Bike_Loop_Concept_Design.pdf

PDF 12 MB Posted

Attached to
Final Design Services for Downtown Bike Loop Project
Solicitation number
26-017
Issued by
Alameda County, Hayward City, California

About this file

This is a concept design plan document for the City of Hayward's Downtown Bike Loop project, a transportation infrastructure initiative spanning five downtown streets: City Center Drive, 2nd Street, B Street, C Street, and Watkins Street. The project encompasses the design and installation of protected bike lanes, two-way cycle tracks, buffered bike lanes, raised concrete islands, rectangular rapid-flashing beacons (RRFB), bicycle signals, curb ramps, and multi-directional crossing improvements across multiple intersections. The concept plan includes six sheets detailing various segments of the bike loop with specific design elements such as parking configurations, bus stop locations, truck turn templates, and potential utility conflicts. The design addresses pedestrian safety through features including mid-block crosswalks, no-right-turn-on-red restrictions, and curb ramp reconstructions at key locations. The proposal submission deadline is June 5, 2026, at 4:00 p.m., with an optional pre-proposal conference and site walkthrough scheduled for May 14, 2026, at 1:00 p.m. via Microsoft Teams; questions must be submitted by May 22, 2026, at 4:00 p.m.

The project requires qualified civil engineering design services consultants to prepare comprehensive Plans, Specifications, and Estimates (PS&E) based on these conceptual plans, with deliverables at 30%, 60%, 90%, and 100% completion milestones, along with construction support services. The City of Hayward has established a Local Business Contract Equity (LBCE) Program requirement with a 70% Local Business Enterprise (LBE) goal and 30% Small Local Business Enterprise (SLBE) goal. The project is funded through Alameda County Transportation Commission (ACTC) sources including Measure B and Measure BB funds. Contractors must comply with California prevailing wage requirements, certified payroll obligations, and maintain Workers' Compensation and Public Liability Insurance with minimum single limits of $1,000,000. All contractors and subcontractors must execute labor and performance bonds at minimum 100 percent of contract value. Evaluation criteria include project understanding and approach (25 points), firm experience (20 points), project staffing qualifications (15 points), project manager qualifications (15 points), cost (15 points), and LBCE participation (10 points). No specific budget range or award value is disclosed; however, the City Council reserves the right to split awards among multiple proposers.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

ITY C

EN

TER

D R

2ND ST

FOOTHILL BLVD

R U

SSEL W

AY

SENIOR RESIDENCESENIOR RESIDENCE

2ND ST

A ST

R

IC

H

AR

D

PL

M

AT

C H

LI

N

E

- S

EE

B

EL

O

W L

EF

T

M

ATC

H

LIN

E - SEE ABO

VE R

IG

H

T M

AT

C H

LI

N

E

- S

EE

S

H

EE

T

SS

-0

DOWNTOWN BIKE LOOP CONCEPT PLAN 00 50' 100'

NORTH

NORTH

INSTALL RAISED CONCRETE ISLANDS

(TYP.)

PARKING PROTECTED BIKE LANE

PARKING PROTECTED BIKE LANE

INSTALL RAISED CONCRETE ISLANDS

(TYP.)

POTENTIAL WATER VALVE CONFLICT

POTENTIAL WATER VALVE CONFLICT

PARKING PROTECTED BIKE LANE

PARKING PROTECTED BIKE LANE

DISCLAIMER:

NOT ALL UTILITY CONFLICTS

HAVE BEEN IDENTIFIED.

INSTALL RRFB

INSTALL RRFB

PROVIDE TRUCK TURN TEMPLATES

FOR ALL INTERSECTIONS (TYP.)

2ND ST

B ST C

ST

2ND ST

BELIN

A ST

D

ST

M

AT

C H

LI

N

E

- S

EE

S

H

EE

T

SS

-0

M

AT

C H

LI

N

E

- S

EE

B

EL

O

W L

EF

T

M

AT

C H

LI

N

E

- S

EE

A

BO

VE

R

IG

H T

M

ATC

H

LIN

E - SEE SH

EET SS-03

MATCHLINE - SEE SHEET SS-04

MATCHLINE - SEE SHEET SS-05

DOWNTOWN BIKE LOOP CONCEPT PLAN 00 50' 100'

NORTH

POTENTIAL NEED FOR RECONSTRUCTION

OF CURB RAMP TO MULTI-DIRECTIONAL POTENTIAL LOCATION FOR CROSSWALK

PARKING PROTECTED BIKE LANE

PARKING PROTECTED BIKE LANE

BUS STOP LOCATION

NO RIGHT TURN ON RED

INSTALL RAISED CONCRETE

ISLANDS (TYP.)

POTENTIAL WATER VALVE CONFLICT

PARKING PROTECTED BIKE LANE

BUS STOP LOCATION

BUS STOP LOCATION POTENTIAL WATER

VALVE CONFLICT

INSTALL RAISED CONCRETE

ISLANDS (TYP.)

DISCLAIMER:

NOT ALL UTILITY CONFLICTS

HAVE BEEN IDENTIFIED.

BICYCLE SIGNAL

INSTALL CURB RAMP

2ND ST

E

ST

C ST

M

AI

N S

T

FO

OTH

ILL

B

LV

D

FO

OT

HI

LL

B

LV

D

1S T

ST

M

AT

C H

LI

N

E

- S

EE

S

H

EE

T

SS

-0

M

AT

CH

LI

NE

SE

E

SH

EE

T

SS

-0

DOWNTOWN BIKE LOOP CONCEPT PLAN 00 50' 100'

NORTH

NORTH

INSTALL RAISED CONCRETE

ISLANDS (TYP.)

PARKING PROTECTED BIKE LANE

PARKING PROTECTED BIKE LANE

POTENTIAL WATER

VALVE CONFLICT

TWO-WAY CYCLE TRACK

BACK-IN ANGLE PARKING

BACK-IN ANGLE PARKING

RELOCATE BUS STOP LOCATION

BICYCLE SIGNAL

MID-BLOCK CROSSWALK

DISCLAIMER:

NOT ALL UTILITY CONFLICTS

HAVE BEEN IDENTIFIED.

FR

O

M

TO

FO

OTH

ILL

B

LV

D

C ST

FO

OT

HI

LL

B

LV

D

1S T

ST

M O

N

TG

O M

ER

Y AVE

B ST

W

ATKIN

S ST

M

AT

C H

LI

N

E

- S

EE

S

H

EE

T

SS

-0

M

AT

CH

LI

NE

SE

E

SH

EE

T

SS

-0

DOWNTOWN BIKE LOOP CONCEPT PLAN 00 50' 100'

NORTH

TWO-WAY CYCLE TRACK

DISCLAIMER:

NOT ALL UTILITY CONFLICTS

HAVE BEEN IDENTIFIED.

MATCHLINE - SEE SHEET SS-05

NORTH

PARKING RETAINED

PARKING RETAINED PARKING RETAINED

BUFFERED BIKE LANE

BUFFERED BIKE LANE

M icr os of t C or po ra tio n

M ax ar

CN

ES

(2

5) D ist rib ut io n Ai rb us

D S

TM

AP

M O

BI

LI

TY

E ar th st ar

G eo gr ap hi cs

S

IO

WATKINS ST

C S

T

WATKINS ST

W

IL

LI

S

AV

E

JACKSO

N ST

M

AT

C H

LI

N

E

- S

EE

B

EL

O

W L

EF

T

M

AT

C H

LI

N

E

- S

EE

S

H

EE

T

SS

-0

M

ATCHLINE - SEE SHEET SS-06

DOWNTOWN BIKE LOOP CONCEPT PLAN 00 50' 100'

NORTH

BUS STOP LOCATION

BUS STOP LOCATION

DISCLAIMER:

NOT ALL UTILITY CONFLICTS

HAVE BEEN IDENTIFIED.

M

AT

C H

LI

N

E

- S

EE

A

BO

VE

R

IG

H T

COORDINATE WITH SITE DEVELOPMENT PLANS

PARKING PROTECTED BIKE LANE

JACKSON ST

WATKINS ST

JACKSON ST

FLETC

H

ER

LN

MATCHLINE - SEE SHEET SS-05

DOWNTOWN BIKE LOOP CONCEPT PLAN

00 50' 100'

NORTH

DISCLAIMER:

NOT ALL UTILITY CONFLICTS

HAVE BEEN IDENTIFIED.

Sheets and Views
1 SS-01
2 SS-02
3 SS-03
4 SS-04
5 SS-05
6 SS-06

File details come from the government source that posted it. Updated .