Bid Sheet Template Abatement.xlsx
XLSX spreadsheet 47 KB Posted
- Attached to
- N3203422 Minot Probation Office
- Solicitation number
- 47PD5326R0024
- Issued by
- Not on record
About this file
This is a Bid Sheet Template for tenant improvement pricing proposals under the GSA R8 Construction IDIQ contract vehicle. The template is designed specifically for the ND0014, N3203422 Probation Remodel project located at the Bruce M. Van Sickle Federal Building & Courthouse in Minot, North Dakota. Contractors must use this standardized format exclusively to submit pricing proposals, with no alternative formats accepted by GSA.
The bid sheet is structured to capture costs across Materials, Equipment, and Labor categories organized by 2016 CSI Masterformat Divisions. Required line items include General Requirements (Project Manager, Superintendent, Design Allowance), Existing Conditions (Abatement Contractor, 3rd Party Monitoring and Clearance), and General Conditions, Overhead, Profit, and Bond markups calculated as percentages. The project involves design-build services and construction for tenant improvements to accommodate increased probation office staff on the third floor, including renovation and enclosure of existing office spaces from the public corridor. This is a Full and Open After Exclusion contract set aside for small businesses in North Dakota. Contractors are responsible for the accuracy of all proposal data and may expand the spreadsheet as needed for additional line items or divisions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3203422 - Amendment 4 - 20260723.pdf | ||
| N3203422 - Amendment 3 Cover - 20260721.pdf | ||
| N3203422 - Amendment 2 Package - 20260602.pdf | ||
| N3203422 - Amendment 1 Package - 20260522.pdf | ||
| Bid Sheet Template Restrooms.xlsx | XLSX spreadsheet | |
| GSA527-21a.pdf | ||
| SF24-23a.pdf | ||
| Bid Sheet Template Tenant Improvement.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tenant Improvement
| PROJECT TITLE: | ND0014, N3203422, Probation Remodel, Minot |
| Bidsheet | Tenant Improvements |
| PROJECT SOLICITATION #: |
Contractor Name: Date:
| Division | Materials | Equipment | Labor | Subtotal | Comments | |||||||||||
| # | Description | Unit | Quantity | Cost/Unit | Total | Unit | Quantity | Cost/Unit | Total | Unit | Quantity | Cost/Unit | Total | Subtotal | Comments | |
| 01 | GENERAL REQUIREMENTS | |||||||||||||||
| Project Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Superintendent | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Design Allowance | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Subtotal | $ - 0 |
| 02 | EXISTING CONDITIONS | ||
| Abatement Contractor | $ - 0 | $ - 0 | |
| 3rd Party Monitoring and Clearance | $ - 0 | ||
| $ - 0 | |||
| Subtotal | $ - 0 |
| Construction Total | $ - 0 | |||
| General Conditions | % | $ - 0 | $ - 0 | |
| Overhead | % | $ - 0 | $ - 0 | |
| Profit | % | $ - 0 | $ - 0 | |
| Bond | % | $ - 0 | $ - 0 | |
| TOTAL CONSTRUCTION COST | $ - 0 |
Date Authorized Negotiator Signature
| NOTES | |
| 1 | Each Comment, if any, should have a note number and be explained in the notes section |
| 2 | Spreadsheet may be expanded as necessary for 2016 CSI Masterformat Divisions and/or additional line items |
| (Division can be listed as $0.00 if unused) | |
| 3 | Offeror is responsible for accuracy of the proposal in its entirety in this spreadsheet. |
| 4 | This Price Proposal Format will be the only format accepted by GSA. |
GENERAL SERVICES ADMINISTRATION R8 CONSTRUCTION IDIQ PROPOSAL BID FORMAT
Page &P of image1.png
File details come from the government source that posted it. Updated .