About this file

This is an Addendum document (ADD1) related to a state and local contract opportunity in Georgia for the FWHWRC and YRWRF Primary Clarifier Rehabilitation project. The pre-bid consists of work at two different locations, with a bid opening scheduled for June 30, 2022, no later than 2:50 PM with time-stamped submissions required. The project involves rehabilitation services at two water resource facilities, though specific quantities, detailed scope elements, site visit requirements, and any bidder's meetings are not detailed in the provided addendum reference material.

The addendum does not specify pricing terms, set-asides, incumbent contractors, funding sources, or budget amounts in the information provided. Additional details regarding contract term, renewal options, and other salient financial or contractual conditions would be contained within the complete addendum document itself.

Text of this file

FWHWRC and YRWRF Primary Clarifier Rehabilitation

ADDENDUM NO. 1

Addendum Date June 10, 2022

Bid Number BL071-22

ADDENDUM MUST BE SIGNED AND INCLUDED IN YOUR BID SUBMITTAL

BL071-22 ADDENDUM NO. 1

JUNE 10, 2022 PAGE 1

PART 1 – REVISIONS TO THE PROJECT MANUAL

The following REVISIONS shall be incorporated into the PROJECT MANUAL for the above-referenced project:

1. Notice of Bid, Instructions to Bidders, Bid Form, Bidder’s Affidavit, and Form of

Non-Collusion Affidavit, revise as shown below:

a. BID DATE: June 30, 2022 July 14, 2022

2. Volumes 1 & 2 Cover Pages and Professional Engineer Certifications Page, revise as shown below:

a. GCDWR PROJECT NO. M-1190-19 & M-1191-18 M-1191-08

3. Supplementary Conditions SC-4.02-D-10, revise as shown below:

a. Report dated 2022, of Yellow River Water Reclamation Facility prepared b

Hazen and Sawyer, entitled: “YRWRF Primary Clarifier Inspection Report”, consisting of 38 49 pages.

All other terms and conditions of the PROJECT MANUAL remain unchanged.

PART 2 – REVISIONS TO THE DRAWINGS

1. None.

FWHWRC and YRWRF Primary Clarifier Rehabilitation

ADDENDUM NO. 1

Addendum Date June 10, 2022

Bid Number BL071-22

ADDENDUM MUST BE SIGNED AND INCLUDED IN YOUR BID SUBMITTAL

BL071-22 ADDENDUM NO. 1

JUNE 10, 2022 PAGE 2

PART 3 – QUESTIONS AND ANSWERS

The following QUESTIONS and ANSWERS shall be incorporated into the PROJECT MANUAL for the above-referenced project:

Q1: Is there an estimate for this project?

A1: Gwinnett County estimates this project to be approximately $15 million.

Q2: Please provide drawings and reports of physical conditions referenced in

Supplementary Conditions SC-4.02-D.

A2: These documents can be downloaded from Quest CDN. From the Quest CDN

‘Project’ page, click ‘Q & A’ button to display available documents. Contact Eddie

McCallum at emccallum@hazenandsawyer.com if additional assistance is required with accessing these drawings and reports of physical conditions.

PART 4 – ATTACHMENTS

A. None.

Acknowledgment of receipt of this addendum must be signed and included in your bid submittal.

Company Name

Signature

Date mailto:emccallum@hazenandsawyer.com

Other files

File Type Posted
BL071-22 ADD2 —
Award Information —
BL071-22 ADD4 —
BL071-22 ADD3 —
BL071-22 Notice —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .