BL127-21 INV
978 KB Posted
- Attached to
- Fire Alarm System testing, inspection, etc.
- Solicitation number
- BL127-21
- Issued by
- Gwinnett County, Georgia
About this file
Summary
This is an Invitation to Bid (BL127-21) issued by the Gwinnett County Board of Commissioners for full inspection, testing, maintenance, repair, and installation services of fire alarm systems at various county buildings on an annual contract with four additional one-year renewal options. The solicitation covers approximately 100 county facilities including government buildings, libraries, sheriff's office detention centers, fire stations, police precincts, water resources facilities, and parks and recreation centers. Services must be performed in accordance with National Fire Protection Association standards and manufacturer recommendations, with factory-trained and NICET Level II certified personnel required. The contractor must provide weekly, semiannual, and annual inspection and testing schedules as detailed in comprehensive specifications, along with 24/7/365 emergency repair and installation services with a three-hour emergency response time requirement and two-day standard response time. The pre-bid meeting was scheduled for November 5, 2021 at 10:00 AM via WebEx, the question deadline was November 9, 2021 at 12:00 PM, and sealed bids were due November 16, 2021 by 2:50 PM, with public opening at 3:00 PM. The contract was set to begin February 7, 2022, with pricing to remain firm for the initial contract term.
The award will be made in three parts based on fire alarm system manufacturer: Part I covers inspection, testing, and maintenance services plus repair and installation for Fire-Lite, Silent Knight, Simplex, Gamewell/FCI, Bosch, Siemens, Radionics, GE, and Audiosone systems; Part II covers Notifier-authorized repair and installation services; and Part III covers EST-authorized repair and installation services. Each part will be awarded to the lowest responsive and responsible bidder based on cumulative pricing from the bid schedule. Bidders must provide hourly labor rates for normal business hours (8:00 AM to 5:00 PM, Monday-Friday), overtime rates, and emergency rates, plus a parts and materials markup not to exceed 10%. The bid schedule requires pricing for inspection, testing, and maintenance services at each facility broken down by weekly, semiannual, and annual frequencies. All successful bidders must obtain insurance meeting Gwinnett County requirements including $500,000 commercial general liability, $500,000 auto liability, and $1,000,000 umbrella liability with A.M. Best rating of A-5 or higher, along with workers' compensation coverage. Bidders must submit references demonstrating similar project experience, employee qualifications with documentation of training and certifications, contractor affidavit verifying E-Verify participation, Code of Ethics affidavit, and security clearance documentation for all personnel who will access secure county facilities.
Text of this file
BL127-21 PAGE 1
October 27, 2021
INVITATION TO BID
BL127-21
The Gwinnett County Board of Commissioners is soliciting competitive sealed bids from qualified suppliers for the Full Inspection, Testing, Maintenance, Repair, and Installation Services of Fire Alarm Systems at Various County Buildings on an Annual Contract with four (4) additional one-year options to renew for various Gwinnett County Departments.
Bids should be typed or submitted in ink and returned in a sealed container marked on the outside with the BL# and Company Name. Bids will be received until 2:50 P.M. local time on November 16, 2021 at the Gwinnett County Financial Services - Purchasing Division – 2nd Floor, 75 Langley Drive, Lawrenceville, Georgia 30046. Any bid received after this date and time will not be accepted. Bids will be publicly opened and read at 3:00 P.M. Apparent bid results will be available the following business day on our website www.gwinnettcounty.com.
A WebEx pre-bid meeting is scheduled for 10:00 A.M. on November 05, 2021. To access, dial 1-408-418-9388, enter Access Code 2397 099 0803. All interested parties are urged to attend. Questions regarding bids should be directed to Brittany Taylor, Purchasing Associate II, at Brittany.K.Taylor@GwinnettCounty.com or by calling 770- 822-7759, no later than 12:00PM November 09, 2021. Bids are legal and binding upon the bidder when submitted.
All bids should be submitted in duplicate.
Successful supplier(s) will be required to meet insurance requirements. The Insurance Company should be authorized to do business in Georgia by the Georgia Insurance Department, and must have an A.M. Best rating of A-5 or higher.
Gwinnett County does not discriminate on the basis of disability in the admission or access to its programs or activities. Any requests for reasonable accommodations required by individuals to fully participate in any open meeting, program or activity of Gwinnett County Government should be directed to the ADA Coordinator at the Gwinnett County Justice and Administration Center, 770-822-8165.
The written bid documents supersede any verbal or written prior communications between the parties.
Award will be made to the supplier(s) submitting the lowest responsive and responsible bid. Gwinnett County reserves the right to reject any or all bids to waive technicalities and to make an award deemed in its best interest.
Bids may be split or awarded in entirety. Gwinnett County reserves the option to negotiate terms, conditions and pricing with the lowest responsive, responsible bidder(s) at its discretion.
Award notification will be posted after award on the County website, www.gwinnettcounty.com and companies submitting a bid will be notified via email.
We look forward to your bid and appreciate your interest in Gwinnett County.
Brittany Taylor
Brittany Taylor Purchasing Associate II
The following pages should be returned in duplicate as your bid: Bid Schedule, Pages 21-29 References, Page 30 Employee Qualifications, Page 31 Contractor Affidavit, Page 32 Code of Ethics, Page 33 List of Subcontractors, Page 34 http://www.gwinnettcounty.com/ mailto:Brittany.K.Taylor@GwinnettCounty.com
BL127-21 PAGE 2
FIRE ALARM INSPECTION, TESTING, MAINTENANCE, REPAIR AND INSTALLATION
SPECIFICATIONS
The Gwinnett County Board of Commissioners is soliciting bids from qualified Contractors to provide inspection, testing, maintenance, repair, and installation services of the fire alarm systems at various County buildings. The minimum requirements for this work are outlined in this Bid document. This Bid has the following components:
1. Inspection, testing, and maintenance services on all fire alarm systems; repair and installation services for Fire-Lite, Silent Knight, Simplex, Gamewell/FCI, Bosch, Siemens, Radionics, GE, and Audiosone fire alarm systems; and repair and installation services of non-proprietary components (such as batteries, non-intelligent devices, etc.) on all fire alarm systems.
2. Repair and installation services for Notifier fire alarm systems.
3. Repair and installation services for EST fire alarm systems.
The inspection, testing, and maintenance services; repair and installation services for Fire-Lite, Silent Knight, Simplex, Gamewell/FCI, Bosch, Siemens, Radionics, GE, and Audiosone fire alarm systems; and repair and installation services of non-proprietary components (such as batteries, non-intelligent devices, etc.) on all fire alarm systems, will be awarded to the lowest responsive and responsible bidder. Repair and installation services for Notifier fire alarm systems will be awarded to the Notifier authorized service organization submitting the lowest responsive and responsible bid. Repair and installation services for EST fire alarm systems will be awarded to the EST authorized service organization submitting the lowest responsive and responsible bid.
I. SCOPE OF SERVICES
A. General All services shall be performed in accordance with the requirements of the National Fire Protection Association, the manufacturer’s recommendations, and the authority having jurisdiction.
Prior to performing any work, the Contractor shall receive authorization from the County representative. In addition, the Contractor shall notify the alarm-monitoring agency of the work, to prevent unnecessary response of the fire department.
Finally, the Contractor shall notify building occupants of the work by coordinating with the county representative of the county representative’s designee.
Proper precautions shall be taken to prevent annunciating devices from operating needlessly. Annunciating devices should only be activated when they are specifically being tested. At the conclusion of the performed work, the County representative, monitoring agency, and building occupants shall be notified that work has been concluded. The Contractor shall coordinate work to prevent interruption of critical building systems or equipment. Virtually all of the monitored systems are done through a dialer.
The Contractor shall provide service personnel that are qualified and experienced in the inspection, testing, maintenance, repair, and installation of fire alarm systems. Because each manufacturer’s control equipment is different, service personnel shall be factory trained and certified to service, repair, install, and program the specific manufacturer’s equipment. If the Contractor does not have the proper qualified personnel within its staff, the Contractor shall subcontract these services to a qualified firm. Regardless, the selected Contractor is responsible for the services. In addition, fire alarm service personnel shall have a minimum NICET Level II certification in fire alarm systems.
The Contractor is expected to perform its duties with limited involvement from County personnel. The Contractor will be provided with fire system drawings at its request.
Inspections The County representative and the Contractor will develop a detailed schedule for inspecting each location. This schedule will have specific dates and times for inspecting each facility. The Contractor’s personnel will notify the County representative when they arrive at each facility, and when they have completed operations for each facility. If operations are not completed on that day, the Contractor shall provide the County representative with a status update via email.
Equipment performance can be affected by building modifications, occupancy changes, environmental condition changes, device location, physical obstructions, device orientation, physical damage, improper installation, degree of cleanliness, or other obvious problems that might not be indicated through electrical supervision. Visual inspections shall be performed in accordance with the NFPA and the authority having jurisdiction. The minimum inspection frequencies are shown in the following table. After a facility has been inspected, a detailed report should be emailed to the County representative within seven business days. The Contractor shall contact the County representative immediately for items requiring emergency attention.
BL127-21 PAGE 3
All semi-annual and annual inspection requirements for the Justice and Administration Center will need to be performed after hours.
Component Weekly Semiannual Annual
1. Control Equipment: Fire Alarm Systems Monitored for Alarm, Supervisory, and Trouble Signals
(a) Fuses X
(b) Interfaced equipment X
(c) Lamps and LED’s X
(d) Primary Power Supply X
2. Control Equipment: Fire Alarm Systems Unmonitored for Alarm, Supervisory, and
(a) Fuses X X X
(b) Interfaced equipment X X X
(c) Lamps and LED’s X X X
(d) Primary Power Supply X X X
3. Batteries
(a) Lead-acid X X
(b) Nickel-cadmium X X
(c) Primary (dry cell) X X
(d) Sealed lead-acid X X
4. Transient Suppressors X X
5. Control Unit Trouble Signals X X X
6. Fiber-Optic Cable Connections X
7. Emergency Voice/Alarm Communications Equipment X X
8. Remote Annunciators X X
9. Initiating Devices
(a) Air sampling X X
(b) Duct detectors X X
(c) Electromech releasing devices
X X
(d) Fire alarm boxes X X
(e) Heat detectors X X
(f) Smoke detectors X X
(g) Supervisory signal devices
X X
(h) Projected beam type X X
10. Interface Equipment X X
11. Alarm Notification Appliances: Supervised X X
12. Supervising Station Fire Alarm Systems: Transmitters X X
BL127-21 PAGE 4
Testing The County representative and the Contractor will develop a detailed schedule for testing each location. This schedule will have specific dates and times for testing each facility. The Contractor’s personnel will notify the County representative when they arrive at each facility, and when they have completed operations for each facility. If operations are not completed on that day, the Contractor shall provide the County representative with a status update via email.
Testing shall be performed in accordance with the NFPA and the authority having jurisdiction. The minimum testing requirements are shown in the following table.
For all other locations, any testing or sounding of the notification devices, as part of the semi-annual or annual inspections, will need to be performed after hours.
Test Methods
Device Method
1. Control Equipment
(a) Functions
At a minimum, control equipment shall be tested to verify correct receipt of alarm, supervisory, and trouble signals, operation of evacuation signals and auxiliary functions, circuit supervision including detection of open circuits and ground faults, and power supply supervision for detection of loss of ac power and disconnection of secondary batteries.
(b) Fuses The rating and supervision shall be verified.
(c) Interfaced equipment
Integrity of single or multiple circuits providing interface between two or more control panels shall be verified. Interfaced equipment connections shall be tested by operating or simulating operation of the equipment being supervised.
Signals required to be transmitted shall be verified at the control panel.
(d) Lamps and LED’s Lamps and LEDs shall be illuminated.
(e) Primary power supply
All secondary power shall be disconnected and tested under maximum load, including all alarm appliances requiring simultaneous operation. All secondary power shall be reconnected at end of test. For redundant power supplies, each shall be tested separately.
3. Batteries: General Tests Prior to conducting any battery testing, the person conducting the test shall ensure that all system software stored in volatile memory is protected from loss.
(a) Visual inspection
Batteries shall be inspected for corrosion or leakage. Tightness of connections shall be checked and ensured. If necessary, battery terminals or connections shall be cleaned and coated. Electrolyte level in lead-acid batteries shall be visually inspected.
(b) Battery replacement Batteries shall be replaced in accordance with the recommendations of the alarm equipment manufacturer or when the recharged battery voltage or current falls below the manufacturer’s recommendations.
(c) Charger test Operation of battery charger shall be checked in accordance with charger test for the specific type of battery.
(d) Discharge test With the battery charger disconnected, the batteries shall be load tested following the manufacturer’s recommendations. The voltage level shall not fall below the levels specified.
(e) Load voltage test
With the battery charger disconnected, the terminal voltage shall be measured while supplying the maximum load required by its application. The voltage level shall not fall below the levels specified for the specific type of battery. If the voltage falls below the level specified, corrective action shall be taken and the batteries shall be retested.
4. Transient Suppressors Lightning protection equipment shall be inspected and maintained per the manufacturer’s specifications. Additional inspections shall be required after any lightning strikes.
BL127-21 PAGE 5
Test Methods
Device Method
5. Control Unit Trouble Signals
(a) Audible and visual Operation of panel trouble signals shall be verified as well as ring-back feature for systems using a trouble-silencing switch that requires resetting.
(b) Disconnect switches If control unit has disconnected or isolating switches, performance of intended function of each switch shall be verified and receipt of trouble signal when a supervised function is disconnected shall also be verified.
(c) Ground-fault monitoring circuit
If the system has a ground detection feature, the occurrence of ground-fault indication shall be verified whenever any installation conductor is grounded.
(d) Transmission of signals to off-premises location
An initiating device shall be actuated and receipt of alarm signal at the off-premises location shall be verified. A trouble condition shall be created and receipt of a trouble signal at the off-premises location shall be verified. A supervisory device shall be actuated and receipt of a supervisory signal at the off-premises location shall be verified. If a transmission carrier is capable of operation under a single- or multiple-fault condition, an initiating device shall be activated during such fault condition and receipt of a trouble signal at the off-premises location shall be verified, in addition to the alarm signal.
6. Remote Annunciators The correct operation and identification of annunciators shall be verified. If provided, the correct operation of annunciator under a fault condition shall be verified.
7. Initiating Devices
(a) Electromech releasing device
Correct operation shall be verified including operation of the associated device.
Any moving parts shall be lubricated as necessary.
(b) Heat detectors Restorable devices shall be heat tested with a heat source per the manufacturer’s recommendations for response within 1 minute. Non-restorable devices shall not be heat tested. Functionality shall be tested mechanically and electrically.
(c) Fire alarm boxes Manual fire alarm boxes shall be operated per the manufacturer’s instructions.
Key-operated pre-signal and general alarm manual fire alarm boxes shall both be tested.
(d) Smoke detectors
The detectors shall be tested in place to ensure smoke entry into the sensing chamber and an alarm response. Testing with smoke or listed aerosol approved by the manufacturer shall be permitted as acceptable test methods. Other methods approved by the manufacturer that ensure smoke entry into the sensing chamber shall be permitted. Smoke detector sensitivity shall be checked each year per NFPA requirement. Air duct detectors shall be tested to ensure that the device will sample the air stream. The test shall be made in accordance with the manufacturer’s instructions. Projected beam detectors shall be tested by introducing smoke, other aerosol, or an optical filter into the beam path. For smoke detectors with control output functions, it shall be verified that the control capability shall remain operable even if all of the initiating devices connected to the same initiating device circuit or signaling line circuit are in an alarm state.
(e) Initiating devices, supervisory
Supervisory devices shall be operated, and signal receipt verified per NFPA requirements.
(f) Air sampling Per manufacturer’s recommended test methods.
(g) Projected beam type The detector shall be tested by introducing smoke, other aerosol, or an optical filter into the beam path.
8. Alarm Notification Appliances
BL127-21 PAGE 6
Test Methods
Device Method
(a) Audible
Sound pressure level shall be measured with sound level meter meeting ANSI S1.4a, Specifications for Sound Level Meters, Type 2 requirements. Levels throughout protected area shall be measured and recorded. The sound level meter shall be set in accordance with ANSI S3.41, American National Standard Audible Evacuation Signal, using the time-weighted characteristics F (FAST).
Record the maximum output when the audible emergency evacuation signal is on.
(b) Audible textural notification appliances
Sound pressure level shall be measured with sound level meter meeting ANSI S1.4a, Specifications for Sound Level Meters, Type 2 requirements. Levels throughout protected area shall be measured and recorded. The sound level meter shall be set in accordance with ANSI S3.41, American National Standard Audible Evacuation Signal, using the time-weighted characteristics F (FAST).
Record the maximum output when the audible emergency evacuation signal is
on. Audible information shall be verified to be distinguishable and understandable.
(c) Visible
Test shall be performed in accordance with the manufacturer’s instructions.
Appliance locations shall be verified to be per approved layout and it shall be confirmed that no floor changes affect the approved layout. Verify that the candela rating marking agrees with the approved drawings. It shall be confirmed that each appliance flashes.
9. Supervising Station Fire Alarm Systems: Transmission Equipment
Test shall be performed on all system functions and features in accordance with the equipment manufacturer’s instructions for correct operation. Initiating device shall be actuated. Receipt of the correct initiating device signal at the supervising station within 90 seconds shall be verified. Upon completion of the test, the system shall be restored to its functional operation condition.
10. Interfaced Equipment Interface equipment connections shall be tested by operating or simulating the equipment being supervised. Signals required to be transmitted shall be verified at the control panel.
The minimum testing frequencies are shown in the following table. Testing shall be done more frequently if required by the NFPA or the authority having jurisdiction. A detailed report should be emailed to the County representative within seven business days after a facility has been tested. The Contractor shall contact the County Representative immediately for items requiring emergency attention.
Component Semiannual Annual
1.Control Equipment: Fire Alarm Systems Monitored for Alarm, Supervisory, and
(a) Functions X
(b) Fuses X
(c) Interfaced equipment X
(d) Lamps and LED’s X
(e) Primary Power Supply X
2. Control Equipment: Fire Alarm Systems Unmonitored for Alarm, Supervisory, and
(a) Functions X X
BL127-21 PAGE 7
B. Maintenance
The selected Contractor shall maintain the fire alarm system equipment in accordance with the manufacturer’s instructions. The frequency of maintenance of fire alarm system equipment shall depend on the type of equipment and the local ambient conditions. The selected Contractor shall increase the maintenance frequency for those fire alarm system components located in extreme conditions (i.e. areas with temperature extremes, dirty/dusty environments, or damp environments). The frequency of cleaning of fire alarm system equipment shall depend on the type of equipment and the local ambient conditions. The selected Contractor shall clean all smoke detectors and duct detectors at least once per year with clean dry compressed air. The selected Contractor shall clean and realign all projected beam detectors at least twice per year. The selected Contractor shall service Vesda systems per the manufacturer’s recommended service guidelines. The selected Contractor shall increase the cleaning frequency for those fire alarm system components located in extreme conditions (i.e. areas with temperature extremes, dirty/dusty environments, or damp environments). A detailed report should be emailed to the County representative within seven business days after maintenance work has been performed at a facility. The Contractor shall contact the County Representative immediately for items requiring emergency attention.
Component Semiannual Annual
(b) Fuses X X
(c) Interfaced equipment X X
(d) Lamps and LED’s X X
(e) Primary Power Supply X X
3. Batteries
(a) Lead-acid X X
(b) Nickel-cadmium X X
(c) Primary (dry cell) X X
(d) Sealed lead-acid X X
4. Transient Suppressors X
5. Control Unit Trouble Signals X
6. Remote Annunciators X
7. Initiating Devices
(a) Electromech releasing devices X
(b) Heat detectors X
(c) Fire alarm boxes X
(d) Smoke detectors X
(e) Initiating devices, supervisory X
(f) Air sampling X
(g) Projected beam type X
8. Alarm Notification Appliances X
9. Supervising Station Fire Alarm Systems: Transmission Equipment X
10. Interfaced Equipment X
BL127-21 PAGE 8
C. Repair and Installation Services
The Contractor will provide repair and installation of fire alarm systems and components on an as needed basis in response to service requests issued by the County Representative. These services may include the purchase of equipment and components needed for new installations and replacements. The Contractor shall provide all of the supervision, labor, transportation, equipment, parts, materials, and supplies needed to complete the repairs and installations. The Contractor will be expected to perform its services with limited involvement from County personnel.
D. Building and Equipment List
The following list includes the County buildings covered and the estimated initiating device count in this contract. The County reserves the right to add facilities during the contract period at a mutually agreeable and comparable rate, and to remove facilities as needed. The Purchasing Division representative will provide written confirmation of any additions or deletions.
Based on the available resources at the time of release of this Specification, this device count is accurate. However, there may be instances where the count does not reflect the exact installed conditions. The Contractor should consider these minimum inaccuracies when preparing the Bid Schedule.
For facilities with less than fifty (50) initiating devices, the Contractor should allow for a range of five (5) devices. For facilities with fifty (50) or more devices, the Contractor should allow for a range of ten (10) devices. In addition to the initiating devices, each panel can be assumed to have battery backup, electromechanical releasing devices, and annunciating devices. These device counts are not listed in the following building list. However, the cost for inspecting and/or testing these devices should be included in the Contractor’s annual price shown on the Bid Schedule.
BL127-21 PAGE 9
Facilities Management Buildings
Location Pull
Station Smoke Detector
Heat Detector
Duct Detector
Control Valves
Water-flow Device
Gwinnett Justice & Administration Center 75 Langley Drive, Lawrenceville, GA 30046 Panel: Notifier NFS 320 (qty 7) Elevators: 8 plus 39 Beam Detectors and
13 Vesda Systems
1 18 27 23
Gwinnett Historic Courthouse 185 Crogan Street, Lawrenceville, GA 30046 Panel: Silent Knight 5820XL Elevators: 1
8 35 1 14 7 2
Gwinnett Government Annex Building 750 South Perry Street, Lawrenceville, GA 30046 Panel: Fire-Lite MS9200UDLS
10 125 1 0 0 0
One Justice Square 446 West Crogan Street, Lawrenceville, GA 30046 Panel: Fire-Lite MS9600UDLS Elevators: 1
9 31 3 8 8 5
Hi Hope Lane Storage 665 Hi Hope Lane, Lawrenceville, GA 30043 Panel: Fire-Lite MS9200UD
5 13 0 0 0 0
Female Seminary 415 South Perry Street, Lawrenceville, GA 30046 Panel: Ademco Vista 100
0 4 0 0 0 0
Buford Human Service Center 2755 Sawnee Avenue, Buford, GA 30518 Panel: Fire-Lite MS9200
9 63 5 4 1 1
Norcross Human Service Center 5030 Georgia Belle Court, Norcross, GA 30093 Panel: Fire-Lite MS9200UD Elevators: 1
22 79 1 4 1 1
Lawrenceville Senior Center 225 Benson Street, Lawrenceville, GA 30046 Panel: Fire-Lite MS9200UD
5 0 0 10 1 1
Courts Annex 115 Stone Mountain Street, Lawrenceville, GA 30046 Panel: Edwards EST3
19 179 13 15 12 4
Fleet Management Facility 620 Swanson Drive, Lawrenceville, GA 30043 Panel: Notifier 500
17 14 0 5 4 4
Correctional Institute 750 Hi Hope Road, Lawrenceville, GA 30043 Panel: Edwards EST3 (Qty 5)
42 336 90 52 5 31
Central Services 455 Grayson Highway, Lawrenceville, GA 30045 Panel: Fire-Lite MS9600
15 5 0 10 0 0
Department of Driver Services 310 Hurricane Shoals NE, Lawrenceville, GA 30046 Panel: Fire-Lite MS9600
6 8 0 3 3 3
Snellville Tag Office 2845 Lenora Church Road, Snellville, GA 30078 Panel: Fire-Lite MS9200UDLS
1 3 1 0 0 0
DOT Central Facility 620 Winder Highway, Lawrenceville, GA 30045 Panel: Edwards Quickstart
16 8 2 4 0 0
BL127-21 PAGE 10
Facilities Management Buildings - Continued
Pull
Station Smoke Detector
Heat Detector
Duct Detector
Control Valves
Water-flow Device
Air Traffic Control Tower 590 Briscoe Boulevard, Lawrenceville, GA 30046 Panel: Fire-Lite MS9200
3 10 1 3 1 1
Peachtree Corners Tag Office 5270 Peachtree Parkway, Norcross, GA 30092 Panel: Fire-Lite MS9200
3 6 1 3 1 1
North Gwinnett Tag Office 2735 Mall of Georgia Boulevard, Buford, GA 30519 Panel: Notifier AFP-200
