This is an addendum to solicitation BL022-23 issued by Gwinnett County Board of Commissioners for the provision of epoxy floor replacement services on an annual contract basis. The addendum postpones the bid opening date to March 8, 2023, and clarifies specifications for the flooring work. The County expects epoxy floor replacement services across multiple facility types, including bay floors with drains, bathrooms, hallways, and other areas. Specific facility plans will be provided by the County upon request and prior to project commencement. Contractors may schedule site visits to evaluate the facilities and existing concrete floor conditions. The work does not include removal or replacement of toilet fixtures, partitions, or thresholds. Contractors should note that bathroom and bay floor work will involve floor drains.

The addendum provides critical pricing clarification regarding bid schedule item #4, which specifies a double broadcast ceramic carpet #400 quartz flooring system. Contractors are instructed to price only the quartz cost on this line item, as items #2, #3, and #5 separately account for primer, first coat, second coat, grout coat, and seal coat expenses. All bids must be submitted by 2:50 p.m. on the due date, and bidders must sign and return the addendum with their bid submission or risk having their bid deemed non-responsive. Gwinnett County does not accept electronic submittals for formal solicitations, and firms on the County's ineligible source list are prohibited from submitting bids.

Text of this file

March 2, 2023

Addendum #1

BL022-23

Provision of Epoxy Floor Replacement on an Annual Contract

**The opening date has been postponed to March 8, 2023.**

Please see the below summation of questions and answers for the above solicitation.

Questions:

Q1. Where can contractors access/find the plans for this solicitation?

A1. Specific facility plans may be provided by the County upon request and/or prior to a project starting.

Q2. Are floor drains involved?

A2. Some facilities have bay floors with drains. Bathrooms will have drains as well.

Q3. In what areas is the County expecting to need service?

A3. Expected areas of service include but are not limited to bay floors, bathrooms, hallways, etc.

Q4: What is the existing floor material(s)?

A4: Concrete.

Q5: Can contractors arrange a site visit to see what types of floors need replacing, further evaluate the sites, etc.?

A5: Yes, site visits can be scheduled.

Q6: If bathrooms need work, is the contractor responsible for removing and replacing toilets fixtures and/or partitions?

A6: No.

Q7: Will the contractor be replacing any thresholds?

A7: No.

Q8: On Page 4, Paragraph C.5, the solicitation states this is to be a double broadcast Ceramic

Carpet #400 Quartz. On Page 6, bid schedule item #4 does not state this for pricing. Is this to be a double broadcast system?

A8: This is to be the double broadcast system.

BL022-23 ADD #1 Page 2

Q9: Page 6 Bid Schedule, Line Item #4 states ceramic carpet #400 Quartz broadcast Flooring System. By using the word “system,” is it meant to include all 5 coating systems based on the Sherwin Williams System Guide of primer, 1st coat/broadcast, 2nd coat/broadcast, grout coat, seal coat? Or do we just price out the quartz cost on this line item since items #2, #3 & #5 include cost of primer, 1st coat, 2nd coat, grout coat and seal coat?

A9: Quartz cost for this line item.

This addendum should be signed in the space provided below and returned with your bid.

Failure to do so may result in your bid being deemed non-responsive.

Thank you, Casey Beauston Purchasing Associate II

Company Name

Authorized Representative

REFERENCES
STANDARD INSURANCE REQUIREMENTS
Buyer Initials: TS
II. DELIVERY
III. EXPLANATION TO BIDDERS
IV. SUBMISSION OF BIDS
V. WITHDRAWAL OF BID DUE TO ERRORS
VI. TESTING AND INSPECTION
VII. F.O.B. POINT
VIII. PATENT INDEMNITY
IX. BID BONDS AND PAYMENT AND PERFORMANCE BONDS
X. DISCOUNTS
XI. AWARD
XII. DELIVERY FAILURES
XIII. COUNTY FURNISHED PROPERTY
XIV. REJECTION AND WITHDRAWAL OF BIDS
XVII. CONTRACT
XVI. NON-COLLUSION
XVII. DEFAULT
XVIII. TERMINATION FOR CAUSE
XIX. TERMINATION FOR CONVENIENCE
XX. DISPUTES
XXI. SUBSTITUTIONS
XXII. INELIGIBLE BIDDERS
XXIII. OCCUPATION TAX CERTIFICATE
XXIV. PURCHASING POLICY AND REVIEW COMMITTEE
XXV. AMERICANS WITH DISABILITIES ACT
XXVI. ALTERATIONS OF SOLICITATION AND ASSOCIATED DOCUMENTS
XXVII. TAX LIABILITY
XVIII. STATE LAW REGARDING WORKER VERIFICATION
XXIX. SOLID WASTE ORDINANCE
XXX. GENERAL CONTRACTORS LICENSE
XXXI. INDEMNIFICATION
XXXII. CODE OF ETHICS:
XXXIII. PENDING LITIGATION:
XXXIV. ELECTRONIC PAYMENT
DIRECTIONS TO GJAC BUILDING FROM I-85

Other files

File Type Posted
Award Information —
BL022-23 Addendum #2 —
BL022-23 Invitation to Bid —
BL022-23 Addendum #3 —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .