Bid Sheets Group 4.pdf
PDF 170 KB Posted
- Attached to
- Count Station Maintenance
- Solicitation number
- RFB 605 2300000729 1
- Issued by
- Elliott County, Kentucky
About this file
This is a bid sheet for Group 4 of a Station Maintenance Request for Bids (RFB) dated April 28, 2023, covering work across five districts (8, 9, 10, 11, and 12). The project involves furnishing and installing electrical and infrastructure components including conduit, cables, sensors, junction boxes, poles, cabinets, and related equipment across the specified districts. The bid sheet itemizes 23 line items with varying quantities for each district, ranging from single installations of electrical services and wooden poles to larger quantities of loop wire (1,000 to 4,000 linear feet depending on district) and saw slot and fill work (200 to 900 linear feet). Specific quantities differ by district, with Districts 8 and 9 having identical quantities and Districts 10, 11, and 12 having scaled quantities based on project scope within each respective district.
The bid sheet provides a standardized format for contractors to enter unit prices and calculate extended prices for each line item across all five districts. Each district includes identical item descriptions and categories but with adjusted quantities reflecting the specific infrastructure requirements for that location. The document allows bidders to submit separate pricing for each district or to provide comprehensive pricing across all districts, with totals calculated for each individual district and a combined Group 4 total. The bid count reference and connection to the Station Maintenance RFB document indicate this represents one component of a larger infrastructure or facility maintenance project solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Annual Affidavit for Bidders, Offerors and Contractors - Jan 2023.docx | DOCX document | |
| Drawings.pdf | ||
| Bid Sheet Group 2.pdf | ||
| Buy America Clause.pdf | ||
| Bid Sheets Group 3.pdf | ||
| FHWA-1273.pdf | ||
| How to Submit an Online Response - March 2023.pdf | ||
| District Map.pdf | ||
| Bid Sheets Group 1.pdf | ||
| Final_RFB_605_2300000729_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Group 4: District 8
Item Description Unit D08 Quantity
D08 Unit Price
D08 Extended
Price 1 Furnish, Bore and Jack Pipe – 2 Inch LIN FT 50
2 Furnish and Install Conduit 1¼ Inch LIN FT 250
3 Furnish and Install Conduit 2 Inch LIN FT 125
4 Furnish and Install Electrical Service EACH 1
5 Furnish and Install Galvanized Steel Cabinet EACH 1
6 Install Pad Mount Cabinet EACH 1
7 Install Pole Mount Cabinet EACH 1
8 Furnish and Install Junction Box 10x8x4 EACH 1
9 Furnish and Install Junction Box Type A EACH 7
10 Furnish and Install Junction Box Type B EACH 7
11 Saw Slot and Fill LIN FT 900
12 Furnish, Install and Remove Lane Closure EACH 10
13 Furnish, Install and Remove Shoulder Closure EACH 5
14 Furnish and Install Piezoelectric Sensor EACH 10
15 Install Piezoelectric Sensor EACH 5
16 Furnish and Install 35’ Wooden Pole EACH 1
17 Excavate Trench and Backfill LIN FT 325
18 Furnish and Install Cable No. 14/1 Pair LIN FT 250
19 Furnish and Install Loop Wire LIN FT 4000
20 Furnish and Install Ground Wire LIN FT 25
21 Furnish and Install Wood Post EACH 3
22 Remove and Replace Sidewalk SQYD 1
23 Loop Test EACH 1
Group 4: District 8 Total
Group 4: District 9
Item Description Unit D09 Quantity
D09 Unit Price
D09 Extended
Price 1 Furnish, Bore and Jack Pipe – 2 Inch LIN FT 50
2 Furnish and Install Conduit 1¼ Inch LIN FT 250
3 Furnish and Install Conduit 2 Inch LIN FT 125
4 Furnish and Install Electrical Service EACH 1
5 Furnish and Install Galvanized Steel Cabinet EACH 1
6 Install Pad Mount Cabinet EACH 1
7 Install Pole Mount Cabinet EACH 1
8 Furnish and Install Junction Box 10x8x4 EACH 1
9 Furnish and Install Junction Box Type A EACH 7
10 Furnish and Install Junction Box Type B EACH 7
11 Saw Slot and Fill LIN FT 900
12 Furnish, Install and Remove Lane Closure EACH 10
13 Furnish, Install and Remove Shoulder Closure EACH 5
14 Furnish and Install Piezoelectric Sensor EACH 10
15 Install Piezoelectric Sensor EACH 5
16 Furnish and Install 35’ Wooden Pole EACH 1
17 Excavate Trench and Backfill LIN FT 325
18 Furnish and Install Cable No. 14/1 Pair LIN FT 250
19 Furnish and Install Loop Wire LIN FT 4000
20 Furnish and Install Ground Wire LIN FT 25
21 Furnish and Install Wood Post EACH 3
22 Remove and Replace Sidewalk SQYD 1
Group 4: District 9 Total
Group 4: District 10
Item Description Unit D10 Quantity
D10 Unit Price
D10 Extended
Price 1 Furnish, Bore and Jack Pipe – 2 Inch LIN FT 50
2 Furnish and Install Conduit 1¼ Inch LIN FT 50
3 Furnish and Install Conduit 2 Inch LIN FT 25
4 Furnish and Install Electrical Service EACH 1
5 Furnish and Install Galvanized Steel Cabinet EACH 1
6 Install Pad Mount Cabinet EACH 1
7 Install Pole Mount Cabinet EACH 1
8 Furnish and Install Junction Box 10x8x4 EACH 1
9 Furnish and Install Junction Box Type A EACH 2
10 Furnish and Install Junction Box Type B EACH 2
11 Saw Slot and Fill LIN FT 200
12 Furnish, Install and Remove Lane Closure EACH 2
13 Furnish, Install and Remove Shoulder Closure EACH 1
14 Furnish and Install Piezoelectric Sensor EACH 5
15 Install Piezoelectric Sensor EACH 5
16 Furnish and Install 35’ Wooden Pole EACH 1
17 Excavate Trench and Backfill LIN FT 75
18 Furnish and Install Cable No. 14/1 Pair LIN FT 50
19 Furnish and Install Loop Wire LIN FT 1000
20 Furnish and Install Ground Wire LIN FT 10
21 Furnish and Install Wood Post EACH 3
22 Remove and Replace Sidewalk SQYD 1
Group 4: District 10 Total
Group 4: District 11
Item Description Unit D11 Quantity
D11 Unit Price
D11 Extended
Price 1 Furnish, Bore and Jack Pipe – 2 Inch LIN FT 50
2 Furnish and Install Conduit 1¼ Inch LIN FT 150
3 Furnish and Install Conduit 2 Inch LIN FT 75
4 Furnish and Install Electrical Service EACH 1
5 Furnish and Install Galvanized Steel Cabinet EACH 1
6 Install Pad Mount Cabinet EACH 1
7 Install Pole Mount Cabinet EACH 1
8 Furnish and Install Junction Box 10x8x4 EACH 1
9 Furnish and Install Junction Box Type A EACH 5
10 Furnish and Install Junction Box Type B EACH 5
11 Saw Slot and Fill LIN FT 525
12 Furnish, Install and Remove Lane Closure EACH 6
13 Furnish, Install and Remove Shoulder Closure EACH 3
14 Furnish and Install Piezoelectric Sensor EACH 5
15 Install Piezoelectric Sensor EACH 5
16 Furnish and Install 35’ Wooden Pole EACH 1
17 Excavate Trench and Backfill LIN FT 225
18 Furnish and Install Cable No. 14/1 Pair LIN FT 150
19 Furnish and Install Loop Wire LIN FT 3000
20 Furnish and Install Ground Wire LIN FT 20
21 Furnish and Install Wood Post EACH 3
22 Remove and Replace Sidewalk SQYD 1
Group 4: District 11 Total
Group 4: District 12
Item Description Unit D12 Quantity
D12 Unit Price
D12 Extended
Price 1 Furnish, Bore and Jack Pipe – 2 Inch LIN FT 50
2 Furnish and Install Conduit 1¼ Inch LIN FT 100
3 Furnish and Install Conduit 2 Inch LIN FT 50
4 Furnish and Install Electrical Service EACH 1
5 Furnish and Install Galvanized Steel Cabinet EACH 1
6 Install Pad Mount Cabinet EACH 1
7 Install Pole Mount Cabinet EACH 1
8 Furnish and Install Junction Box 10x8x4 EACH 1
9 Furnish and Install Junction Box Type A EACH 3
10 Furnish and Install Junction Box Type B EACH 3
11 Saw Slot and Fill LIN FT 350
12 Furnish, Install and Remove Lane Closure EACH 4
13 Furnish, Install and Remove Shoulder Closure EACH 2
14 Furnish and Install Piezoelectric Sensor EACH 5
15 Install Piezoelectric Sensor EACH 5
16 Furnish and Install 35’ Wooden Pole EACH 1
17 Excavate Trench and Backfill LIN FT 150
18 Furnish and Install Cable No. 14/1 Pair LIN FT 100
19 Furnish and Install Loop Wire LIN FT 2000
20 Furnish and Install Ground Wire LIN FT 10
21 Furnish and Install Wood Post EACH 3
22 Remove and Replace Sidewalk SQYD 1
Group 4: District 12 Total
Group 4: Districts 8, 9, 10, 11, and 12
District 8 Total
District 9 Total
District 10 Total
District 11 Total
District 12 Total
Group 4 Total Bid
| Count Station Maintenance RFB 04-28-23.pdf |
| Item |
| Item |
| Item |
| Item |
| Item |
File details come from the government source that posted it. Updated .