Bid Sheet Template Tenant Improvement.xlsx
XLSX spreadsheet 59 KB Posted
- Attached to
- N3203422 Minot Probation Office
- Solicitation number
- 47PD5326R0024
- Issued by
- Not on record
About this file
This is a Bid Sheet Template for Tenant Improvement pricing submissions under the GSA R8 Construction IDIQ contract vehicle. The template is specifically formatted for the ND0014, N3203422 Probation Remodel project in Minot, North Dakota, associated with solicitation 47PD5326R0024. Contractors submitting bids must use this exact price proposal format, which is the only format accepted by GSA.
The bid sheet organizes costs across Materials, Equipment, and Labor columns for various construction divisions following the 2016 CSI Masterformat. Relevant divisions for this probation office remodel include General Requirements (project management, superintendent, design allowance), Existing Conditions (selective demolition), Thermal and Moisture Protection (sound batt insulation), Openings (doors, frames, bullet-resistant glass), Finishes (carpet removal, wall demolition/construction, flooring, painting, ceiling tile), Furnishings (cabinet demolition and new breakroom cabinets), Fire Sprinkler, Plumbing (breakroom fixtures), HVAC (diffusers), Controls (thermostats), Electrical (lighting, power distribution), and Communications (data distribution and fiber runs). The template includes line items for subtotals by division, with a final construction cost calculation that applies General Conditions, Overhead, Profit, and Bond percentages. Offerors are responsible for accuracy and may expand the spreadsheet for additional divisions or line items as necessary. This is a Small Business Set-Aside contract for North Dakota involving both design and construction phase services for third-floor alterations at the Bruce M. Van Sickle Federal Building & Courthouse to accommodate increased probation staff and enclose space from the public corridor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3203422 - Amendment 4 - 20260723.pdf | ||
| N3203422 - Amendment 3 Cover - 20260721.pdf | ||
| N3203422 - Amendment 2 Package - 20260602.pdf | ||
| N3203422 - Amendment 1 Package - 20260522.pdf | ||
| SF24-23a.pdf | ||
| GSA527-21a.pdf | ||
| Bid Sheet Template Abatement.xlsx | XLSX spreadsheet | |
| Bid Sheet Template Restrooms.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tenant Improvement
| PROJECT TITLE: | ND0014, N3203422, Probation Remodel, Minot |
| Bidsheet | Tenant Improvements |
| PROJECT SOLICITATION #: |
Contractor Name: Date:
| Division | Materials | Equipment | Labor | Subtotal | Comments | |||||||||||
| # | Description | Unit | Quantity | Cost/Unit | Total | Unit | Quantity | Cost/Unit | Total | Unit | Quantity | Cost/Unit | Total | Subtotal | Comments | |
| 01 | GENERAL REQUIREMENTS | |||||||||||||||
| Project Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Superintendent | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Design Allowance | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Subtotal | $ - 0 |
| 02 | EXISTING CONDITIONS | |||
| Selective Demolition | $ - 0 | $ - 0 | See Element | |
| $ - 0 | ||||
| $ - 0 | ||||
| Subtotal | $ - 0 |
| 07 | Thermal and Moisture Protection | ||||
| Sound Batt Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 08 | Openings | ||||
| Door Demoliton | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Door Frames | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Doors | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Bullet Resistant Glass | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 09 | Finishes | ||||
| Carpet Tile and Cove Base Removal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Wall Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| New Wall Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Flooring | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Painting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Ceiling Tile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 12 | Furnishings | ||||
| Selective Demolition Cabinets | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| New Breakroom Cabinets | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 21 | Fire Sprinkler | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 22 | Plumbing | ||||
| Breakroom Fixtures | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 23 | HVAC | ||||
| Supply and Return Diffusers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 25 | Controls | ||||
| Thermostats and electronic controls. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 26 | Electrical | ||||
| Lighting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Power Distribution | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 27 | Communications | ||||
| Data Distribution | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 2nd Floor Data Work and Fiber Run | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| Construction Total | $ - 0 | |||
| General Conditions | % | $ - 0 | $ - 0 | |
| Overhead | % | $ - 0 | $ - 0 | |
| Profit | % | $ - 0 | $ - 0 | |
| Bond | % | $ - 0 | $ - 0 | |
| TOTAL CONSTRUCTION COST | $ - 0 |
Date Authorized Negotiator Signature
| NOTES | |
| 1 | Each Comment, if any, should have a note number and be explained in the notes section |
| 2 | Spreadsheet may be expanded as necessary for 2016 CSI Masterformat Divisions and/or additional line items |
| (Division can be listed as $0.00 if unused) | |
| 3 | Offeror is responsible for accuracy of the proposal in its entirety in this spreadsheet. |
| 4 | This Price Proposal Format will be the only format accepted by GSA. |
GENERAL SERVICES ADMINISTRATION R8 CONSTRUCTION IDIQ PROPOSAL BID FORMAT
Page &P of image1.png
File details come from the government source that posted it. Updated .