposal conference on 25 June 2025, a question submission deadline of 4 July 2025, and bid submission deadline of 18 July 2025. The solicitation is exclusively for local sources registered to conduct construction business in Spain, with the bid acceptance period valid through 31 December 2025. Contractors must comply with Spanish legislative requirements for government works.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| AF66 Submittals 23-1014 PD.xlsx | XLSX spreadsheet | |
| Solicitation - FA557525B0007.pdf | ||
| Specifications En 23-1014 PD.pdf | ||
| Especificaciones Sp 23-1014 PD.pdf | ||
| Drawings 23-1014 PD.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Basic pkg KTR
| * | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR POTABLE LINE SYSTEM APRON, F2001, PH4 (BASIC PACKAGE) | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 23-1014PD | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| GROUND PENETRATING RADAR GPR | ||||||||||
| GEO-RADAR | ||||||||||
| 1 | Ground Penetrating Radar GPR survey | |||||||||
| Estudio Geo-Radar (GPR) | JOB | |||||||||
| TOTAL GROUND PENETRATING RADAR GPR | ||||||||||
| TOTAL GEO-RADAR |
| ZONE A | ||
| ZONA A | ||
| 2 | Demolish existing underground pipe and accessories | |
| Demolición de tubería enterrada existente y accesorios | Lm | |
| TOTAL ZONE A | ||
| TOTAL ZONA A |
| ZONE B | ||
| ZONA B | ||
| 3 | Demolish existing underground pipe and accessories | |
| Demolición de tubería enterrada existente y accesorios | Lm | |
| TOTAL ZONE B | ||
| TOTAL ZONA B |
| ZONE C | ||
| ZONA C | ||
| 4 | Demolish existing underground pipe and accessories | |
| Demolición de tubería enterrada existente y accesorios | Lm | |
| 5 | Gate Valve 3/4" and accessories | |
| Válvulas de compuerta 3/4" y accesorios | Ea | |
| 6 | Strainer 3/4" and accessories | |
| Filtro colador 3/4" y accesorios | Ea | |
| 7 | Hose Bibb and Hose Connection Vacuum Breaker 3/4" | |
| Grifo de manguera y rompedor de vacío 3/4" | Ea | |
| 8 | Water meter DN15 and accessories | |
| Contador de agua DN15 y accesorios | Ea | |
| 9 | Backflow preventer 6" (RPPD) and accessories | |
| Desconector 6" (RPPD) y accesorios | Ea | |
| 10 | Polyethylene Pipe PE100 DN160 and connection accessories | |
| Tubería polietileno PE100 DN160 y accesorios de conexión | Lm | |
| 11 | Polyethylene Pipe PE100 DN32 and connection accessories | |
| Tubería polietileno PE100 DN32 y accesorios de conexión | Lm | |
| 12 | Road crossing (drilled) RC-1 | |
| Cruce carretera (con topo) RC-1 | Lm | |
| 13 | Road crossing (drilled) RC-2 | |
| Cruce carretera (con topo) RC-2 | Lm | |
| 13 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | JOB | |
| 14 | GPS Survey | |
| Survey GPS | Lm | |
| TOTAL ZONE C | ||
| TOTAL ZONA C |
| ZONE D | ||
| ZONA D | ||
| 15 | Demolish existing underground pipe and accessories | |
| Demolición de tubería enterrada existente y accesorios | Lm | |
| 16 | Air Relief valve | |
| Ventosa | Ea | |
| 17 | Fast acting anti water hammer valve | |
| Válvula de alivio rápido | Ea | |
| 18 | Bollards installation | |
| Instalación de bolardos | Ea | |
| 19 | Polyethylene Pipe PE100 DN200 and connection accessories | |
| Tubería polietileno PE100 DN200 y accesorios de conexión | Lm | |
| 20 | GPS Survey | |
| Survey GPS | Lm | |
| TOTAL ZONE D | ||
| TOTAL ZONA D |
| ZONE E | ||
| ZONA E | ||
| 21 | Demolish existing underground pipe and accessories | |
| Demolición de tubería enterrada existente y accesorios | Lm | |
| 22 | Gate Valve 8", valve box and accessories | |
| Válvula de compuerta 8", caja de válvulas y accesorios | Ea | |
| 23 | Gate Valve 6", valve box and accessories | |
| Válvula de compuerta 6", caja de válvulas y accesorios | Ea | |
| 24 | Polyethylene Pipe PE100 DN200 and connection accessories | |
| Tubería polietileno PE100 DN200 y accesorios de conexión | Lm | |
| 25 | Polyethylene Pipe PE100 DN160 and connection accessories | |
| Tubería polietileno PE100 DN160 y accesorios de conexión | Lm | |
| 26 | Road crossing (drilled) RC-3 | |
| Cruce carretera (con topo) RC-3 | Lm | |
| 27 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | JOB | |
| 28 | GPS Survey | |
| Survey GPS | JOB | |
| TOTAL ZONE E | ||
| TOTAL ZONA E |
| ZONE F | ||
| ZONA F | ||
| 29 | Demolish existing underground pipe and accessories | |
| Demolición de tubería enterrada existente y accesorios | Lm | |
| 30 | Gate Valve 8", valve box and accessories | |
| Válvula de compuerta 8", caja de válvulas y accesorios | Ea | |
| 31 | Air Relief valve | |
| Ventosa | Ea | |
| 32 | Fast acting anti water hammer valve | |
| Válvula de alivio rápido | Ea | |
| 33 | Polyethylene Pipe PE100 DN200 and connection accessories | |
| Tubería polietileno PE100 DN200 y accesorios de conexión | Lm | |
| 34 | Bollards installation | |
| Instalación de bolardos | Ea | |
| 35 | Road crossing (drilled) RC-4 | |
| Cruce carretera (con topo) RC-4 | Lm | |
| 36 | Reinstall water meter | |
| Reinstalar contador de agua | Ea | |
| 37 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | JOB | |
| 38 | GPS Survey | |
| Survey GPS | Lm | |
| TOTAL ZONE F | ||
| TOTAL ZONA F |
| ZONE G | ||
| ZONA G | ||
| 39 | Demolish existing underground pipe and accessories | |
| Demolición de tubería enterrada existente y accesorios | Lm | |
| 40 | Gate Valve 8", valve box and accessories | |
| Válvula de compuerta 8", caja de válvulas y accesorios | Ea | |
| 41 | Gate Valve 6", valve box and accessories | |
| Válvula de compuerta 6", caja de válvulas y accesorios | Ea | |
| 42 | Gate Valve 2", valve box and accessories | |
| Válvula de compuerta 2", caja de válvulas y accesorios | Ea | |
| 43 | Air Relief valve to be reinstalled | |
| Ventosa a reinstalar | Ea | |
| 44 | Valve assembly to be reinstalled | |
| Conjunto de válvulas a reinstalar | Ea | |
| 45 | Polyethylene Pipe PE100 DN200 and connection accessories | |
| Tubería polietileno PE100 DN200 y accesorios de conexión | Lm | |
| 46 | Polyethylene Pipe PE100 DN160 and connection accessories | |
| Tubería polietileno PE100 DN160 y accesorios de conexión | Lm | |
| 47 | Polyethylene Pipe PE100 DN63 and connection accessories | |
| Tubería polietileno PE100 DN63 y accesorios de conexión | Lm | |
| 48 | Bollards installation | |
| Instalación de bolardos | Ea | |
| 49 | Paint and marking of new/existing hydrants | |
| Pintura y marcado de hidrantes nuevos/existentes | Ea | |
| 50 | GPS Survey | |
| Survey GPS | Lm | |
| TOTAL ZONE G | ||
| TOTAL ZONA G |
| ZONE H | ||
| ZONA H | ||
| 51 | Demolish existing underground pipe and accessories | |
| Demolición de tubería enterrada existente y accesorios | Lm | |
| 52 | Gate Valve 8", valve box and accessories | |
| Válvula de compuerta 8", caja de válvulas y accesorios | Ea | |
| 53 | Polyethylene Pipe PE100 DN200 and connection accessories | |
| Tubería polietileno PE100 DN200 y accesorios de conexión | Lm | |
| 54 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | JOB | |
| 55 | Paint and marking of new/existing hydrants | |
| Pintura y marcado de hidrantes nuevos/existentes | Ea | |
| 56 | GPS Survey | |
| Survey GPS | Lm | |
| TOTAL ZONE H | ||
| TOTAL ZONA H |
| ZONE I | ||
| ZONA I | ||
| 57 | Demolish existing underground pipe and accessories | |
| Demolición de tubería enterrada existente y accesorios | Lm | |
| 58 | Gate Valve 8", valve box and accessories | |
| Válvula de compuerta 8", caja de válvulas y accesorios | Ea | |
| 59 | Flush type hydrant, T, valve, pipe and accessories | |
| Hidrante enrasado, T, válvula, tubería y accesorios | Ea | |
| 60 | Polyethylene Pipe PE100 DN200 and connection accessories | |
| Tubería polietileno PE100 DN200 y accesorios de conexión | Lm | |
| 61 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | JOB | |
| 62 | Paint and marking of new/existing hydrants | |
| Pintura y marcado de hidrantes nuevos/existentes | Ea | |
| 63 | GPS Survey | |
| Survey GPS | Lm | |
| TOTAL ZONE I | ||
| TOTAL ZONA I |
| ZONE J | ||
| ZONA J | ||
| 64 | Demolish existing underground pipe and accessories | |
| Demolición de tubería enterrada existente y accesorios | Lm | |
| 65 | Polyethylene Pipe PE100 DN200 and connection accessories | |
| Tubería polietileno PE100 DN200 y accesorios de conexión | Lm | |
| 66 | Polyethylene Pipe PE100 DN180 and connection accessories | |
| Tubería polietileno PE100 DN180 y accesorios de conexión | Lm | |
| 67 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | JOB | |
| 68 | GPS Survey | |
| Survey GPS | Lm | |
| TOTAL ZONE J | ||
| TOTAL ZONA J |
| ZONE K | ||
| ZONA K | ||
| 69 | Demolish existing underground pipe and accessories | |
| Demolición de tubería enterrada existente y accesorios | Lm | |
| 70 | Gate Valve 8", valve box and accessories | |
| Válvula de compuerta 8", caja de válvulas y accesorios | Ea | |
| 71 | Gate Valve 1 1/2", valve box and accessories | |
| Válvula de compuerta 1 1/2", caja de válvulas y accesorios | Ea | |
| 72 | Air Relief valve | |
| Ventosa | Ea | |
| 73 | Flush type hydrant, T, valve, pipe and accessories | |
| Hidrante enrasado, T, válvula, tubería y accesorios | Ea | |
| 73 | Barrel type hydrant, T, valve, pipe and accessories | |
| Hidrante vertical, T, válvula, tubería y accesorios | Ea | |
| 74 | Polyethylene Pipe PE100 DN200 and connection accessories | |
| Tubería polietileno PE100 DN200 y accesorios de conexión | Lm | |
| 75 | Polyethylene Pipe PE100 DN160 and connection accessories | |
| Tubería polietileno PE100 DN160 y accesorios de conexión | Lm | |
| 76 | Polyethylene Pipe PE100 DN110 and connection accessories | |
| Tubería polietileno PE100 DN110 accesorios de conexión | Lm | |
| 77 | Polyethylene Pipe PE100 DN50 and connection accessories | |
| Tubería polietileno PE100 DN50 y accesorios de conexión | Lm | |
| 78 | Road crossing (drilled) RC-5 | |
| Cruce carretera (con topo) RC-5 | Lm | |
| 79 | Road crossing (drilled) RC-6 | |
| Cruce carretera (con topo) RC-6 | Lm | |
| 80 | Road crossing (drilled) RC-7 | |
| Cruce carretera (con topo) RC-7 | Lm | |
| 81 | Emergency shower and accessories | |
| Ducha de emergencia y accesorios | Ea | |
| 82 | Bollards installation | |
| Instalación de bolardos | Ea | |
| 83 | Paint and marking of new/existing hydrants | |
| Pintura y marcado de hidrantes nuevos/existentes | Ea | |
| 84 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | JOB | |
| 85 | GPS Survey | |
| Survey GPS | Lm | |
| TOTAL ZONE K | ||
| TOTAL ZONA K |
| ZONE L | ||
| ZONA L | ||
| 86 | Demolish existing underground pipe and accessories | |
| Demolición de tubería enterrada existente y accesorios | Lm | |
| 87 | Flush type hydrant, T, valve, pipe and accessories | |
| Hidrante enrasado, T, válvula, tubería y accesorios | Ea | |
| 87 | Barrel type hydrant, T, valve, pipe and accessories | |
| Hidrante vertical, T, válvula, tubería y accesorios | Ea | |
| 88 | Gate Valve 8", valve box and accessories | |
| Válvula de compuerta 8", caja de válvulas y accesorios | Ea | |
| 89 | Gate Valve 3/4", valve box and accessories | |
| Válvula de compuerta 3/4", caja de válvulas y accesorios | Ea | |
| 87 | Polyethylene Pipe PE100 DN200 and connection accessories | |
| Tubería polietileno PE100 DN200 y accesorios de conexión | Lm | |
| 88 | Polyethylene Pipe PE100 DN160 and connection accessories | |
| Tubería polietileno PE100 DN160 y accesorios de conexión | Lm | |
| 89 | Bollards installation | |
| Instalación de bolardos | Ea | |
| 90 | Paint and marking of new/existing hydrants | |
| Pintura y marcado de hidrantes nuevos/existentes | Ea | |
| 91 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | JOB | |
| 92 | GPS Survey | |
| Survey GPS | Lm | |
| TOTAL ZONE L | ||
| TOTAL ZONA L |
| ZONE M | ||
| ZONA M | ||
| 93 | Demolish existing underground pipe and accessories | |
| Demolición de tubería enterrada existente y accesorios | Lm | |
| 94 | Gate Valve 8", valve box and accessories | |
| Válvula de compuerta 8", caja de válvulas y accesorios | Ea | |
| 95 | Gate Valve 1 1/2", valve box and accessories | |
| Válvula de compuerta 1 1/2", caja de válvulas y accesorios | Ea | |
| 96 | Flush type hydrant, T, valve, pipe and accessories | |
| Hidrante enrasado, T, válvula, tubería y accesorios | Ea | |
| 97 | Barrel type hydrant, T, valve, pipe and accessories | |
| Hidrante vertical, T, válvula, tubería y accesorios | Ea | |
| 98 | Polyethylene Pipe PE100 DN200 and connection accessories | |
| Tubería polietileno PE100 DN200 y accesorios de conexión | Lm | |
| 99 | Polyethylene Pipe PE100 DN160 and connection accessories | |
| Tubería polietileno PE100 DN160 y accesorios de conexión | Lm | |
| 100 | Polyethylene Pipe PE100 DN50 and connection accessories | |
| Tubería polietileno PE100 DN50 y accesorios de conexión | Lm | |
| 101 | Road crossing (drilled) RC-8 | |
| Cruce carretera (con topo) RC-8 | Lm | |
| 102 | Road crossing (drilled) RC-9 | |
| Cruce carretera (con topo) RC-9 | Lm | |
| 103 | Road crossing (drilled) RC-10 | |
| Cruce carretera (con topo) RC-10 | Lm | |
| 104 | Bollards installation | |
| Instalación de bolardos | Ea | |
| 105 | Paint and marking of new/existing hydrants | |
| Pintura y marcado de hidrantes nuevos/existentes | Ea | |
| 106 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | JOB | |
| 107 | GPS Survey | |
| Survey GPS | Lm | |
| TOTAL ZONE M | ||
| TOTAL ZONA M |
| ZONE N | ||
| ZONA N | ||
| 108 | Demolish existing underground pipe and accessories | |
| Demolición de tubería enterrada existente y accesorios | Lm | |
| 109 | Flush type hydrant, T, valve, pipe and accessories | |
| Hidrante enrasado, T, válvula, tubería y accesorios | Ea | |
| 110 | Polyethylene Pipe PE100 DN200 and connection accessories | |
| Tubería polietileno PE100 DN200 y accesorios de conexión | Lm | |
| 111 | Paint and marking of new/existing hydrants | |
| Pintura y marcado de hidrantes nuevos/existentes | Ea | |
| 112 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | JOB | |
| 113 | GPS Survey | |
| Survey GPS | Lm | |
| TOTAL ZONE N | ||
| TOTAL ZONA N |
| TOTAL GROUND PENETRATING RADAR GPR |
| TOTAL GEO-RADAR |
| TOTAL ZONE A |
| TOTAL ZONA A |
| TOTAL ZONE B |
| TOTAL ZONA B |
| TOTAL ZONE C |
| TOTAL ZONA C |
| TOTAL ZONE D |
| TOTAL ZONA D |
| TOTAL ZONE E |
| TOTAL ZONA E |
| TOTAL ZONE F |
| TOTAL ZONA F |
| TOTAL ZONE G |
| TOTAL ZONA G |
| TOTAL ZONE H |
| TOTAL ZONA H |
| TOTAL ZONE I |
| TOTAL ZONA I |
| TOTAL ZONE J |
| TOTAL ZONA J |
| TOTAL ZONE K |
| TOTAL ZONA K |
| TOTAL ZONE L |
| TOTAL ZONA L |
| TOTAL ZONE M |
| TOTAL ZONA M |
| TOTAL ZONE N |
| TOTAL ZONA N |
| TOTAL |
| TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD %
SUBTOTAL
PROFIT %
| TOTAL PROJECT EUROS (BASIC PACKAGE) | |
| euros |
PREPARED BY:
REVIEWED BY:
APPROVED BY:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"Page &P of &N
Option #1 (obstructions) KTR
| * | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR POTABLE LINE SYSTEM APRON, F2001, PH4 (OPTION #1) | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 23-1014PD | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| OPTION #1 | ||||||||||
| OPCIÓN #1 | ||||||||||
| 1 | Demolish underground concrete block | |||||||||
| Demoler bloque de hormigón enterrado | Ea | |||||||||
| 2 | Gate Valve 8" and accessories | |||||||||
| Válvulas de compuerta 8" y accesorios | Ea | |||||||||
| 3 | Air Relief valve | |||||||||
| Ventosa | Ea | |||||||||
| 4 | Fast acting anti water hammer valve | |||||||||
| Válvula de alivio rápido | Ea | |||||||||
| 5 | Polyethylene Pipe PE100 DN200 and connection accessories | |||||||||
| Tubería polietileno PE100 DN200 y accesorios de conexión | Lm | |||||||||
| 6 | Flush type hydrant, T, valve, pipe and accessories | |||||||||
| Hidrante enrasado, T, válvula, tubería y accesorios | Ea | |||||||||
| 7 | Barrel type hydrant, T, valve, pipe and accessories | |||||||||
| Hidrante vertical, T, válvula, tubería y accesorios | Ea | |||||||||
| 8 | Road crossing (drilled) RC-3 | |||||||||
| Cruce carretera (con topo) RC-3 | Lm | |||||||||
| TOTAL OPTION #1 | ||||||||||
| TOTAL OPCIÓN #1 |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD %
SUBTOTAL
PROFIT %
TOTAL PROJECT EUROS (OPTION #1)
PREPARED BY:
REVIEWED BY:
APPROVED BY:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .