Bid Summary Form 2018-10.pdf

PDF 107 KB Posted

Attached to
East and West Forks - Bridge Replacement
Solicitation number
S-KA0010-00012955
Issued by
Jackson County, Amity City, Oregon

About this file

This document is a Bid Summary Form from the City of Ashland's Engineering Division for the East and West Forks Project – Bridge Replacement (Project No. 2018-10a), detailing bid proposals received on April 24, 2025. Three contractors submitted bids: Suulutaaq Inc ($320,999), Dietrich Const. LLC ($356,780), and Knife River Materials ($442,000). All bidders provided 10% bid bonds, acknowledged two addenda, demonstrated pre-qualification with three previous work examples, and submitted completed bid forms. Two of the three bidders (Dietrich Const. LLC and Knife River Materials) were deemed responsive, with qualifications for bridge manufacturers, while Suulutaaq Inc was marked as non-responsive.

The bid summary reveals that each contractor used different bonding companies (MarshMcLennan, Lexon, and Liberty Mutual respectively) and submitted identical base and total bids. The procurement process required bidders to meet specific criteria, including providing evidence of previous work, bridge manufacturer qualifications, and complete bid documentation. No alternate bids were submitted, and the project appears to be a bridge replacement initiative with strict compliance requirements for documentation and technical qualifications. The Engineer's Estimate was not available (marked as NA), and the competitive bidding process resulted in a range of proposals with a $121,001 difference between the lowest and highest bids.

View the file

Other files

File Type Posted
Addendum 2~1.pdf PDF
Addendum No. 1 - 250318-01.pdf PDF
East and West Forks - Bridge Replacement 2018-18a Final.pdf PDF
Addendum 1~2.pdf PDF
Mandatory Pre-Bid Walk Attendee List.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF ASHLAND - ENGINEERING DIVISION

SUMMARY OF PROPOSALS

Project: East and West Forks Project – Bridge Replacement Project No.: 2018-10a Date of Bid Opening: April 24, 2025 at 2:00 pm

Corrected Engineer’s Estimate: NA No of Addenda: 2

1 2 3 4 5

Name of Bidder & Address

Suulutaaq Inc 5250 High Banks Rd Suite 650

Springfield OR 97478

Dietrich Const. LLC PO Box 1959

Grants Pass OR 97528

Knife River Materials PO Box 1145

Medford OR 97501

All Alternates Bid Yes/No

NA

Base Bid

$320,999

$356,780

$442,000

Total Bid

$320,999

$356,780

$442,000

Name of Bonding Co.

MarshMcLennan

Lexon

Liberty Mutual

Amount of Bid Bond.

10%

Nos. of Addenda Acknowledged (should be 2)

Pre-Qualification Three Examples of

Previous Work

Yes

Qualification of Bridge Manufacturer

No

Completed & Signed Bid Form

(including subcontract disclosure)

Responsive Bid? No Yes Yes

CITY OF ASHLAND - ENGINEERING DIVISION

File details come from the government source that posted it. Updated .