About this file
This is an addendum to solicitation BL022-23 issued by Gwinnett County Board of Commissioners for the provision of epoxy floor replacement services on an annual contract basis. The addendum postpones the bid opening date to March 8, 2023, and clarifies specifications for the flooring work. The County expects epoxy floor replacement services across multiple facility types, including bay floors with drains, bathrooms, hallways, and other areas. Specific facility plans will be provided by the County upon request and prior to project commencement. Contractors may schedule site visits to evaluate the facilities and existing concrete floor conditions. The work does not include removal or replacement of toilet fixtures, partitions, or thresholds. Contractors should note that bathroom and bay floor work will involve floor drains.
The addendum provides critical pricing clarification regarding bid schedule item #4, which specifies a double broadcast ceramic carpet #400 quartz flooring system. Contractors are instructed to price only the quartz cost on this line item, as items #2, #3, and #5 separately account for primer, first coat, second coat, grout coat, and seal coat expenses. All bids must be submitted by 2:50 p.m. on the due date, and bidders must sign and return the addendum with their bid submission or risk having their bid deemed non-responsive. Gwinnett County does not accept electronic submittals for formal solicitations, and firms on the County's ineligible source list are prohibited from submitting bids.
Text of this file
March 2, 2023
Addendum #1
BL022-23
Provision of Epoxy Floor Replacement on an Annual Contract
**The opening date has been postponed to March 8, 2023.**
Please see the below summation of questions and answers for the above solicitation.
Questions:
Q1. Where can contractors access/find the plans for this solicitation?
A1. Specific facility plans may be provided by the County upon request and/or prior to a project starting.
Q2. Are floor drains involved?
A2. Some facilities have bay floors with drains. Bathrooms will have drains as well.
Q3. In what areas is the County expecting to need service?
A3. Expected areas of service include but are not limited to bay floors, bathrooms, hallways, etc.
Q4: What is the existing floor material(s)?
A4: Concrete.
Q5: Can contractors arrange a site visit to see what types of floors need replacing, further evaluate the sites, etc.?
A5: Yes, site visits can be scheduled.
Q6: If bathrooms need work, is the contractor responsible for removing and replacing toilets fixtures and/or partitions?
A6: No.
Q7: Will the contractor be replacing any thresholds?
A7: No.
Q8: On Page 4, Paragraph C.5, the solicitation states this is to be a double broadcast Ceramic
Carpet #400 Quartz. On Page 6, bid schedule item #4 does not state this for pricing. Is this to be a double broadcast system?
A8: This is to be the double broadcast system.
BL022-23 ADD #1 Page 2
Q9: Page 6 Bid Schedule, Line Item #4 states ceramic carpet #400 Quartz broadcast Flooring System. By using the word “system,” is it meant to include all 5 coating systems based on the Sherwin Williams System Guide of primer, 1st coat/broadcast, 2nd coat/broadcast, grout coat, seal coat? Or do we just price out the quartz cost on this line item since items #2, #3 & #5 include cost of primer, 1st coat, 2nd coat, grout coat and seal coat?
A9: Quartz cost for this line item.
This addendum should be signed in the space provided below and returned with your bid.
Failure to do so may result in your bid being deemed non-responsive.
Thank you, Casey Beauston Purchasing Associate II
Company Name
Authorized Representative
| REFERENCES |
| STANDARD INSURANCE REQUIREMENTS |
| Buyer Initials: TS |
| II. DELIVERY |
| III. EXPLANATION TO BIDDERS |
| IV. SUBMISSION OF BIDS |
| V. WITHDRAWAL OF BID DUE TO ERRORS |
| VI. TESTING AND INSPECTION |
| VII. F.O.B. POINT |
| VIII. PATENT INDEMNITY |
| IX. BID BONDS AND PAYMENT AND PERFORMANCE BONDS |
| X. DISCOUNTS |
| XI. AWARD |
| XII. DELIVERY FAILURES |
| XIII. COUNTY FURNISHED PROPERTY |
| XIV. REJECTION AND WITHDRAWAL OF BIDS |
| XVII. CONTRACT |
| XVI. NON-COLLUSION |
| XVII. DEFAULT |
| XVIII. TERMINATION FOR CAUSE |
| XIX. TERMINATION FOR CONVENIENCE |
| XX. DISPUTES |
| XXI. SUBSTITUTIONS |
| XXII. INELIGIBLE BIDDERS |
| XXIII. OCCUPATION TAX CERTIFICATE |
| XXIV. PURCHASING POLICY AND REVIEW COMMITTEE |
| XXV. AMERICANS WITH DISABILITIES ACT |
| XXVI. ALTERATIONS OF SOLICITATION AND ASSOCIATED DOCUMENTS |
| XXVII. TAX LIABILITY |
| XVIII. STATE LAW REGARDING WORKER VERIFICATION |
| XXIX. SOLID WASTE ORDINANCE |
| XXX. GENERAL CONTRACTORS LICENSE |
| XXXI. INDEMNIFICATION |
| XXXII. CODE OF ETHICS: |
| XXXIII. PENDING LITIGATION: |
| XXXIV. ELECTRONIC PAYMENT |
| DIRECTIONS TO GJAC BUILDING FROM I-85 |
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — | |
| BL022-23 Addendum #2 | — | |
| BL022-23 Invitation to Bid | — | |
| BL022-23 Addendum #3 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .