This is Addendum #3 to solicitation BL022-23 issued by Gwinnett County Board of Commissioners for the provision of epoxy floor replacement services on an annual contract basis. The solicitation requests contractor services for epoxy floor replacement work to be performed as needed throughout the county, with project quantities and scope varying based on county requirements. The original bid opening date was moved to March 17, 2023. The contract is structured as an annual agreement with pricing based on square footage, with the contractor expected to provide services for areas that will typically be smaller than 10,000 square feet, though the 10,000 square foot pricing rate will be maintained for smaller projects.

Bidders are not required to submit bid bonds, payment bonds, or performance bonds. All costs associated with the service, including removal of existing epoxy flooring, concrete grinding around floor drains, slope correction, drain resetting, and equipment necessary to maintain proper application temperature conditions, must be incorporated into the line item pricing on the bid schedule. The contractor is responsible for providing all necessary equipment and materials to ensure proper application results, with consideration given to varying jobsite conditions across county facilities, some of which are climate-controlled by HVAC systems while others have limited environmental controls. Submission of bids must occur no later than 2:50 p.m. on the due date, with physical submittals only accepted; firms on the Gwinnett County ineligible source list are prohibited from submitting bids. Addendum #3 must be signed and returned with the bid to ensure bid responsiveness.

Text of this file

March 9, 2023

Addendum #3

BL022-23

Provision of Epoxy Floor Replacement on an Annual Contract

**The opening date has been moved to March 17, 2023.**

Please see the below summation of questions and answers for the above solicitation.

Questions:

Q1. Are bid bonds required?

A1. No.

Q2. Are payment and performance bonds required?

A2. No.

Q3. How will cost of removing epoxy floor be determined?

A3. With the title of the solicitation being “Provision of Epoxy Floor Replacement on an

Annual Contract”, cost of existing floor removal must be built in to line item pricing on the Bid Schedule.

Q4: Will square foot pricing at 10,000 sq. ft. be held for small projects?

A4: Yes. Most of the jobs will be for areas smaller than 10,000 sq. ft. This contract is to be used as needed; quantities will vary depending on the County’s needs.

Q5: Regarding Page 3, paragraph F: (“If necessary, concrete around floor drains shall be ground down for positive slope and the drains reset. The top of drains must be even with surrounding edge of finished flooring.”) how with the cost of this service be determined?

A5: See A3. This cost should be factored in to line item pricing.

Q6: Regarding Page 3, Section VIII Installation, Paragraph B: is contractor responsible for maintaining and providing equipment for maintaining application process temperature? If so, how will this cost be determined?

A6: See A5. Contractor should provide the necessary equipment to maintain and provide the best result for the application. For certain County departments, the jobsites/facilities are mostly indoors controlled by HVAC. Some facilities’ bay rooms have heat, but no air conditioning.

BL022-23 ADD #3 Page 2

This addendum should be signed in the space provided below and returned with your bid.

Failure to do so may result in your bid being deemed non-responsive.

Thank you, Casey Beauston Purchasing Associate II

Company Name

Authorized Representative

REFERENCES
STANDARD INSURANCE REQUIREMENTS
Buyer Initials: TS
II. DELIVERY
III. EXPLANATION TO BIDDERS
IV. SUBMISSION OF BIDS
V. WITHDRAWAL OF BID DUE TO ERRORS
VI. TESTING AND INSPECTION
VII. F.O.B. POINT
VIII. PATENT INDEMNITY
IX. BID BONDS AND PAYMENT AND PERFORMANCE BONDS
X. DISCOUNTS
XI. AWARD
XII. DELIVERY FAILURES
XIII. COUNTY FURNISHED PROPERTY
XIV. REJECTION AND WITHDRAWAL OF BIDS
XVII. CONTRACT
XVI. NON-COLLUSION
XVII. DEFAULT
XVIII. TERMINATION FOR CAUSE
XIX. TERMINATION FOR CONVENIENCE
XX. DISPUTES
XXI. SUBSTITUTIONS
XXII. INELIGIBLE BIDDERS
XXIII. OCCUPATION TAX CERTIFICATE
XXIV. PURCHASING POLICY AND REVIEW COMMITTEE
XXV. AMERICANS WITH DISABILITIES ACT
XXVI. ALTERATIONS OF SOLICITATION AND ASSOCIATED DOCUMENTS
XXVII. TAX LIABILITY
XVIII. STATE LAW REGARDING WORKER VERIFICATION
XXIX. SOLID WASTE ORDINANCE
XXX. GENERAL CONTRACTORS LICENSE
XXXI. INDEMNIFICATION
XXXII. CODE OF ETHICS:
XXXIII. PENDING LITIGATION:
XXXIV. ELECTRONIC PAYMENT
DIRECTIONS TO GJAC BUILDING FROM I-85

Other files

File Type Posted
Award Information —
BL022-23 Addendum #2 —
BL022-23 Addendum #1 —
BL022-23 Invitation to Bid —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .