This document is a mechanical design sheet and drawing legend for the James F. Battin Courthouse and Federal Building in Billings, Montana. It serves as a comprehensive reference guide for HVAC, plumbing, and mechanical systems documentation.
The sheet (M-001) establishes design standards and specifications for all mechanical work, including compliance with the 2021 International Mechanical Code, 2021 International Plumbing Code, and ANSI/ASHRAE standards 62.1-2019 and 90.1-2019. Design conditions are based on Billings Logan International Airport weather data (elevation 3,570 feet, winter design -11.6°F, summer design 94.9°F dry bulb). The document includes extensive symbol legends for HVAC equipment (chillers, boilers, fans, VAV boxes, cooling towers), piping systems (chilled water, condenser water, heating water, refrigerant), ductwork classifications, and mechanical control devices. Key requirements specify that all mechanical work be performed by licensed contractors; all equipment meet specified manufacturer models or approved equals; ductwork be sealed per SMACNA standards; flexible ducts be limited to 6 feet maximum length with fire-rated materials; and all systems undergo commissioning, testing, adjusting, and balancing (TAB) certification. The piping insulation schedule prescribes minimum R-values based on fluid operating temperature ranges and nominal pipe sizes. General notes require coordination with the General Contractor, verification of existing conditions, compliance with local codes, equipment warranties for one year post-acceptance, and submission of shop drawings, operational manuals, and product documentation to the owner upon project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CO2
CO
H
HS
NO2
S
TH
TS
T
MS
C
LT
CHWS
DV-E
CWR
CWS
HWR
HWS
EQ
CHWR CHILLED WATER RETURN
CHILLED WATER SUPPLY
DIRECT VENT - EXHAUST
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
HEATING WATER RETURN
HEATING WATER SUPPLY
DIRECT VENT - INTAKE
REF-L
REF-S
REFRIGERANT-LIQUID
REFRIGERANT-SUCTION
CAP
REF-HG REFRIGERANT-HOT GAS
PLUMBING AND PIPING SYMBOLS
KEYNOTE
CONTINUATION SYMBOL
NUMBER OF SHEET WHERE DETAIL APPEARS
NUMBER OF DETAIL ON SHEET
REVISION NUMBER - SHOWN ON PLANS
GENERAL DRAWING SYMBOLS
ROOM NAME AND NUMBER
POINT WHERE NEW CONNECTS TO EXISTING
ITEM TO BE DEMOLISHED
AREA NOT IN CONTRACT
PIPE RISE
PIPE DROP
PIPE TEE
* NOTE *
THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET
MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.
Room
16"x8"
16"/8"
(E)
B
D
C
16"Ø
E/A
O/A
T/A
L/A
R/A
S/A
EXHAUST AIR
OUTSIDE AIR
RELIEF AIR
RETURN AIR
SUPPLY AIR
TRANSFER AIR
GRILLES, REGISTERS & DIFFUSERS TAG
CFM
THROW-150FPM/ 100FPM/ 50FPM
NECK SIZE / MODULE SIZE
EXISTING DUCT TAG
OVAL DUCT SIZE TAG
(WIDTH / HEIGHT)
SQUARE DUCT SIZE TAG
(WIDTH x HEIGHT)
HVAC SYMBOLS
RECTANGULAR
SUPPLY/OUTSIDE AIR DUCT RISE
RECTANGULAR
RETURN/TRANSFER AIR DUCT RISE
MECHANICAL EQUIPMENT TAGS
ROUND DUCT SIZE TAG
(DIAMETER)
LINEAR DIFFUSER TAG
CFM
TYPE (SEE SCHEDULE) NUMBER OF SLOTS /
ACTIVE SLOT LENGTH (PLENUM LENGTH) /
NECK SIZE
DUCT BEING
DEMOLISHED
ELEVATION (CENTER OF FACE)
ROUND SUPPLY/OUTSIDE
AIR DUCT RISE
ROUND RETURN/TRANSFER
AIR DUCT RISE
RECTANGULAR EXHAUST/RELIEF
AIR DUCT RISE
ROUND EXHAUST/RELIEF
AIR DUCT RISE
DROP
DROP
DROP
DROP
DROP
DROP
G-E/A GREASE EXHAUST AIR
S-E/A SMOKE EXHAUST AIR
EQUIPMENT BY OTHERS
(REFER TO OTHER DISCIPLINE
FOR ADDITIONAL INFORMATION)
EXISTING EQUIPMENT
TO REMAIN
FLUE EXHAUST GAS FLUE
C/A COMBUSTION AIR
S-O/A CONDITIONED OUTSIDE AIR
Ø ROUND
ABV ABOVE
AC AIR CONDITIONING
AD AREA DRAIN
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL UTILIZATION EFFICIENCY
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BLW BELOW
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CAP CAPACITY
CB CATCH BASIN
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEAN OUT
CW COLD WATER
D DEGREE
DB DRY BULB
DIA DIAMETER
DN DOWN
DW DISTILLED WATER
EA EACH
EAT ENTERING AIR TEMPERATURE
ELEC ELECTRICAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
E/A EXHAUST AIR
EXIST EXISTING
F DEGREES FAHRENHEIT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FD FIRE DAMPER
FDV FIRE DEPARTMENT VALVE
FL FLOOR
FO FUEL OIL
FOV FUEL OIL VENT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FS FLOOR SINK
FT FOOT/FEET
FTR FIN TUBE RADIATION
GAL GALLON
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GW GREASE WASTE
HB HOSE BIB
HP HORSE POWER
HTG HEATING
HTR HEATER
HW HOT WATER
HYD HYDRANT
ID INDIRECT
IN INCH
INV INVERT
LB POUND
LB/HR POUNDS PER HOUR
LAT LEAVING AIR TEMPERATURE
LP LOW PRESSURE
LPG LIQUEFIED PETROLEUM GAS
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M/A MIXED AIR
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
MCF ONE THOUSAND CUBIC FEET
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
MU/A MAKE-UP/AIR
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NUMBER
NO NORMALLY OPEN
NTS NOT TO SCALE
O OXYGEN
O/A OUTSIDE AIR
ORD OVERFLOW ROOF DRAIN
PD PRESSURE DROP
PIV POST INDICATOR VALVE
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PWR POWER
R DUCT RISER
R/A RETURN AIR
RCP RADIANT CEILING PANEL
RD ROOF DRAIN
REC RECESSED
RED REDUCER
RH RELATIVE HUMIDITY
RL/A RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
RW RAIN WATER
SF SQUARE FOOT
S/A SUPPLY AIR
SAN SANITARY
SF SQUARE FOOT
SD SMOKE DAMPER
SM SURFACE MOUNT
SP STANDPIPE
SP STATIC PRESSURE
STM STEAM
T THERMOSTAT
TD TEMPERATURE DROP
TDR TRENCH DRAIN
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
V VENT
VAV VARIABLE AIR VOLUME
VENT VENTILATION
VTR VENT THROUGH ROOF
W WASTE
WB WET BULB
WCO WALL CLEAN OUT
WH WALL HYDRANT
AC AIR CONDITIONING UNIT
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
BP BOILER PUMP
CC COOLING COIL
CH CHILLER
CT COOLING TOWER
CU CONDENSING UNIT
CWP CONDENSER WATER PUMP
CHWP CHILLED WATER PUMP
DBP DOMESTIC WATER BOOSTER PUMP
DCP DOMESTIC WATER CIRCULATING PUMP
DF DUCT FURNACE
DH DUCT HEATER
EF EXHAUST FAN
EH ELECTRIC HEATER
ERV ENERGY RECOVERY VENTILATOR
ET EXPANSION TANK
F FURNACE
FC FAN COIL
FP FIRE PUMP
GI GREASE INTERCEPTOR
GRV GRAVITY ROOF VENTILATOR
HP HEAT PUMP
HS HYDRAULIC SEPARATOR
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
HRV HEAT RECOVERY VENTILATOR
MAU MAKE-UP AIR UNIT
P PUMP
RF RETURN FAN
RTU ROOF TOP UNIT
SD SLIM DUCT
SEP SEWAGE EJECTOR PUMP
SF SUPPLY FAN
SP SUMP PUMP
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
WH WATER HEATER
WM WALL MOUNT
EQUIPMENT ABBREVIATIONS
48"x2 1/2"
400LS-1
8"x8"/24"x24" 300*S-1
400* 12"Ø/---
S-1
LINEAR BAR GRILLE
LINEAR SLOT DIFFUSER
PERFORATED DIFFUSER
WITH DEFLECTORS
ROUND DIFFUSER WITH
ADJUSTABLE PATTERNS
LOUVERED DOUBLE
DEFLECTION GRILLE
12"x10"/---
500S-2
TYPE (SEE SCHEDULE)
10"Ø/24"x24" H-5/7/1422
400*S-2
3-CONE DIFFUSER
THROW PATTERN
MAX NC RATING
1 / 4' - 0" /9"/5"
200LS-2
8' - 0" AFF
1 / 4' - 0" /9"/5"
200LS-2
18' - 0"
1 / 4' - 0" /9"/5"
200LS-2
SECTION TOTAL TRACK LENGTH
12"x10"/24x12 500R-2
LOUVERED GRILLE
12"x10"/24x24
500R-2
EGGCRATE RETURN
GRILLE
BOTTOM OF EQUIPMENT
ELEVATION
590 lb
RTU-XX
4.0 ton
RTU-XX
115 CFH
RTU-XX
HEATING COIL FLOW
OPERATING WEIGHT
NOT INCLUDING CURB
FUEL INPUT
GAS PIPE FLOW
NOMINAL COOLING
CAPACITY ROOFTOP UNIT
PIPE ACCESSORY TAGS
BALANCING VALVE
1/4 TURN BALL VALVE
CHECK VALVE
3-WAY MIXING VALVE
MOTORIZED CONTROL VALVE
3 WAY MOTORIZED CONTROL
VALVE
PRESSURE REDUCING VALVE
REFRIGERANT SOLENOID VALVE
BUTTERFLY VALVE
2" BALANCING
2" SHUTOFF
2" CHECK
2" TMV
2" M-CNTRL
2" 3-WAY CNTRL
2" PRV
3/8" SOLENOID
2" BUTTERFLY
EQUIPMENT ID
SYMBOL
BBB
INLET COLLAR DAMPER
MANUAL BALANCING DAMPER
BACKDRAFT DAMPER
COMBINATION FIRE/SMOKE
DAMPER
VAV-XX
10' - 0"
(E)VAV-XX
VAV-XX
Htg: 3.7 GPM
VAV-XX
BWR GEOTHERMAL WATER RETURN
BWS GEOTHERMAL WATER SUPPLY
BILLINGS, MONTANA
ANNUAL DESIGN CONDITIONS: ASHRAE FUNDAMENTALS 2017
WEATHER STATION - BILLINGS LOGAN INT'L ARPT, MT WMO# 726770
ELEVATION: 3570' LAT: 45.81N LONG: 108.54W
WINTER: -11.6 (99.6%)
SUMMER: 94.9 DRY BULB (0.4%)
63.0 WET BULB (0.4%)
INDOOR DESIGN CONDITIONS:
WINTER: 70 ± 2º F
SUMMER: 75 ± 2º F
HVAC DESIGN CRITERIA
BUILDING MECHANICAL SYSTEMS ARE DESIGNED IN ACCORDANCE WITH THE FOLLOWING CODES:
• 2021 INTERNATIONAL MECHANICAL CODE
• 2021 INTERNATIONAL PLUMBING CODE
• 2021 IECC INTERNATIONAL ENERGY CONSERVATION CODE
• ANSI/ASHRAE/IESNA STANDARD 90.1-2019 ENERGY STANDARD FOR BUILDINGS EXCEPT FOR
LOW-RISE RESIDENTIAL BUILDINGS
• ANSI/ASHRAE STANDARD 62.1-2019 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY
CODE COMPLIANCE
PIPING INSULATION SCHEDULE - INTERNATIONAL ENERGY CONSERVATION CODE
FLUID OPERATING
TEMPERATURE RANGE
AND USAGE [°F]
CONDUCTIVITY
[BTU-IN/HR-FT2-°F]
MEAN RATING
TEMPERATURE [°F]
INSULATION CONDUCTIVITY NOMINAL PIPE OR TUBE SIZE [INCHES]
< 1
TO
< 1-1/2
1-1/2
TO
< 4
TO
< 8 >=8
141 - 200
105 - 140
40 - 60
0.25 - 0.29
0.21 - 0.28
0.21 - 0.27
1.5
1.0
0.5
1.5
1.0
0.5
2.0
1.5
1.0
2.0
1.5
1.0
2.0
1.5
1.0
F
S
M
FIRE DAMPER
SMOKE DAMPER
MOTORIZED DAMPER
PIPE SYMBOLS
DAMPER TAGS
MECHANICAL CONTROL DEVICE TAGS
ABBREVIATIONS
1. INSTALLATION OF THE MECHANICAL SYSTEM SHALL BE BY A
LICENSED CONTRACTOR PER THE STATE BUILDING, MECHANICAL
ENERGY, FIRE, PLUMBING AND HEALTH CODES, AND REGULATIONS
AS ADOPTED BY LOCAL JURISDICTIONS.
2. ALL EQUIPMENT SHALL BE THE CAPACITY AND TYPE AS SHOWN ON
THE EQUIPMENT SCHEDULE AND SHALL BE THE LISTED
MANUFACTURER AND MODEL NUMBER OR SHALL BE AN EQUAL
APPROVED BY THE OWNER/ENGINEER.
3. CONTRACTOR IS TO BRING UP THE DISCREPANCIES AND ITEMS
WHICH ARE NOT SPECIFICALLY CALLED FOR OR SHOWN BUT ARE
REQUIRED FOR A COMPLETE MECHANICAL SYSTEM. ALL SUCH
ITEMS REQUIRED FOR A COMPLETE SYSTEM READY FOR THE
OWNER'S BENEFICIAL USE SHALL BE FURNISHED AND INSTALLED
INCLUDING ALL SUCH DISCREPANCY ITEMS MENTIONED ABOVE,
AT NO ADDITIONAL COST TO THE OWNER AND PER LOCAL CODES,
MANUFACTURER'S RECOMMENDATIONS AND APPLICABLE
STANDARDS WITH THE ARCHITECT/ENGINEER'S APPROVAL.
4. ALL EQUIPMENT SUPPLIED FOR THESE SPECIFICATIONS SHALL BE
FREE FROM DEFECTS IN MATERIAL, WORKMANSHIP, AND TITLE,
AND SHALL BE OF THE KIND AND QUALITY DESCRIBED HEREIN. IF
IT APPEARS WITHIN ONE YEAR FROM DATE OF FINAL ACCEPTANCE
THAT EQUIPMENT DOES NOT MEET THE WARRANTIES ABOVE, THE
CONTRACTOR SHALL IMMEDIATELY CORRECT ANY DEFECT AND
SHALL RESTORE THE SYSTEM TO THE ORIGINAL SATISFACTORY
CONDITIONS AT HIS EXPENSE. THE FOREGOING WARRANTY IS
EXCLUSIVE AND IN LIEU OF OTHER WARRANTIES, WHETHER
WRITTEN, ORAL, IMPLIED, OR STATUTORY. NO WARRANTY OR
MERCHANT ABILITY OF FITNESS FOR PURPOSE SHALL APPLY (THE
WARRANTY SHALL START FROM THE TIME OF
ARCHITECT/ENGINEER'S FINAL ACCEPTANCE).
5. COORDINATE THE CONSTRUCTION SCHEDULE WITH THE GC AND
PERFORM ALL REQUIRED WORK IN STRICT ACCORDANCE WITH
THE OWNER'S SCHEDULE.
6. MECHANICAL CONTRACTOR SHALL PAY FOR AND OBTAIN ALL
REQUIRED PERMITS AND CERTIFICATES REQUIRED BY THE
AUTHORITIES HAVING JURISDICTION.
7. HVAC NOTES:
A. PROVIDE FLEXIBLE CONNECTION IN ALL DUCTS CONNECTING
TO AIR MOVING EQUIPMENT AS CLOSE TO FAN AS POSSIBLE.
FLEXIBLE CONNECTION SHALL CONSIST OF 6" OR MORE OF
AIR TIGHT, FIRE PROOF FLEXIBLE NEOPRENE COATED WOVEN
FIBROUS GLASS MATERIAL. VENT FABRICS, INC. OR
APPROVED EQUAL.
B. ALL MAIN TRUNK AND BRANCH TAKEOFF DUCTWORK SHALL
BE SHEET METAL. FLEXIBLE DUCT IS ALLOWED ON LAST 6'
SERVING GRDs. FIBERGLASS DUCTWORK SHALL NOT BE
USED.
C. ALL SUPPLY & RETURN FLEXIBLE DUCTS CONNECTING TO
GRILLES, REGISTERS AND DIFFUSERS SHALL BE CONSTRUCTED
OF DOUBLE LAMINATION OF POLYESTER ENCAPSULATED
STEEL WIRE HELIX FOR INNER CORE HIGH DENSITY
FIBERGLASS INSULATION AND GRAY POLYESTER FILM WITH
SPIRAL REINFORCEMENTS, EQUAL TO ATCO-70 SERIES (MIN.
POS. PRESS. = 6' W.C. NEG. PRESS. = 0.75" W.C. & R=5.79).
D. SEAL ALL DUCTWORK JOINTS PER SMACNA CLASS C FOR
SYSTEMS UP TO 2 IN W.G. AND SEAL ALL JOINTS AND SEAMS
PER SMACNA CLASS B FOR SYSTEMS GREATER THAN 2 IN W.G.
E. ALL EQUIPMENT, DUCTWORK AND PIPING SHALL BE
STRUCTURALLY SUPPORTED AND SECURELY FASTENED TO
BUILDING STRUCTURE IN AN ACCEPTABLE MANNER TO
OWNER, ARCHITECT, ENGINEER AND LOCAL JURISDICTION
AND SHALL BE SEISMICALLY BRACED PER THE SMACNA
AND/OR REQUIRED BY LOCAL JURISDICTIONS.
F. PROVIDE LOCKABLE VOLUME DAMPERS IN ALL TAKEOFFS.
G. DUCT HANGERS, SUPPORTS AND METHODS OF INSTALLATION
SHALL CONFORM TO ASHRAE & SMACNA
RECOMMENDATIONS.
H. DUCT SIZES SHOWN ON PLANS INDICATE INSIDE FREE AREA.
I. ALL DUCTWORK SHALL BE CLASS-1 AIR DUCT AS APPROVED
BY U.L.-181.
J. ALL SQUARE ELBOWS SHALL HAVE TURNING VANES.
K. DUCT INSULATION SHALL BE PROVIDED PER DUCT
INSULATION SCHEDULE ON M0.00.
8. ALL FIRE RATED STRUCTURE SHALL BE FIRE DAMPERED AS
REQUIRED BY THE JURISDICTION.
9. FLEXIBLE DUCTS SHALL HAVE MAXIMUM 6 FEET LENGTH UNLESS
SHOWN OTHERWISE AND SHALL NOT PENETRATE THROUGH ANY
FIRE RATED WALLS. DO NOT INSTALL FLEXIBLE DUCTS WITHIN 6
FEET OF HEATING ELEMENT.
10. HVAC SYSTEM SHALL BE STARTED UP AND FUNCTIONALLY TESTED
BY MECHANICAL CONTRACTOR. MECHANICAL CONTRACTOR
SHALL CONFIRM THAT ALL HVAC SYSTEMS ARE READY FOR
TESTING, ADJUSTING, AND BALANCING. HVAC SYSTEMS SHALL BE
TESTED, ADJUSTED, AND BALANCED (TAB) BY CONTRACTOR
CERTIFIED BY THE AABC, NEBB, OR OTHER APPROVED AGENCY.
REFRIGERATION PIPING SHALL BE TESTED UNDER PRESSURE AND
PROVEN TO BE LEAK FREE. REFRIGERATION SYSTEM SHALL BE
STARTED UP AND BROUGHT DOWN TO DESIGN TEMPERATURE.
11. MECHANICAL, HVAC, AND PLUMBING ELEMENTS SHALL AT NO
TIME COME IN CONTACT WITH CEILING CONSTRUCTION EXCEPT
AS NECESSARY PENETRATIONS MAY REQUIRE. ESCUTCHEONS
SHALL BE USED ON ALL VISIBLE PENETRATIONS
12. ACCESS SHALL BE PROVIDED BY GC AS REQUIRED FOR
INSTALLATION AND MAINTENANCE OF MECHANICAL,ELECTRICAL,
AND OTHER ELEMENTS WITHIN CEILING SPACE AND AS REQUIRED
BY CODE. LOCATIONS FOR SPECIAL ACCESS DOORS, HATCHES,
ETC. SHALL BE COORDINATED WITH OTHER TRADES.
13. INSPECTIONS, AS REQUIRED BY LOCAL AUTHORITIES, SHALL BE
COORDINATED BY GC PRIOR TO CLOSING OF CEILING.
14. SHOP DRAWINGS FOR ALL RELATED TRADES (PLUMBING, HVAC)
SHALL BE SUBMITTED FOR REVIEW/APPROVAL PRIOR TO
MANUFACTURING AND INSTALLATION.
15. ALL HVAC ELEMENTS SHALL MATCH ADJACENT WALL OR CEILING
FINISH COLOR, INSTALLED FLUSH AND TRUE AND CENTERED
WITHIN THE CEILING GRID. LOCATIONS SHALL BE PER APPROVED
MECHANICAL PLANS.
16. INSULATION OF COLD WATER LINES SHALL BY PROVIDED TO
PREVENT CONDENSATION DAMAGE AND IN OBSERVANCE OF
ENERGY CONSERVATION PRACTICES, HOT WATER HEATING LINES
SHALL BE INSULATED - SEE SPECIFICATIONS.
17. CONTRACTOR SHALL LOCATE THERMOSTATS AND TEMPERATURE
SENSORS IN ACCESSIBLE SPACES AT 4'-0" AND UNITS IN ALL OTHER
SPACES AT 5'-0". UNITS AT 5' SHALL BE MOUNTED ALIGNED
VERTICALLY WITH LIGHT SWITCHES WHERE APPLICABLE.
LOCATIONS PER MECHANICAL PLAN AND TO BE COORDINATED BY
GC WITH OTHER TRADES.
18. ALL BROCHURES, OPERATING MANUALS, CATALOGS, SHOP
DRAWINGS, ETC. SHALL BE TURNED OVER TO THE OWNER AT JOB
COMPLETION. ALL PRODUCT WARRANTY REGISTRATION CARDS,
APPLICATIONS, AND CERTIFICATES SHALL BE COMPLETED AND
TURNED OVER TO THE OWNER.
19. THIS CONTRACTOR SHALL BE REQUIRED TO REPLACE FILTERS ON
HVAC EQUIPMENT AFTER ALL DUST PRODUCING CONSTRUCTION
HAS BEEN COMPLETED AND PRIOR TO THE FINAL PUNCH.
GENERAL MECHANICAL NOTES
V-E/A VENTILATION EXHAUST AIR
D-E/A DRYER EXHAUST AIR
RTU-XX
VAV-XX
TEMPERATURE & HUMIDITY SENSOR
TEMPERATURE SENSOR
THERMOSTAT
SENSOR
MANUAL SWITCH
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
NITROGEN DIOXIDE SENSOR
HUMIDITY SENSOR
HUMIDISTAT
CONTROLLER
LOW VOLT TIMER
NATURAL GAS
CONDENSATE DRAINAGECD
NG
* NOTE *
THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET
MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.
M-102
LEVEL 1 DISCIPLINE DESIGNATOR
LEVEL 2 DISCIPLINE DESIGNATOR
LEVEL SEQUENCE NUMBER
PLAN TYPE SEQUENCE NUMBER
SHEET TYPE DESIGNATOR
DUCT INSULATION SCHEDULE
DUCT SYSTEM
SUPPLY AIR
OUTSIDE AIR
FRESH AIR
MIN. R-12 INSULATION & VAPOR
BARRIER. PRE-ENGINEERED
Q-DUCT OR SIMILAR
OUTSIDE BUILDING ENVELOPE,
EXPOSED TO ENVIRONMENT
OUTSIDE BUILDING ENVELOPE,
WITHIN BUILDING
WITHIN THE BUILDING
ENVELOPE
RETURN AIR
RELIEF AIR
TRANSFER AIR
GENERAL EXHAUST AIR
MIN. R-12 INSULATION & VAPOR
BARRIER. PRE-ENGINEERED
Q-DUCT OR SIMILAR
MIN. R-6 INSULATION & VAPOR
BARRIER
MIN. R-6 INSULATION & VAPOR
BARRIER
MIN. R-6 INSULATION & VAPOR
BARRIER WHERE UNCONDITIONED
MIN. R-6 INSULATION WHERE
UNCONDITIONED
GREASE EXHAUST AIR N/A N/A
MIN. R-6 GREASE DUCT FIRE
INSULATION. FYREWRAP ELITE
OR SIMILAR
RETURN AIR
PLENUMS @ GRILLES
N/A
LINE GRILLE PLENUM AND FIRST 6
FT OF DUCT MIN. R-6 INSULATED
LINE GRILLE PLENUM AND FIRST 6
FT OF DUCT MIN. R-6 INSULATED
REMARKS:
1. ALL DUCT DIMENSIONS INDICATE INSIDE FREE DIMENSIONS AND DO NOT INCLUDE INSULATION THICKNESS.
2. THE 6' OF EXHAUST DUCT NEAREST TO THE EXTERIOR TO BE INSULATED WITH MIN. R-6 INSULATION (1 1/2" THICKNESS, 0.24 K VALUE).
2021 INTERNATIONAL ENERGY CONSERVATION CODE NOTES
1. PROVIDE COMMISSIONING PLAN IN ACCORDANCE WITH INTERNATIONAL ENERGY CONSERVATION CODE SECTION C408.2.1.
2. PROVIDE COMMISSIONING COMPLIANCE REPORT IN ACCORDANCE WITH INTERNATIONAL ENERGY CONSERVATION CODE SECTION
C407.3.1 & C407.3.2.
3. PROVIDE SYSTEMS TESTING AND BALANCING IN ACCORDANCE WITH INTERNATIONAL ENERGY CONSERVATION CODE SECTION
C408.2.2.
A. PROVIDE TAB REPORT FOR ALL AIR MOVING EQUIPMENT TO ENGINEER OF RECORD. ALL AIRFLOWS INDICATED ON PLANS ARE
UNDER NORMAL OPERATING CONDITIONS WITH ALL SYSTEMS RUNNING IN OCCUPIED MODE AT MINIMUM OUTSIDE AIR.
4. PROVIDE SYSTEMS, EQUIPMENT, AND CONTROLS FUNCTIONAL TESTING IN ACCORDANCE WITH INTERNATIONAL ENERGY
CONSERVATION CODE SECTION C408.2.3.
5. PROVIDE SUPPORTING DOCUMENTATION IN ACCORDANCE WITH INTERNATIONAL ENERGY CONSERVATION CODE CHAPTER 1
CHECKLIST, INCLUDING OPERATION AND MAINTENANCE MANUALS, HVAC CONTROL SYSTEM MAINTENANCE AND CALIBRATION
INFORMATION, HVAC CONTROL SEQUENCE OF OPERATIONS, COMMISSIONING REPORT, AND RECORD DRAWINGS.
6. PROVIDE OWNER SYSTEMS OPERATION TRAINING IN ACCORDANCE WITH INTERNATIONAL ENERGY CONSERVATION CODE SECTION
C103.6.
7. MOTORS SHALL COMPLY WITH SECTION C403.8 OF THE INTERNATIONAL ENERGY CONSERVATION CODE. FOR ADDITIONAL DETAILS, SEE EQUIPMENT SCHEDULES CONTAINED WITHIN THIS DRAWING SET.
8. SYSTEMS SHALL BE INSULATED AS PRESCRIBED IN SECTION C403.12. FOR ADDITIONAL DETAILS, SEE DUCTWORK AND PIPING
SPECIFICATION MATRICES CONTAINED WITHIN THIS DRAWING SET.
PROJECT GENERAL NOTES
* REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.
* THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR
FIELD VERIFYING, PRIOR TO FINAL BID, ALL EXISTING
CONDITIONS FOR PLUMBING AND MECHANICAL SYSTEMS
WITHIN TENANT SPACE AND WITHIN CLOSE PROXIMITY OF
TENANT SPACE.
* WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF
CONSTRUCTION, PREVENT CONSTRUCTION DEBRIS FROM
ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO
START OF WORK. UNSEAL DRAINS AT COMPLETION OF
CONSTRUCTION.
* COORDINATE INSTALLATION OF PIPING, DUCTWORK, CONDUIT,
LIGHTS, CABLE TRAY, STRUCTURE, AND EQUIPMENT TO
PREVENT CONFLICTS.
* THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE
CONDITIONS BOTH EXISTING AND THOSE ILLUSTRATED BY
THESE DOCUMENTS AS WELL AS THOSE WHICH CAN BE
REASONABLY ANTICIPATED INCLUDING, BUT NOT LIMITED TO
ARCHITECTURAL, ELECTRICAL, VENTILATION, PLUMBING, AND
OTHER SYSTEMS INVOLVED ON THIS PROJECT.
* FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING
SYSTEM, AND SHALL CONFORM TO ALL REQUIREMENTS OF
APPLICABLE FEDERAL, STATE, AND LOCAL CODES, INCLUDING
BUT NOT LIMITED TO THE INTERNATIONAL BUILDING CODE
AND INTERNATIONAL MECHANICAL CODE.
* ALL ROOF MOUNTED EQUIPMENT SHALL BE A MINIMUM 10'-0"
FROM EDGE OF ROOF.
* LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT
AWAY FROM THE SPACE ABOVE ELECTRICAL PANELS.
TRANSFORMERS AND OTHER ELECTRICAL EQUIPMENT.
* FIRE SEAL AROUND DUCT AND PIPING PENETRATIONS OF FIRE
RATED WALLS. REFER TO SPECIFICATION.
* PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND
DUCTS THROUGH FOUNDATIONS, FLOORS, WALLS, AND ROOF.
* ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT
TO MECHANICAL EQUIPMENT.
* REFER TO PLUMBING SERIES DRAWINGS FOR GAS AND A.C.
CONDENSATE DRAIN PIPING.
* PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF
FLOW UNTIL ANOTHER SIZE IS SHOWN.
* FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT
SHOWN ON THE SEGMENTS, REFER TO DETAILS, SCHEDULES,
AND SPECIFICATIONS.
* INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE
RESPECTIVE MANUFACTURER'S WRITTEN INSTALLATION
INSTRUCTIONS, AT A LEVEL OF QUALITY AND WORKMANSHIP
CONSISTENT WITH THE SPECIFICATIONS.
* LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS
INDICATED ON THE DRAWING, ARE APPROXIMATE AND
SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. WORK SHALL
BE COORDINATED WITH ALL OTHER TRADES TO AVOID
INTERFERENCE IN THE FIELD.
* INSTALL EXPOSED PIPING AND DUCTWORK AS HIGH AS
PRACTICAL IN ROOMS WITHOUT CEILINGS U.N.O.
MECHANICAL SHEET INDEX
M-001 MECHANICAL TITLE SHEET
M-115 LEVEL 5 PENTHOUSE HVAC PLAN
CHECKED BY
DRAWN BY
FLOOR NUMBER
SHEET TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
PROJECT NUMBER
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
24 X 36
S H
E E
T
ID
E N
TI
FI
C A
TI
O
N
DISCIPLINE
P R
O
JE
C T
ID
E
N
TI
FI
C
A
TI
O N
B U
IL
D
IN
G
BIM FILE NAME
C O
N T
R A
C T
O R
S R
E V
IS
IO
N B
LO
C
K G
R A
P H
IC
S
C A
LE
K
E Y
P
LA
N S
T A
M P
O R
S E
A L
D E
S
IG
N E
R
ID
E N
T
IF
IC
A
T
IO
N O
W N
E R
ID
E
N T
IF
IC
A T
IO
N
SHEET OF SHEETS
KALISPELL
406-755-3208
BOZEMAN
406-586-0707
VANCOUVER
360-852-8746 info@jackola.com jackola.com
MT0050ZZ
/1
/2
:4 :0
P
M
M-001
MECHANICAL TITLE SHEET
COOLING TOWERS
100% DRAWINGS
2/14/2025
11/27/2024TLH
TAT
200804:22
GENERAL SERVICES
ADMINISTRATION
PUBLIC BUILDING SERVICE
ROCKY MOUNTAIN REGION (8)
1 2
ACQUISITION DIVISION 8PQ
JAMES F. BATTIN FB/CH
2601 2ND AVENUE NORTH
BILLINGS, MT 59101
47PJ0020D0018
47PJ0024F0332
JACKOLA ENGINEERING AND ARCHITECTURE
JAMES F. BATTIN COURTHOUSE AND FEDERAL BUILDING
2601 2ND AVE N BILLINGS MT 59101
KEVIN SPRUELL
ROOF
MECHANICAL
HVAC GENERAL NOTES
* CONTRACTOR SHALL LOCATE THERMOSTATS AND
TEMPERATURE SENSORS AT 4'-0" AFF, A MAXIMUM OF 8"
FROM LIGHT SWITCH.
* PROVIDE A 4" HOUSEKEEPING PAD FOR EACH PIECE OF
MECHANICAL EQUIPMENT. COORDINATE SIZES WITH
MECHANICAL EQUIPMENT SELECTED.
* ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK SHALL BE
RATED FOR PRESSURE CLASS OF 2" W.G. UNLESS NOTED
OTHERWISE.
* THIS CONTRACTOR SHALL BE REQUIRED TO REPLACE FILTERS
ON HVAC EQUIPMENT AFTER ALL DUST PRODUCING
CONSTRUCTION HAS BEEN COMPLETED AND PRIOR TO THE
FINAL PUNCH.
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
Mark Date Description
M
ONTANA
No. 71046 PE
P R
O F
E S
S
IO N A L EN
G
IN
E E
R
L I C E NS E D
TYLER
ARNOLD
TONJUM
DN
UP
5.9
6.3
6.3
6.5
6.5
9.2
9.2
9.9
9.9
AA
CC
A.5A.5
EE
F F
F.1 F.1
H H
H.8 H.8
J J
L L
L.9L.9
MM
M.7M.7
NN
PP
PRISONER ELEV #5
MACHINE ROOM
MD3.M
STAIR 1 L-5M
P102
SERVICE ELEV #3 LM
ZE3.M
Space
JUDGE'S ELEV #4
MACHINE ROOM
P101
MECHANICAL
PENTHOUSE
P002
MECHANICAL
PENTHOUSE
P001
ELEVATOR MACHINE
ROOM (#1 & #2)
P003
4 4
7 7
SPRAY PIPE
EQUALIZER
BASIN WATER TREATMENT
SUPPLY AND RETURN
CONDENSER WATER SUPPLY AND RETURN
CONDENSER WATER SUPPLY AND RETURN
BASIN MAKE UP WATER
BASIN DRAIN AND OVERFLOW
4" BWS
4" BWR
4" CWS
4" CWR
2" CD
1 1/2" CW
6" EQ
2 1/2" BWR
2 1/2" BWS
4" CWR
4" CWS
VFDS TO BE MOVED INSIDE
PIPE ROUTING, SIZING AND INSULATION IS SCHEMATIC IN NATURE AND SHALL BE VERIFIED BY CONTRACTOR PRIOR TO BIDDING.
NEW COIL BUNDLE TO
MATCH EXISTING
NEW COIL BUNDLE TO
MATCH EXISTING
KEYNOTES
1 (2) VFDS TO BE REMOVED FROM EXTERIOR MOUNTING AND
RELOCATED INTO THE MECHANCAL PENTHOUSE. REROUTE
CONDUIT AND WIRE AS REQUIRED FOR NEW LOCATION. EXISTING
CONDUIT IS ROUTED ABOVE NEW VFD LOCATION. VFDS TO BE
STACKED VERTICALLY IN NEW LOCATION TO ALLOW PASSAGE
BEHIND DOAS UNIT.
2 EXTERIOR PIPING ASIDE FROM PIPING CONVEYING GLYCOL
MIXTURES AND SOME DRAIN PIPING IS INSULATED AND WRAPPED
WITH HEAT TRACE TAPE. FILL FLOAT LOCATION IN BASIN ALSO
CONTAINS HEAT TRACE TAPE. CONTRACTOR TO VERIFY EXTENT OF
HEAT TRACE TAPE AND INSULATION AND REPLACE ALL HEAT TRACE
AND INSULATION ON PIPING SERVING COOLING TOWERS. PIPING
TO REMAIN IN PLACE WHERE POSSIBLE.
3 SEE ISOMETRIC 2/M-115 FOR SCHEMATIC PIPE ROUTING AND
SIZING. ACTUAL LENGTHS AND QUANTITIES TO BE VERIFIED BY
CONTRACTOR.
4 ALL EVAPORATIVE MEDIA TO BE REPLACED. CONTRACTOR TO
VERIFY EXISTING MEDIA QUANTITY AND TYPE.
5 REPLACE EXISTING COILS WITH NEW GALVANIZED COILS PER
SPECIFICATIONS.
6 A CHEMICAL WATER TREATMENT SYSTEM HAS BEEN INSTALLED
AFTER THE ENGINEERING SITE VISIT. CONTRACTOR TO NOTIFY
ENGINEER IF CHEMICAL WATER TREATMENT INSTALLATION CAUSES
CHANGES TO PIPING IDENTIFIED WITHIN THIS SCOPE OF WORK.
7 REPLACE EXISTING SPRAYER NOZZLES WITH NEW SPRAYER
NOZZLES.
8 VFD'S ARE 40A, 3Ø CIRCUITS SERVED BY PANEL EQHP-6B. INSPECT
CONDITION OF ELECTRICAL MATERIALS AND REUSE TO THE EXTENT
POSSIBLE. REUSE BREAKERS 25,27,29 AND 31,33,35.
9 PANEL SERVING LOCATED IN THIS AREA.
CHECKED BY
DRAWN BY
FLOOR NUMBER
SHEET TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
PROJECT NUMBER
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
24 X 36
S H
E E
T
ID
E N
TI
FI
C A
TI
O
N
DISCIPLINE
P R
O
JE
C T
ID
E
N
TI
FI
C
A
TI
O N
B U
IL
D
IN
G
BIM FILE NAME
C O
N T
R A
C T
O R
S R
E V
IS
IO
N B
LO
C
K G
R A
P H
IC
S
C A
LE
K
E Y
P
LA
N S
T A
M P
O R
S E
A L
D E
S
IG
N E
R
ID
E N
T
IF
IC
A
T
IO
N O
W N
E R
ID
E
N T
IF
IC
A T
IO
N
SHEET OF SHEETS
KALISPELL
406-755-3208
BOZEMAN
406-586-0707
VANCOUVER
360-852-8746 info@jackola.com jackola.com
MT0050ZZ
/1
/2
:4 :0
P
M
M-115
LEVEL 5 PENTHOUSE HVAC PLAN
COOLING TOWERS
100% DRAWINGS
2/14/2025
2/12/2025TAT
TAT
200804:22
GENERAL SERVICES
ADMINISTRATION
PUBLIC BUILDING SERVICE
ROCKY MOUNTAIN REGION (8)
2 2
ACQUISITION DIVISION 8PQ
JAMES F. BATTIN FB/CH
2601 2ND AVENUE NORTH
BILLINGS, MT 59101
47PJ0020D0018
47PJ0024F0332
JACKOLA ENGINEERING AND ARCHITECTURE
JAMES F. BATTIN COURTHOUSE AND FEDERAL BUILDING
2601 2ND AVE N BILLINGS MT 59101
KEVIN SPRUELL
ROOF
MECHANICAL
GENERAL NOTES - HVAC
* ENSURE ALL EXISTING PIPING AND VALVES ASSOCIATED WITH
SCOPE OF WORK ARE REBALANCED.
* COOLING TOWERS TO BE UL LISTED AND FM APPROVED AND NOT
REQUIRE FIRE SPRINKLERS.
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
Mark Date Description
8' 16'4'0 1/8" = 1'-0"1
PENTHOUSE HVAC PLAN
COOLING TOWER ISOMETRIC
M
ONTANA
No. 71046 PE
P R
O F
E S
S
IO N A L EN
G
IN
E E
R
L I C E NS E D
TYLER
ARNOLD
TONJUM
VFDS
| Sheets |
| M-001 - MECHANICAL TITLE SHEET |
| M-115 - LEVEL 5 PENTHOUSE HVAC PLAN |
File details come from the government source that posted it. Updated .