Count Station Maintenance
Solicitation number
RFB 605 2300000729 1
Issued by
Elliott County, Kentucky

About this file

Bid Sheets Summary

This document is a bid sheet for a traffic signal installation and maintenance project covering Districts 6 and 7. The project encompasses furnishing and installing electrical infrastructure, conduit systems, cabinets, junction boxes, sensors, poles, and associated equipment across two districts. District 6 requires 23 line items including 100 linear feet of 2-inch pipe boring and jacking, 850 linear feet of 1-inch conduit, 425 linear feet of 2-inch conduit, 4 electrical services, 4 galvanized steel cabinets, 25 piezoelectric sensors, 17,000 linear feet of loop wire, and 1,275 linear feet of trench excavation and backfill work. District 7 requires similar items with generally smaller quantities, including 100 linear feet of 2-inch pipe, 550 linear feet of 1-inch conduit, 225 linear feet of 2-inch conduit, 3 electrical services, 3 steel cabinets, and 11,000 linear feet of loop wire. Both districts include lane and shoulder closures, pole installations, sidewalk removal and replacement, and loop testing.

The bid sheet provides line-item quantities for each district but does not include unit prices or extended prices on the provided pages, indicating this is a blank bid form awaiting contractor pricing. The document references a larger RFB (Request for Bids) dated 04-28-23 for Count Station Maintenance that includes additional bid groups for Districts 8, 9, 10, 11, and 12. No award dates, contract terms, funding sources, or set-aside information is presented in this excerpt of the bid sheet.

View the file

Other files

File Type Posted
FHWA-1273.pdf PDF
How to Submit an Online Response - March 2023.pdf PDF
District Map.pdf PDF
Bid Sheets Group 1.pdf PDF
Final_RFB_605_2300000729_1_SO_FORM.PDF PDF
Annual Affidavit for Bidders, Offerors and Contractors - Jan 2023.docx DOCX document
Drawings.pdf PDF
Bid Sheets Group 4.pdf PDF
Bid Sheet Group 2.pdf PDF
Buy America Clause.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Group 3 – Districts 6 and 7

Group 3: District 6

Item Description Unit D06 Quantity

D06 Unit Price

D06 Extended

Price 1 Furnish, Bore and Jack Pipe – 2 Inch LIN FT 100

2 Furnish and Install Conduit 1¼ Inch LIN FT 850

3 Furnish and Install Conduit 2 Inch LIN FT 425

4 Furnish and Install Electrical Service EACH 4

5 Furnish and Install Galvanized Steel Cabinet EACH 4

6 Install Pad Mount Cabinet EACH 4

7 Install Pole Mount Cabinet EACH 4

8 Furnish and Install Junction Box 10x8x4 EACH 4

9 Furnish and Install Junction Box Type A EACH 25

10 Furnish and Install Junction Box Type B EACH 25

11 Saw Slot and Fill LIN FT 3000

12 Furnish, Install and Remove Lane Closure EACH 34

13 Furnish, Install and Remove Shoulder Closure EACH 17

14 Furnish and Install Piezoelectric Sensor EACH 25

15 Install Piezoelectric Sensor EACH 25

16 Furnish and Install 35’ Wooden Pole EACH 4

17 Excavate Trench and Backfill LIN FT 1275

18 Furnish and Install Cable No. 14/1 Pair LIN FT 850

19 Furnish and Install Loop Wire LIN FT 17000

20 Furnish and Install Ground Wire LIN FT 80

21 Furnish and Install Wood Post EACH 12

22 Remove and Replace Sidewalk SQYD 1

23 Loop Test EACH 1

Group 3: District 6 Total

Group 3: District 7

Item Description Unit D07 Quantity

D07 Unit Price

D07 Extended

Price 1 Furnish, Bore and Jack Pipe – 2 Inch LIN FT 100

2 Furnish and Install Conduit 1¼ Inch LIN FT 550

3 Furnish and Install Conduit 2 Inch LIN FT 225

4 Furnish and Install Electrical Service EACH 3

5 Furnish and Install Galvanized Steel Cabinet EACH 3

6 Install Pad Mount Cabinet EACH 3

7 Install Pole Mount Cabinet EACH 3

8 Furnish and Install Junction Box 10x8x4 EACH 3

9 Furnish and Install Junction Box Type A EACH 16

10 Furnish and Install Junction Box Type B EACH 16

11 Saw Slot and Fill LIN FT 1900

12 Furnish, Install and Remove Lane Closure EACH 22

13 Furnish, Install and Remove Shoulder Closure EACH 11

14 Furnish and Install Piezoelectric Sensor EACH 20

15 Install Piezoelectric Sensor EACH 15

16 Furnish and Install 35’ Wooden Pole EACH 3

17 Excavate Trench and Backfill LIN FT 775

18 Furnish and Install Cable No. 14/1 Pair LIN FT 550

19 Furnish and Install Loop Wire LIN FT 11000

20 Furnish and Install Ground Wire LIN FT 50

21 Furnish and Install Wood Post EACH 9

22 Remove and Replace Sidewalk SQYD 1

23 Loop Test EACH 1

Group 3: District 7 Total

Group 3: Districts 6 and 7

District 6 Total

District 7 Total

Group 3 Total Bid