7 12 0 6 0 0
Gwinnett Senior Services 567 Swanson Drive, Lawrenceville, GA 30043 Panel: FireLite MS9200
3 12 0 0 1 1
Centerville Senior Center 3025 Bethany Church Road, Snellville, GA 30039 Panel: Honeywell
Morgue and Medical Examiner’s Office 320 Hurricane Shoals Road NE Lawrenceville, GA 30046 Panel: Notifier
Library Branch Buildings
Pull
Station Smoke Detector
Heat Detector
Duct Detector
Control Valves
Water-flow Device
Buford Library 2100 Buford Highway, Buford, GA 30518 Panel: Silent Knight 5700
8 19 1 4 0 0
Centerville Library & Community Center 3025 Bethany Church Road, Snellville, GA 30039 Panel: Radionics D9412
7 13 0 14 1 1
Collins Hill Library 455 Camp Perrin Road, Lawrenceville, GA 30043 Panel: Fire-Lite MS9200UDLS
4 0 0 4 0 0
Duluth Library 3480 Duluth Park Lane, Duluth, GA 30096 Panel: Silent Knight 5700
6 22 1 4 1 1
Elizabeth Williams Library 2740 Lenora Church Road, Snellville, GA 30078 Panel: Silent Knight 5700
6 21 1 6 0 0
Five Forks Library 2780 Five Forks Trickum Road Lawrenceville, GA 30044 Panel: Simplex 4002
6 5 0 6 0 0
Lawrenceville Library 1001 Lawrenceville Highway, Lawrenceville Panel: Silent Knight 5700
10 56 3 4 0 0
Old Lilburn Library 788 Hillcrest Road NW, Lilburn, GA 30047 Panel: Silent Knight 5700
6 19 9 4 0 0
Mountain Park Library 1210 Pounds Road SW, Lilburn, GA 30047 Panel: Silent Knight 5700
6 19 1 4 0 0
Norcross Library 6025 Buford Highway, Norcross, GA 30071 Panel: Silent Knight 5700
6 16 1 2 0 0
BL127-21 PAGE 11
Library Branch Buildings - Continued
Pull
Station Smoke Detector
Heat Detector
Duct Detector
Control Valves
Water-flow Device
Peachtree Corners Library 5570 Spalding Drive, Norcross, GA 30092 Panel: Silent Knight 5700
6 29 1 6 0 0
Suwanee Library 361 Main Street, Suwanee, GA 30024 Panel: Bosch D9421G
2 43 0 0 1 1
Dacula Library 265 Dacula Road, Dacula, GA 30019 Panel: Bosch D9421G
5 11 0 12 1 1
Grayson Library 700 Grayson Parkway, Grayson, GA 30017 Panel: Bosch D9421G
5 13 0 12 1 1
Hamilton Mill Library 3690 Braselton Highway, Buford, GA 30519 Panel: GE FireWorx*
5 8 1 5 1 1
Lilburn Library and City Hall 340 Main Street, NW, Lilburn, GA 30047 Panel: EST
Sheriff’s Office
Pull
Station Smoke Detector
Heat Detector
Duct Detector
Control Valves
Water-flow Device
Plunkett Building Detention Center 2900 University Parkway, Lawrenceville, GA 30043 User Interface: Honeywell XBS Panel: Honeywell FS90 Plus (Qty 10) Elevators: 2
91 416 41 80 45 41
Tower One Detention Center 2900 University Parkway, Lawrenceville, GA 30043 Notifier NFS – 3030/E Remote Panels: 3 Elevators: 6 plus 21 Beam Detectors
21 18 30 66
Department of Water Resources
Location Pull
Station Smoke Detector
Heat Detector
Duct Detector
Control Valves
Water-flow Device
Gwinnett Water Resources Central Facility 684 Winder Highway, Lawrenceville, GA 30045 Main Panel: Honeywell E3 (Qty 2) Remote Panels: Honeywell E3 (Qty 2)
16 6 2 11 4 4
Gwinnett County Water Resources Lab 1510 One Water Way, Buford, GA 30519 Main Panel: Honeywell E3 (Qty 1) Remote Panel: Honeywell E3 (Qty 1)
8 68 8 8 0 0
BL127-21 PAGE 12
Fire and Emergency Services - Continued
Pull
Station Smoke Detector
Heat Detector
Duct Detector
Control Valves
Water-flow Device
Fire Station #1 165 Lawrenceville Street, Norcross, GA 30046 Panel: Silent Knight IFP-100
6 21 5 3 1 1
Fire Station #4 5550 Spalding Drive, Norcross, GA 30092 Panel: Audiosone Sigcom
7 10 2 0 1 1
Fire Station #5 3001 Old Norcross Road, Lawrenceville, GA 30096 Panel: Fire-Lite MS5210UD
6 32 0 7 1 1
Fire Station #6 3890 Johnson Drive, Lithonia, GA 30039 Panel: EST LSS4/12
6 21 0 4 1 1
Fire Station #7 3343 Bunten Road, Duluth, GA 30096 Panel: Fire-Lite MS5210UD
7 40 0 7 1 1
Fire Station #8 2295 Brannan Boulevard, Grayson, GA 30017 Panel: Silent Knight IFP-100
6 21 5 4 1 1
Fire Station #9 1890 Five Forks Trickum Road Lawrenceville, GA 30044 Panel: Fire-Lite MS5210UD
3 15 1 3 1 1
Fire Station #11 5885 Live Oak Parkway, Norcross, GA 30093 Panel: Simplex 4005
6 29 0 5 1 1
Fire Station #12 2815 Lenora Church Road, Snellville, GA 30078 Panel: Fire-Lite MS5210UD
6 38 0 7 1 1
Fire Station #13 343 Highway 23, Suwanee, GA 30024 Panel: Simplex 4004
4 10 4 2 1 1
Fire Station #18 1515 Mineral Springs Road, Hoschton, GA 30548 Panel: Fire-Lite*
8 17 11 6 1 1
Fire Station #19 3275 North Berkley Lake Road, Duluth, GA 30096 Panel: Simplex 4002
8 4 0 ? 1 1
Fire Station #20 1801 Cruse Road, Lawrenceville, GA 30044 Panel: Simplex 4002
6 4 0 12 1 1
Fire Station #21 470 Old Peachtree Road, Suwanee, GA 30024 Panel: EST LSS4/36
7 7 0 4 1 1
Fire Station #22 2180 Stone Drive, Lilburn, GA 30047 Panel: Fire-Lite*
7 6 0 6 1 1
Fire Station #23 4355 Steve Reynolds Boulevard, Norcross, GA 30093 Panel: Simplex 4005
4 25 0 4 1 1
Fire Station #24 2735 Mall of GA Boulevard, Buford, GA 30519 Panel: FCI 7100
5 37 0 7 1 1
Fire Station #25 3575 Lawrenceville Highway Lawrenceville, GA 30044 Panel: Fire-Lite MS5210UD
6 23 0 4 1 1
BL127-21 PAGE 13
Fire and Emergency Services - Continued
Pull
Station Smoke Detector
Heat Detector
Duct Detector
Control Valves
Water-flow Device
Fire Station #26 6075 Suwanee Dam Road, Sugar Hill, GA 30518 Panel: Silent Knight IFP-100
5 21 5 4 1 1
Fire Station #27 2825 Old Fountain Road, Dacula, GA 30019 Panel: Silent Knight IFP-100
6 21 5 4 1 1
Fire Station #28 3725 Rosebud Road, Loganville, GA 30052 Panel: Silent Knight IFP-100
6 19 6 3 1 1
Fire Station #29 2800 Thompson Mill Road, Buford, GA 30519 Panel: Fire-Lite*
6 19 7 3 1 1
Fire Station #30 1052 Ozora Road, Loganville, GA 30052 Panel: Silent Knight IFP-100
5 31 2 3 1 1
Fire Headquarters 408 Hurricane Shoals N.E., Lawrenceville, GA 30046 Panel: FCI 7100
6 18 12 18 1 1
Fire Logistical Support 450 Hosea Road, Lawrenceville, GA 30046 Panel: FCI 7100
1 21 0 2 1 1
Fire Technical Services 650 Swanson Drive, Lawrenceville, GA 30043 Panel: FCI 7100
5 1 0 1 1 1
Fire Training Academy Address: 3608 Braselton Highway Buford, GA 30019 Panel: Silent Knight Qty: 2
8 18 2 2 3 3
Police Services
Location Pull
Station Smoke Detector
Heat Detector
Duct Detector
Control Valves
Water-flow Device
Police Headquarters 770 Hi Hope Road, Lawrenceville, GA 30043 Panel: EST2
7 18 0 10 4 4
Police Annex 800 Hi Hope Road, Lawrenceville, GA 30043 Panel: EST3
9 5 7 8 1 1
Police Services – East Precinct 2273 Alcovy Road, Dacula, GA 30019 Panel: FCI IF602-252R
6 96 0 0 1 1
Police Services – West Precinct 6160 Crescent Drive, Norcross, GA 30071 Panel: Fire-Lite MS9200UD
5 4 0 0 1 1
Police Services – Central Precinct 3125 Satellite Boulevard, Duluth, GA 30096 Panel: EST2
5 0 0 8 1 1
Police Services – North Precinct 2735 Mall of Georgia Boulevard, Buford, GA 30519 Panel: FCI 7100
7 16 0 8 1 1
Police Services – South Precinct 2180 Stone Drive, Lilburn, GA 30047 Panel: Fire-Lite MS9200UDLS
8 18 0 4 1 1
Police Services –(Former Animal Control) 632 Hi Hope Road, Lawrenceville, GA 30043 Panel: Fire-Lite*
16 4 1 3 0 0
Police Services - Continued
BL127-21 PAGE 14
Pull
Station Smoke Detector
Heat Detector
Duct Detector
Control Valves
Water-flow Device
Police Services – Animal Welfare 884 Winder Highway, Lawrenceville, GA 30045 Panel: Fire-Lite MS9200UD
15 4 0 3 1 1
Police Services K9 Building 884 Winder Highway, Lawrenceville, GA 30045 Panel: Fire-Lite*
2 0 0 0 0 0
Police Services – Training 854 Winder Highway, Lawrenceville, GA 30045 Panel: Notifier NFS 640
9 4 0 3 1 1
Police Services – Firing Range 854 Winder Highway, Lawrenceville, GA 30045 Panel: Notifier NFS 640
12 131 0 14 1 1
Police Maintenance Bldg 854 Winder Highway, Lawrenceville, GA 30045 Panel: Notifier NFS 640
6 4 0 1 0 0
Parks and Recreation
Location Pull
Station Smoke Detector
Heat Detector
Duct Detector
Control Valves
Water-flow Device
Best Friend Park Recreation Center 6224 Jimmy Carter Boulevard, Norcross, GA 30071 Panel: FCI 7100
6 8 0 2 0 0
Bethesda Park Aquatic Center 225 Bethesda Church Road, Lawrenceville, GA 30044 Panel: Notifier AFP200
8 3 2 6 1 1
Bethesda Park Senior Center 225 Bethesda Church Road, Lawrenceville, GA 30044 Panel: Simplex Auto Call
12 3 0 6 1 1
Bogan Park Aquatic Center 2723 North Bogan Road, Buford, GA 30519 Panel: Fire-Lite MS9600UDLS
8 6 2 6 2 2
Collins Hill Park Aquatic Center 2225 Collins Hill Road, Lawrenceville, GA 30043 Panel: Fire-Lite MS9200UDLS
6 1 0 3 1 1
Dacula Park Activity Building 205 Dacula Road, Dacula, GA 30019 Panel: Ademco Vista 128FB*
8 12 3 6 2 1
George Pierce Park Recreation Center 55 Buford Highway, Suwanee, GA 30024 Panel: Edwards EST 2
10 21 4 2 1 1
Lenora Park Aquatic Center 4315 Lenora Church Road, Snellville, GA 30039 Panel: Ademco Vista 128FB*
6 3 1 6 0 0
Lenora Park Recreation Center 4515 Lenora Church Road, Snellville, GA 30039 Panel: FireLite MS9200UD*
8 12 3 6 0 0
Lucky Shoals Park Recreation Center 4651 Britt Road, Norcross, GA 30093 Panel: EST Quickstart
12 2 0 4 0 0
Mountain Park Aquatic Center 1063 Rockbridge Road, Stone Mountain, GA 30087 Panel: Notifier AFP 100
8 14 2 5 1 1
Mountain Park Activity Building 1063 Rockbridge Road, Stone Mountain, GA 30087 Panel: Notifier AFP 100
5 9 0 4 0 0
Parks and Recreation - Continued
BL127-21 PAGE 15
Pull
Station Smoke Detector
Heat Detector
Duct Detector
Control Valves
Water-flow Device
Pickneyville Park Recreation Center 4650 Peachtree Industrial Boulevard Norcross, GA 30071 Panel: Notifier AFP 200
9 14 1 2 1 1
Rhodes Jordan Park Recreation Center 100 East Crogan Street, Lawrenceville, GA 30046 Panel: Notifier NFS-320
11 1 4 14 1 1
Shorty Howell Park Activity Building 2750 Pleasant Hill Road, Duluth, GA 30096 Panel: Notifier AFP 100
7 1 0 8 1 1
West Gwinnett Park Aquatic Center 4488 Peachtree Industrial Boulevard Norcross, GA 30071 Panel: Notifier NFS 640
11 27 6 7 3 1
E. Service Requests
The Contractor will provide all repair and installation services in response to specific service requests made by the County Representative or designees of this representative. Service requests may be submitted by telephone, e-mail, or facsimile.
As described in more detail below, service request work exceeding $1,000 and special installation/replacement projects must be documented by the Contractor’s written proposals and the associated written authorizations of the County.
F. Availability and Response Time
The Contractor shall be available on a 24 hour/7day a week basis to respond to service requests and/or perform authorized work. The Contractor shall respond to all service requests in a timely manner. The County Representative will indicate if a service request is an emergency that needs prompt attention. In emergency situations the Contractor is expected to respond on site within three (3) hours. Standard service requests and special projects will be scheduled at times convenient for the County and Contractor, but typically the Contractor will be expected to start within two (2) days of the receipt of the service request or written authorization as applicable. Response time is a critical requirement of the Agreement, and the Contractor’s failure to adhere to this requirement may be considered non-performance.
G. Normal Business Hours/Overtime Rates
Normal business hours are defined as 8:00 AM to 5:00 PM, Monday through Friday, excluding County and Contractor’s holidays. The Contractor shall charge basic hourly rates for all work or services during normal business hours. The Contractor may charge overtime rates for all work or services outside of these normal business hours.
H. Basis of Compensation
Compensation to the Contractor for service request responses will be based on the hourly labor rates provided in the Bid for the Agreement, the actual cost of equipment, materials and parts plus a percentage markup indicated in the same Bid (but not to exceed 10%), and a fixed trip charge when applicable. Hours shall be calculated daily from the time the Contractor’s personnel arrives at a service location until that personnel leaves the site. Travel time to and from the location will not be compensated, and travel time away from the service location will not be compensated on an hourly basis.
However, one service call charge of a fixed amount may be added to a service request to cover all travel time, including time away from the service site to pick up parts or materials. Overtime labor rates may be charged for time outside of the normal business hours as specified in the Bid. Emergency labor rates may be charged for services provided on an emergency basis. Equipment, materials, and parts must be itemized and billed at actual cost plus the pre-determined markup. The Contractor also agrees that it will provide documentation of costs for parts and materials upon request of the County. Subcontractor services, when authorized by the County, shall be billed at cost plus the same mark-up utilized for parts and materials. Sub-contractor costs must be documented.
I. Limitation on Utilization of Personnel
The Contractor will typically be expected to utilize one technician for a routine service call. If the Contractor anticipates
BL127-21 PAGE 16
using more than one technician for the service, it shall obtain prior approval from the County Representative prior to committing to the use of the additional staff. The County will withhold payment for any invoice reflecting multiple staff, where this support did not have prior approval. Staff utilization on larger scale services with written authorization from the County shall reflect the staffing levels in the Contractor’s approved proposal.
J. Services in Excess of $1,000.00
If the Contractor expects a service to exceed $1,000.00, the Contractor shall contact the County Representative prior to initiating the service and shall provide a written estimate of the costs. This estimate shall include a detailed listing of expected labor costs by personnel classification, rate, and hours; an itemized description of required equipment and parts and their costs; and a schedule for when the work can be performed. This estimate must be approved in writing by the County Representative and the written authorization must be retained and submitted by the Contractor to the County with the final Contractor Service Report.
K. Special Installation/Replacement Projects
The County may on occasion require that the Contractor participate in projects involving the expansion of existing fire alarm systems and the installation of new fire alarm systems utilizing the types of equipment described within this procurement. In such cases, the County Representative will provide a scope of services for said project and solicit a written cost proposal and schedule from the Contractor. The Contractor shall prepare its proposal based on the unit costs and other terms of the Agreement. The County has no projection of the number and magnitude of such project level work, and will solicit such work from the Contractor only if it is in its best interest in terms of cost, schedule, and convenience.
L. Sub-Contractors
The Contractor shall be prepared to perform all of the services called for under this Agreement with its own forces, and its Bid should reflect this approach. Nevertheless, the County, on occasion, may require the Contractor to utilize specialty sub-contractors when the Contractor does not have the in-house expertise. In such cases, the County Representative shall approve such sub-contractors before they are utilized. Sub-contractor expenses shall be billed as “reimbursables” at the documented actual costs plus the Contractor’s pre-determined mark-up for parts/materials.
M. County Representative
In administration of the services under this Price Agreement, the County will be represented by its Department of Support Services/Facilities Management Electrical Supervisor, who is referenced as the County Representative. The role and primary responsibilities of the County Representative are noted in other paragraphs through descriptions of his relationship to the Contractor. The County Representative may designate other personnel to provide the service directions or decisions described herein.
II. PERFORMANCE STANDARDS AND QUALITY ASSURANCE
A. Applicable Industry Standards
All repairs and installations shall be completed in a neat and workmanlike manner and in accordance with the applicable codes and standards of the authorities having jurisdiction. Equipment, materials, and parts supplied shall be new of a quality conforming to current engineering and manufacturing standards, free of defects, and suitable for the intended service. When applicable, repair and installation activities and procedures shall comply with the standard operational and maintenance requirements of the manufacturers of the equipment or parts.
B. Protection, Cleaning and Restoration of Work Sites
Contractor shall keep work sites clean and free of debris. When providing services, Contractor shall maintain a level of
BL127-21 PAGE 17
cleanliness and neatness needed for proper execution of the work. Contractor shall keep newly installed work clean and protect it from damage. When services are complete, Contractor shall clean the work site, in all areas disturbed by its activities, of rubbish, waste material and litter; remove all tools, equipment and surplus materials from the site, and remove any temporary protection and facilities installed during its services. Any surfaces and/or finishes that are damaged by Contractor’s work shall be patched, repaired, and repainted to match surrounding area. Contractor also shall take precautions to protect trees, shrubbery, and sod at its service locations. Where such items are inadvertently destroyed or damaged, Contractor shall replace or restore at its cost.
C. Waste Disposal
Contractor shall dispose of all waste promptly and shall comply with government regulations and other legal requirements when doing so. The Contractor shall not dispose of volatile wastes, such as cleaning compounds, primers, and solvents, in storm or sanitary drains, on pavements or in gutters, or in a manner that will contaminate soils or be harmful to plant life at the service location.
D. Safety Precautions and Requirements
1. Contractor shall take precautions to prevent fires and facilitate fire-fighting operations. Contractor shall store flammable materials in non-combustible containers and store away from fire sources and shall remove flammable waste regularly from the work site. Contractor also shall carefully supervise operation of potential fire sources such as cutting and welding.
2. Contractor shall take precautions to prevent accidents due to physical hazards. Contractor shall provide barricades and signs as required to protect Contractor’s personnel and public from hazards and to inform them thereof. Barricades and warning signs shall comply with safety regulations.
3. Contractor shall provide and require use of safety equipment, clothing, and accessories as required by its work activities and safety regulations.
E. Warranties
The Contractor shall warrant against failure of all materials and workmanship associated with its service request work for one (1) year after the date of acceptance of such work by the County. If any of the work is found defective or not in accordance with the service request or applicable codes and standards, the Contractor shall correct warranted work promptly, at no cost to the County, after receipt of a written notice from the County to do so.
Contractor shall provide the County Representative copies of the standard manufacturer’s warranties for any new equipment and parts purchased and installed by the Contractor. The Contractor shall provide this warranty information with its Service Report whenever applicable.
III. REPORTS AND INVOICING
A. Inspection, Testing, and Maintenance Reports
After a facility has been inspected, tested, or maintenance work performed a detailed report shall be emailed to the County Representative within seven business days. These reports shall satisfy the requirements of the NFPA, and the authority having jurisdiction and shall include the following information:
1. Date
2. Test, inspection, or maintenance frequency
3. Name of property
4. Address
5. Name of person performing inspection, maintenance, or test or combination thereof, and affiliation, business address, and telephone number
6. Name, address, and representative of approving agency(ies)
7. Designation of the detector(s) tested, inspected, or maintained
BL127-21 PAGE 18
8. Functional test of detectors
9. Functional test of required sequence of operations
10. Check of all smoke detectors
11. Loop resistance for all fixed-temperature, line-type heat detectors
12. Other tests, inspections, or maintenance as required by equipment manufacturers
13. Other tests, inspections, or maintenance as required by the authority having jurisdiction
14. Signatures of tester and approved authority representative
15. Disposition of problems identified during test, inspection, or maintenance
B. Service Report Requirements
Each completed Service Request shall be documented by a Contractor Service Report. The format of the Contractor Service Report shall be developed at the beginning of the Price Agreement period and shall be acceptable to the Contractor and County Representative. The Contractor Service Report shall include, at a minimum, the following information:
- Request for Bid number
- County Purchase Order Number
- Service Request Tracking Number (Original Service Request with Signed Authorization also shall be attached).
- Location of Services - - Facility Name/Address
- Description of Repairs, Services, or Installation Preformed
- Personnel Utilized and Hours of Service - - This section shall clearly indicate for each day of service the individuals assigned, the labor rates, the hours worked and the labor subtotals and totals
- Parts, Materials and Equipment Utilized - - Descriptions, quantities, costs, applicable mark-ups, and subtotals and total
- Trip Charges
- Summary of Costs
In particular, for service work associated with the correction of deficiency items identified through inspections/tests, the Contractor’s service report should clearly identify the items being corrected and the operational state of the fire alarm system after the repairs are complete.
The Contractor shall submit the Service Report within 24 hours of the completion of the services for standard smaller scale jobs, and within seven (7) calendar days for services costing more than $1,000. The Service Reports shall be submitted by e-mail or facsimile to the County Representative. The County Representative will review the Service Report and notify the Contractor within 5 calendar days if there are any questions or concerns regarding the services or costs. The County Representative will provide written approval of Service Reports. Acceptable Contractor Service Reports will serve as the basis for the Contractor’s invoicing.
C. Invoicing Procedure
The Contractor shall invoice for weekly inspection, testing, and maintenance services on a monthly basis in a fixed amount equal to the annual amount of the weekly services provided in its Bid Schedule divided by twelve.
There shall be 50 weekly inspections in a one-year period.
The Contractor shall invoice for semiannual inspection, testing, and maintenance services on a semiannual basis in a fixed amount equal to the annual amount of the semiannual services provided in its Bid Schedule.
There shall be one semiannual service in a one-year period.
The Contractor shall invoice for annual inspection, testing, and maintenance services on an annual basis in a fixed amount equal to the annual amount of the services provided on its Bid Schedule. There shall be one annual service in a one-year period.
The invoices shall include the applicable assigned purchase order number and shall be submitted to the Gwinnett County Department of Financial Services, Treasury Division, 75 Langley Drive, Lawrenceville, Georgia 30046. The Contractor shall insure that it has submitted all related reports to the County Representative for
BL127-21 PAGE 19
the time frame being invoiced.
For Repair and Installation Services the Contractor shall invoice the County for each Service Request only after there is confirmation that the information provided is acceptable to the County. If changes are required by the County, this final invoice should reflect those modifications. The Contractor shall submit its invoices to the Gwinnett County Department of Financial Services, Treasury Division, 75 Langley Drive, Lawrenceville, Georgia 30046.
Invoices shall include the applicable Purchase Order Number and the Service Request Tracking Number and shall be formatted according to terms and rates in the Agreement. The total monetary amount on the invoice and Service Report shall correspond, and the Service Report should be attached to the invoice. It is very important that this information be complete and correct.
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — | |
| BL127-21 ADD2 | — | |
| BL127-21 ADD1 | — | |
| BL127-21 ADD3 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .